ML20137Z057
| ML20137Z057 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 10/03/1985 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| References | |
| NUDOCS 8510080152 | |
| Download: ML20137Z057 (1) | |
Text
A OS OCT 031985 i
Docket No. 50-461 Illinois Power Company ATTN: Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 Gentlemen:
The NRC has received an allegation that the safety-related HVAC control panels at Clinton, that are being (or have been) installed by MCC Powers Company, were manufactured by Illinois Fabricators without benefit of a Quality Assurance program. The alleger stated that since,there was no Quality Assurance program when the panels were constructed, there was no control of welding, special processes, inspection, and material control.
This information is forwarded to Illinois Power Company for review and followup.
We request that the results of your review and disposition of this matter be submitted to Region III after completion.
Documentation supporting your results should be maintained onsite for audit by Region III.
Your cooperation with us is appreciated.
Should you have any questions with regard to this matter, please call Mr. R. F. Warnick (312) 790-5575.
Sincerely, 1'Origfool Sipad by C.E. Eralles" 1
Charles E. Norelius, Director Division of Reactor Projects cc: /DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Richard Hubbard Gary N. Wright, Manager Nuclear Facility Safety 8510000152 851003 Jean Foy, Prairie Alliance PDR ADOCK 05000461 Allen Samelson, Assisi; ant A
PDR Attorney General, Environmental Control Division H. S. Taylor, Quality Assurance Division Y65 t
RIII R I-RIII RIII RIII RRO bbl
- 1 ce Warnick rrison Weil enman tOfelius 10/ % 85 10/3/85 10/7/85 10/3/85 10/3/85 g
IE #1