Special Rept 85-11:updates List of Nonfunctional Fire Barriers Reported in 850812 Special Rept 85-10.Nonfunctional Fire Barriers Detected Since Last Rept But Not Restored to Functional Status within 7 Days Listed
ML20137Z339
Person / Time
Site: Rancho Seco
Issue date: 09/19/1985
From: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
85-11, RJR-85-473, NUDOCS 8510080221
Download: ML20137Z339 (13)


Text

-

KECEIVED esuu.

SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 s street, P.O. Box 15830, sacramento CA 95852-1830 (916) 452-3211 AN ELEC%C$57Q7M MRDi$6 THE HEART OF CALIFORNIA RJR 85-473 REG l0WIP September 19, 1985 J B MARTIN REGIONAL ADMINISTRATOR REGION V 0FFICE OF INSPECTION AND ENFORCEMENT ATTENTION DOCUMENT CONTROL DESK U S NUCLEAR REGULATORY COMMISSION WASHINGTON D C 20555 DOCKET NO. 50-312 LICENSE NO. DPR-54 SPECIAL REPORT NUMBER 85-11 The Sacramento Municipal Utility District hereby submits Special Report 85-11 in accordance with Rancho Seco Nuclear Generating Station Technical Specifica-tion, Sections 3.14.6.2 and 6.9.5.E.

This report provides an updated list (attached) of nonfunctional fire barriers reported in our August 12, 1985 Special Report 85-10 and identifies any nonfunctional fire barriers detected or created since that report which were not restored to functional status within seven days.

The District has evaluated each nonfunctional barrier against the requirements of Technical Specification 3.14.6 and has verified that the appropriate fire watch has been established.

The District's August 12, 1985 Special Report 85-10 provided a description of its program and associated schedule.

The schedule for the completion of the penetration program has been extcnded because of the District's emphasis on completion of the walkdowns that resulted from the high point vent pipe leak and development of managements control of construction activities, including new procedures and associated training.

A detailed update to the status for penetration program areas follows:

1.

Electrical Penetrations - Electrical penetration work as identified in Special Report 85-10 has been completed.

However, additional electrical penetration work is continuing because of:

(1) the receipt of addi-tional test data that results in some additional repairs; (2) the de-cision to remove the remaining few cable tray flammastic seals and replace them with foam seals; and (3) new breaches resulting from the continued outage work.

These identified activities are scheduled for completion by November 29, 1985.

As previously stated, the conduit through cable tray seals (identified by a C on the list) will require additional fire tests to determine appropriate resolution.

These fire tests are scheduled to begin in November, 1985.

As previously stated, the inaccessible bus ducts (identified by a BD on the list) will not be sealed until the next scheduled refueling outage.

8510080221 850919 DR ADOCK 05000312 g

PDR 7g/

RANCHO SECO NUCLEAR GENERATING STATION 1444o Tmn Cities Road, Herald, CA 95638 9799;(209) 333-29

. 2.

Mechanical Penetrations - The detailed walkdown of all me hanical pene-trations has been completed.

Each seal is being analyzed to substantiate its fire rating with a fire test report of engineering analysis performed by a registered fire protection engineer.

Seals which cannot be sub-stantiated are being reworked or replaced.

These activities are scheduled for completion by January 15, 1986.

3.

Doors - The efforts to repair the doors have resulted in the identifica-tion of several doors that will now have to be replaced that had not previously been scheduled. A schedule for these replacement doors will be provided in a future special report when the delivery schedule has been determined.

The problems identified in the previous reports with the field labeling efforts has been resolved and these doors have been labeled.

Door repairs and replacement of doors is continuing.

These activities are scheduled for completion by November 30, 1985.

4.

Dampers - Damper work has been slowed down because of the walkdowns. These activities are scheduled for completion by March 1, 1986.

The eight exist-ing dampers between the control room and the TSC are still under evaluation to determine the required repairs and the schedule for these repairs.

