Text
Ie
.
4
MAR 101986
6
Docket No. 50-461
Illinois Power Company
ATTN: Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. S. G. DuPont
and G. F. O'Dwyer of this office on November 12, 1985, through February 7, 1986,
i
of activities at Clinton Power Station authorized by NRC Construction Permit
No. CPPR-137 and to the discussion of our findings with Mr. D. P. Hall and
f
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
!
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in
violation of NRC requirements, as described in the enclosed Notice. With
l
respect to item two, the inspection shcwed that action had been taken to
j
correct the identified violation and to prevent recurrence. Our understanding
of your corrective actions are described in Paragraphs 4.c and 6.d.(1) of the
l'
enclosed inspection report. Consequently, no reply to the violation is
required and we have no further questions regarding this matter at this time.
Regarding item one, a written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice (Order)
!
are not subject to the clearance procedures of the Office of Management
l
and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
l
?
i
!
~
e603140021 860310
ADOCM 05000461
G
If
e
IEp!
.
.
MAR 101986
Illinois Power Company
2
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
'C.t hni CI72I D'0' d'-
J. J. Harrison, Chief
Engineering Branch
Enclosures:
1.
2.
Inspection Report
No. 50-461/85061(DRS)
cc w/ enclosures:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
Gary N. Wright, Manager
Nuclear Facility Safety
Jean Foy, Prairie A111snce
Mark Jason, Assistant
Attorney General,
Environmental Control Division
H. S. Taylor, Quality Assurance
Division
Yes
Yt1
""'
"50W
$0h
(
'
/kst
O'
er
Ring
H rison
A bL a i
sh *
1-7-14
sjio
3 go p
ii
.
_ - _ _ .
.
-
_.
.
-
- - . -
.-