Forwards Insp Rept 50-424/85-36 on 850930-1004.No Violations or Deviations Noted.Mgt Meeting Held on 851021 in Region II to Discuss Insp Findings.Response by 851202 Re Assessment of Problem Requested
ML20138A330
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/25/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20138A335 List:
References
NUDOCS 8512110654
Download: ML20138A330 (3)


See also: IR 05000424/1985036

Text

_

,.

" -

L{clhv)

.

9

Novenber 25, 1985

peorgiaPowerCompany

/ ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Genti nen:

SUBJECT: REPORT NO. 50-424/85-36

On September 30 - October 4,1985, NRC inspected activities authorized by NRC

Construction permit No. CPPR-108 for your Vogtle facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

At your request, a management meeting was conducted in the NRC Region II office

on October 21, 1985. The meeting was held to discuss NRC inspection findings

documented in the enclosed inspection report. The details of this meeting are

addressed within paragraph 10 of the enclosed inspection report as a meeting

summary. If your understanding of the assessment of the problem or committed

corrective actions is different frot that detailed in the meeting summary, please

advise us no later than December 2, 1985.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL. SIGNED BY

JOHN A. OLSHINSKI h

J. Nelson Grace

Regional Administrator

Enclosure:

Inspection Report No. 50-424/85-36

cc w/ encl: (See page 2)

0512110654 e5112 24

PDR ADOCK0500hDR I

o u

Ital

-

.

.

' Georgia Power Company. 2 Noverrber 25, 1985

./cc R. w/ enc 1: Senior Vice President

E. Conway,

_/2 Nuclear Power

v0. O. Foster, Vice President

and-General Manager Vogtle Project

/H.H. Gregory,III, General

l.GManager,VogtleNuclearConstruction

Bockhold, Jr. , Vogtle

Plant Manager

/L.T.Gucwa, Chief

Nuclear Engineer

/RubleA. Thomas,

Vice President-Licensing Vogtle

Project

/dGroover,

E Quality

Assurance Site Manager

C. W. Hayes, QA Manager

J. T. Beckham, Vice President

& General Manager - Operations

YJ.A. Bailey,ProjectLicensing

Manager

/GeorgeF.Trowbridge,Esq.

f Shaw,-Pittman, Potts and Trowbridge

JBruce W. Churchill, Esq..

Shaw, Pittman, Potts and Trowbridge

'

lErnest L. Blake, Jr., Esq.

j Shaw,.Pittman, Potts and Trowbridge

VJames E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

vdamesG.Ledbetter, Commissioner

Department of Human Resources

/CharlesH. Badger,Officeof

Planning and Budget, Management

/ Review Division

vDeppish Kirkland, III, Counsel

Office of the Consumer's Utility

Council

v' Douglas C. Teper, Georgians Against

'

f Nuclear Energy

VLaurie Fowler, Esq., Legal Environmental

Assistance Foundation

' -

.

Tim Johnson, Executive Director

f Campaign for a Prosperous Georgia

SMorton B. Margulies, Esq., Chairman

l" . Administrative Judge, Atomic Safety

< and Licensing Board Panel

'(cc w/enci cont'd - see page 3)

i

i

- - - - - _ _ - - - - - - - - - - - -- - - -

- - - _ _ , .

. .,

.

.

Georgia Power, Company 3 November 25, 1985

(cc w/enci cont'd)

}Dr.OscarH. Paris,AdministrativeJudge

/ Atomic Safety and Licensing Board Panel

VGustave A. Linenberger, Jr., Administrative

Judge, Atomic Safety and Licensing Board

Panel.

jBilliePirnerGarde, Citizens

Clinic Director, Government

Accountability Project-

b

/ ec w/ enc

E. Reis, ELD1:

M. Sinkule, RII

tffRC Resident Inspector

Document Control Desk

State of. Georgia

,

-.

RI RII RII RII . R

p

FMcCoy. -

CJul an A n MSinkule V8rownlee RWalker-

11/// /85

f/

11/ 5 85 11//y85 11/ /85 11/g/85 11/Jr/85

RII

JO s ski

11/$t/85