The two " missing" dampers between the TSC and the auxiliary building roof are still under evaluation to determine if their installation is required.

All of the above schedules are based on information as of the date of this letter.

Because of the uncertain nature of materials delivery, manpower level restrictions and problems identified during repair / installation, these schedules may require modification.

Therefore, as new information is received, the District will update these schedules to reflect the new information.

If you have any questions concerning this report, please contact Mr. Ron Colombo att%RanchoSecoNuclearGeneratingStationUnitNo.1.

\\N Q

/

R. J. RODRIGU ASSISTANT GENER

MANAGER, NUCLEAR Attachment cc: Director, NRR

Page No.

1 09/12/84 FIRE BARRIER BRFXHES ELECIRICAL PENEIRATIONS PENEIRATION NUMBER FIRE AREA DETTECTION ZONE 01-17 AM l-17 04-13 01-17 BQ 1-17 04-13 02-14 AA 2-14 5-7 05-25 AA Rrl-RM1 06-19 15-71/2 AA 15-71/2 11-10 15-71/3 AA 15-71/3 11-10 15-71/3 AB 15-71/3 11-10 15-71/3 AC 15-71/3 11-10 15-71/3 AD 15-71/3 11-10 16-17 AA C

16-17 12-13 16-17 AB C

16-17 12-13 16-17 AE C

16-17 12-13 2

16-29 AA C

16-29 12-19 17-18 AA C

17-18 13-14 17-18 AB C

17-18 13-14 i

17-18 AC C

17-18 13-14 17-18 AD C

17-18 13-14 1

l 17-18 AF C

17-18 13-14 17-20 AB C

17-20 13-16 17-20 AC C

17-20 13-16 17-29 AA C

17-RM1 13-19 17-29 AB C

17-RM1 13-19 17-29 AC C

17-RM1 13-19 17-29 AD C

17-RM1 13-20 l

17-29 AE C

17-29 13-20 17-31 AA BD 17-31 13-37 i

17-31 AB BD 17-31 13-37 18-19 AA C

18-19 14-15 18-19 AB C

18-19 14-15 18-19 AC C

18-19 14-15 18-31 AB C

18-31 14-37 18-31 AC C

18-31 14-37 18-31 AD C

18-31 14-17 18-31 AE C

18-31 14-37 18-31 AF C

18-31 14-37 18-31 AG 18-31 14-37 18-31 AH 18-31 14-37 18-47 AA C

18-47 14-46 18-47 AB C

18-47 14-46 19-20 AB C

19-20 15-16 19-20 AC C

19-20 15-16 19-20 AD C

19-20 15-16 19-32 AC C

19-32 15-38 19-32 AE C

19-32 15-38 19-32 AF C

19-32 15-38 19-81 AB 19-81 15-81 20-29 AA C

20-RM1 16-20 20-29 AB C

20-RM1 16-20 20-29 AC C

20-RM1 16-20 l

Page No.

