ML20138A275

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/86-03 & 50-425/86-02 on 860113-24.No Violations or Deviations Noted.Attention Invited to Unresolved Items Identified in Insp Rept
ML20138A275
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/10/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20138A283 List:
References
NUDOCS 8603140180
Download: ML20138A275 (3)


See also: IR 05000424/1986003

Text

(,

c;

-

310 M kN

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

I

Gentlemen:

SUBJECT: REPORT NOS. 50-424/86-03 AND 50-425/86-02

On January 13-24, 1986, NRC inspected activities authorized by NRC Construction

Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At the conclusion of

I the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

i representative records, interviews with personnel, and observation of activities

.in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

'

report. These matters will be pursued during future inspections.

Should you have any questions concerning this letter, please contact us.

Sincerely.

O,; pal s,yed bl

Virgli t.. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-424/86-03

and 50-425/86-02

cc w/ enc 1:

R. E. Conway, Senior Vice President &

Project Director

D. O. Foster Vice President, Project

Support

P. D. Rice, Vice President, Project

Engineering

R. H. Pinson, Vice President, Project

i

Construction

cc w/ encl: (Cont'donpage2)

'

e [ l

_ _me

. - _ - _ . _ _ _ _ _ _ _ _ _ _ .

,

  • .

( .

Georgia Power Company 2

MAR 1019}

, (ccw/ enc 1: cont'd)

'

J. T. Beckham, Vice President & General

Manager - Operations

R. A. Thomas, Vice President, Licensing

- C. W. Hayes, Vogtle Quality Assurance

Manager .

'

W. C. Ramsey, Manager - Readiness Review

G. B. Bockhold, General Manager,

! Nuclear Operations

L. T. Gucwa, Chief Nuclear Engineer

M. H. Googe, Project Construction ,

Manager

E. D. Groover, Quality Assurance

Site Manager - Construction

J. A. Bailey, Project Licensing Manager

G. F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

B. W. Churchill, Esq., Shaw,

! Pittman, Potts and Trowbridge

l

E. L. Blake, Jr. , Esq. , Shaw,

'

Pittman, Potts and Trowbridge

J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

! J. G. Ledbetter, Commissioner,

! Department of Human Resources

l C. H. Badger, Office of Planning

l and Budget

D. Kirkland, III, Counsel, Office

of the Consumer's Utility Council

,

D. C. Teper, Georgians Against

l Nuclear Energy

l L. Fowler, Esq.

} T. Johnson, Executive Director,

Educational Campaign for a

'

.

l Prosperous Georgia

M. B. Margulies Esq., Chairman,  !

Atomic Safety and Licensing Board

l Panel

l

Dr. O. H. Paris, Administrative Judge

l

'

Atomic Safety and Licensing Board

Panel

G. A. Linenberger, Jr., Administrative

'

Judge, Atomic Safety and Licensing

Board Panel

i B. P. Garde, Citizens Clinic, Director '

Government Accountability Project

l

'

I

(Seepage 3)

'

bec w/ enc 1:

l

i

r

.

F

N ,

Georgia Power Company 3

N

bec w/ enc 1:

E. Reis ELD

W. M. Hill, IE

M. Miller, NRR-

W. Brach EDO

M. Sinkule, RII

W. Rankin, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

RII MM RIgy

GHa11strom:bhg lake Herdt

u - se inu usies g/g<

e