2 09/12/84 FIRE BARRIER BREACM:S EIECIRICAL PDEIRATIONS PDEIRATION NUMBER FIRE AREA DETTECTION ZONE 20-29 AE C

20-RM1 16-20 20-29 AF C

20-RM1 16-20 20-32 AA C

20-32 16-38 20-32 AB BD 20-32 16-38 20-32 AC BD 20-32 16-38 21-33 AA C

21-33 17-39 22-29 AA C

RGl-RM1 18-20 27-29 AB C

27-RM1 20 27-29 AC C

27-RM1 20 28-29 AA C

28-RM1 20 29-71 AA C

RM1-71 19 29-71 AB C

29-71 29-71 30-31 AA C

30-31 36-37 30-31 AC BD 30-31 36-37 30-31 AE BD 30-31 36-37 30-31 AG C

30-31 36-37 30-31 AH C

30-31 36-37 30-71 AA C

30-71 33-36 30-71 AA BD 30-71 36-33 30-71 AE 30-71 33-36 30-71 AF BD 30-71 36-33 30-71 AG C

30-71 33-36 31-32 AA BD 31-32 36-37 31-32 AC 31-32 36-37 31-36 AA C

31-36 37-42 31-36 AB C

31-36 37-42 31-36 AC C

31-36 37-42 32-33 AA C

32-33 38-39 32-36 AA C

32-36 38-42 32-36 AC C

32-36 38-42 32-36 AD C

32-36 38-42 32-36 AG C

32-36 38-42 32-36 AH C

32-36 38-42 33-36 AA C

33-36 39-42 33-36 AB C

33-36 39-43 34-36 AA C

RGl-36 43 34-36 AB C

RGl-36 43 34-36 AD C

RGl-36 43 34-36 AE C

RGl-36 43 34-36 AF C

RGl-36 43 34-64 AA C

RG1-64 42 34-64 AB C

RG1-64 42 36-64 AA C

36-64 42 36-64 AB 36-64 42 36-71/1 AA C

36-71/1 33-42 39-50 AA RGl-RB1 47-43 45-46 AD C

45-46 46 46-47 AA C

46-47 46 46-47 AB C

46-47 46 47-49 AB C

RB1-47 46

Page No.

3 09/12/84 TIRE BARRIER BREAOIES ELECIRICAL PDEIPATIONS PDEIRATION NGIBER FIRE AREA DETECTION ZONE 47-49 AC C

47-RB1 46 50-66 AA 47-48 46-47 75/1-77/2 AA 75/1-77/2 75-77 75/1-77/2 AB 75/1-77/2 75-77 75/1-81 AA 75/1-81 75-81 75/1-81 AB 75/1-81 75-81 76/1-78/2 AA 76/1-78/2 76-78 76/1-78/2 AB 76/1-78/2 76-78 76/1-82 AA 76/1-82 76-82 76/1-82 AB 76/1-82 76-82 76/1-83/1 AB 76/1-83/1 76-83 78/2-82 AB 78/2-82 78-82 83/1-84/1 AA 83/1-84/1 83-84 83/1-84/1 AB 83/1-84/1 83-84 83/1-84/1 NO ID 83/1-84/1 83-84 84/1-90/2 AA 84/1-90/2 84-90 84/1-90/2 AB 84/1-85/1 84-05 85/1-85/2 85/1-85/2 85 85/1-85/3 AA 85/1-85/3 85 85/1-85/4 AA 85/1-85/4 85 85/1-85/4 AB 85/1-85/4 85 85/3-88 AA 85/3-88 85-88 85/3-88 AB 85/3-88 85-88 88-90/2 AA 88-90/2 88-90 88-90/2 AB 88-90/2 88-90 19-46 AA C

19-46 15-46 90/1-90/2 AA 90/1-90/2 90 90/1-90/2 AB 90/1-90/2 90

Pacie No.

1 09/12/84 FIRE BARRIER BRFA GES MEGANICAL PENEIPATIONS PENUIRATION NUMBER FIRE AREA fan.x.;nON ZONE 0104 (NSEB) 75/1-81 75-81 0110(NSEB) 76/1-82 76-82 0122(NSEB)

  • /5/3-83/2 75-83 0125(NSEB) 83/1-83/2 83 0129(NSEB) 83/1-83/2 83 0130(NSEB) 83/1-83/2 83 0131(IGEB) 83/1-83/2 83 0132(NSEB) 82-83/1 82-83 0134(NSEB) 81-83/1 81-83 Ol37(NSEB) 81-83/1 81-83 0138(NSEB) 82-83/1 82-83 0143(NSEB) 75/1-75/2 75 0144 (NSEB) 76/1-76/2 76 0148(NSEB) 76/1-83/1 76-83 0149(NSEB) 75/1-83/1 75-83 0207(NSEB) 78/2-84/1 78-84 0214(NSEB) 83/1-83/2 83 0224 (NSEB) 77/1-77/2 77 0225(NSED) 78/1-78/2 78 0226(NSEB) 84/1-84/2 84 0230(!EEB) 84/1-84/3 84 0239(IEEB) 75/1-77/1 75-77 0240(NSEB) 77/1-77/2 77 0241(NSEB) 76/1-78//l 76-78 0242 (IGEB) 78/1-78/2 78 0303(NSEB) 79-87 79-87 0304 (NSEB) 79-87 79-87 0305(NSEB) 79-85/3 79-85 0308(NSEB) 85/3-88 85-88 0309(NSEB) 85/3-88 85-88 0313(NSEB) 85/1-87 85-87 0316(NSEB) 85/2-89 85-89 0319(NSEB) 80-89 80-89 0321(NSEB) 85/1-89 85-89 0326(NSED) 85/1-89 85-89 0327(NSEB) 85/1-87 85-87 0334 (NSEB) 85/1-85/2 85 0335(NSEB) 83/2-85/3 83-85 0337(IEEB) 85/1-85/3 85 0338(NSEB) 85/1-85/2 85 0339(NSEB) 85/1-85/3 85 0340(NSEB) 85/1-85/2 85 0341(NSEB) 85/3-87 85-87 0342(NSEB) 85/2-89 85-89 0343 (NSEB) 83/2-87 83-87 0344 (NSEB) 85/1-85/2 85 0401(NSEB) 83/2-91/1 83-91 0402(NSEB) 85/3-91/1 85-91

w

--__tw1 Pacje No.

2 09/12/84 FIRE SERUR BRFKHES MEQ WIICAL PENEIRATIONS PDIEIRATION IGBER FIRE AREA imiu;nON ZONE 1025 (HIC S14)

RGl-Rrl 05-07 1029 Rrl-69 07 1031 Rrl-27 20-109 1032 Rrl-27 20-109 i

1037 Rrl-27 20-109 1070 Rrl-2 05-104 1071 Rrl-2 05-104 1072 Rrl-6 06 1078 RM1-6 06-19 1081 Rrl-1 04-109 1082 Rrl-1 04-109 1084 02-03 104-5 1097 Rrl-6 06 2071 (INERGDICY VDir) 20-29 16-20 2072 (DiERGDICY VDTI) 17-29 13-20 2083 RM1-71 10-19 2206 (HIC SO9)

RG1-RM1 20 2226 (RIC S08) 27-RM1 20 2232 28-RM1 20 3010 36-RG1 43 3020 36-RG1 43 3022 RB2-RG1 43-46 3023 RB2-RG1 43-46 3028 33-36 39-43 3029 33-36 39-43 3030 32-36 38-42 3031 32-36 38-42 3032 RGl-36 43 3033 36-67 43 3034 36-67 43 3035 36-RG1 43 3036 36-RG1 43 3037 72-RG1 42 3038 RGl-36 42 3039 RGl-36 42 3040 RGl-36 42 3041 BGl-36 42 3042 RGl-36 42 3043 El-36 43 3044 72-RG1 42 3045 RGl-36 42 3046 BGl-36 42 3047 RGl-36 42 3049 33-36 39-43 3050 33-36 39-43 3051 33-36 39-43 3054 47-PG1 42 3056 47-RG1 42 3058 RGl-36 42-43 3063 RGl-36 42-43

PaKje No.

3 09/12/84 FIRE BARRIER BRFAOES MEQWIICAL PE2EITRTIQiS PDEIT&TIQi NUMBER FIRE AREA ut;m;nON ZONE 3065 38-36 41-42 3066 38-36 41-42 3067 RGl-64 42 3068 RG1-64 42 3069 36-64 42 3070 31-36 37-42 3071 30-71 34-36 3072 30-71 34-36 3073 30-71 34-36 3074 30-71 34-36 3076 31-36 37-42 3077 31-36 37-42 3079 31-36 37-42 3083 30-31 36-37 3084 37-71 34-40 3085 37-71 34-40 3086 37-71 34-40 3087 37-71 34-40 3088 37-71 34-40 3090 33-36 39-42 3091 32-36 39-42 3092 RGl-36 42 3093 RGl-36 42 3095 31-36 37-42 3096 62-64 42 3119 38-71 41-33 3120 37-71 40-33 3121 36-71 33-42 3122 36-71 33-42 3123 32-33 38-39 3124 31-32 36-37 3125 30-31 36-37 3127 36-RG1 43 3128 37-71 33-40 3129 37-71 33-40 3130 32-36 38-42 3131 31-36 37-42 3140 47-69 42 3141 47-69 42 3142 47-69 42 3143 47-69 42 3144 47-69 42 3145 RGl-36 43 3146 36-62 42 3147 47-62 42 3148 47-RB1 46 3149 RB1-RG1 43-47 3150 36-RB2 46 3151 36-RB2 46 3156 33-36 42

Page No.

4 09/12/84 FIRE BARRIER BREAGES MEGANICAL PDEIFATIONS PENEIRATION NUMBER FIRE AREA DETECTION ZOtE 3158 47-RG3 42 3159 (nic S13) 36-RG1 42 3160 36-RG1 42 3161 (HIC S12) 36-RG1 42 3162 (HIC Sll) 36-R31 42 3163 (nic S10) 30-36 42 4121 RB1-RB2 46-47 4254 RB1-47 47-48 4286 RB1-RB2 46-47 4408 47-RB2 46 4409 47-RB2 46 4412 47-RB2 46 4421 47-RB2 46 4422 47-RB2 46 4458 47-48 46-47 4459 47-48 46-47 4460 47-48 46-47 4461 47-48 46-47 4466 47-48 46-47 4467 47-48 46-47 4468 48-RB1 47 4470 47-48 46-47 4491 56-RB1 47-48 4492 56-RB1 47-48 4493 56-RB1 47-48 4494 56-RB1 47-48 4507 RB1-RB2 46-47 4525 47-RB2 46 4526 47-RB2 46 4527 47-RB2 46 4528 47-RB2 46 4529 47-RB2 46 4530 47-RB2 46 4531 47-RB2 46 4532 47-RB2 46 4538 47-RB1 46-47 4539 47-RB1 46-47 4540 47-RB1 46-47 4541 47-RB1 46-47 4542 47-RB1 46-47 4543 57-RB1 48-47 4544 47-RB1 46-47 4545 47-RB1 46-47 4546 57-RB1 48-47 4547 48-56 48-47 4548 57-RB1 48-47 5001 47-57 48 5002 56-57 48 5003 56-57 48 5004 56-57 48

Pa$a No.

5 09/12/84 FIRE BARRIER BRFX HES MEGANICAL PENEIRATIONS PINEIRATION NUMBER FIRE AREA DETECTION ZONE 5005 56-57 48 5008 56-57 48 5009 56-57 48 5010 56-57 48 5011 56-57 48 5012 56-57 48 5013 56-57 48 5020 47-56 48 EXPANSION JOINT (UNSEAI.ED) 27-28 20 EXPANSION JOINT (UNSEAIID) 56-57 48

Page No.

1 09/12/84 FIRE BARRIER BRFXHES FIRE DAMPERS DAMPER NUMBER FIRE AREA imm;nON ZONE FD-01 1-2 04-104 FD-02 1-2 05-104 FD-03 1-2 04-104 FD-04 1-2 04-104 FD-05 1-2 04-104 FD-06 1-2 04-104 FD-07 1-2 04-104 FD-08 1-2 04-104 FD-18 15-RM1 11-19 FD-18A 6-Rrl 06 FD-19A Rrl-RG1 05 FD-20A 27-RIl 06-20 FD-21 14-31 13-37 FD-21A 27-64 20-42 FD-22 32-20 16-38 FD-22A 27-28 20 FD-23 RGl-36 42 FD-23A RGl-RM1 18 FD-24A RGl-BM1 18 FD-25 47-48 46-47 FD-25A 36-M1 42 FD-26A 20-21 16-17 FD-27A 21-20 46 FD-28 RB1-RB2 47 FD-28A 21-20 46 ED-29A 16-17 12-13 FD-30A 16-17 12-13 FD-31A 16-17 12-13 FD-32A 47-RB2 46 ED-41 56-47 47-48 FD-42 Rrl-RG1 05 FD-43 RD-BG1 05 FD-46 Rrl-RG1 05 FD-47 Rrl-BG1 05 FD-48 Rrl-M1 05 FD-NO3(NSEB) 75/1-81 75-81 FD-N10(NSEB) 76/1-82 76-82 FD-N40(NSEB) 85/1-85/3 85 FD-N48(NSEB) 85/1-87 85-87 FD-N49(NSED) 85/1-89 85-89 FD-N54(NSEB) 85/1-85/2 85 MISSING DAMPER 02-74 104 MISSING DAMPER 02-74 104 PDEr. 'IO BE PIDGGED 36-PG1 42 PDEr. '!O BE PIDGGED 47-RB2 42 PDEr. 'IO BE PIDGGED 36-M1 42

'l

Page No.

1 09/12/84 FIRE BARRIER MEA GES FIRE DOORS l

FIRE DOOR FIRE AREA DETECTION ZONE ACCESS HATOI R41-38 19 AU102 36-RG1 43 AU109 R61-72 42 AUlli 33-36 39-42 AUll3 32-36 38-42 AUll4 32-36 38-42 AUll6 18-19 14-15 AU117 31-32 37-38 AU120 31-46 37-42 AU121 30-36 36-42 AU123 30-71 33-36 AU127 47-PG1 42 AU128 38-69 41 AU129 FG3-69 42 AU130 36-38 41-42 AU132 NEED FOAM 38-71 33-41 AU133 NEED ICAM 37-71 33-40 AU134 37-69 40 AU135 33-36 39-43 AU136 47-64 42-YARD AU201 67-RM1 18 AU202 BGl-RM1 18 AU203 RGl-RM1 18-20 AU205 28-RM1 20 AU207 27-28 20 AU208 21-BM1 17-20 AU209 21-RM1 17-18 AU211 NEED EUAM 20-RM1 16-20 AU215 NEED IDAM 17-RM1 13-19 AU216 16-RM1 12-19 AU218 71-BM1 10-19 AU220 71-RM1 10-19 AU221 NEED EUAM 71-RM1 10-19 AU225 RM1-27 20 AU319 72-RIl 07 AU333 1-Rrl 04-06 AU334 NEED EDAM l-Rr1 03-06 AU344 6-Rr1 06 ADBOB 18-19 14-15 AUB12 48-49 47 AUB61 19-81 15-81 AUB62 18-82 14-81 NS063 NEED FOAM 81-82 81-82 NS153 NEED IDAM 83/1-83/2 83 NS154 NEED FOAM 76/1-76/3 76 NS155 NEED IDAM 76/1-76/2 76 NS156 NEED FCAM 75/1-75/2 75 NS157 NEED FCAM 75/1-75/3 75 NS160 NEED IVAM 82-83/1 82-83

Page No.

2 09/12/84 FIRE BARRIER BREACHES FIRE DOORS FIRE DOOR FIRE AREA Drau;nON ZONE NS232 NEED FCAM 82-84/1 82-84 NS233 NEED FCAM 81-84/1 81-84 NS238 77/2-84/1 77-84 NS238 77/2-84/1 77-84 NS242 NEED IDAM 83/2-84/1 83-84 NS355 NEED FCAM 85/1-85/2 85 NS356 NEED FDAM 83/2-85/1 83-85 NS357 85/4-2 85/4-104 NS358 NEED FOAM 79-85/3 79-85 NS359 NEED FDAM 80-85/2 80-85 NS403 85/5-91/1 85-91 L