ML20137Y787

From kanterella
Jump to navigation Jump to search
Special Rept 86-03:updates List of Nonfunctional Fire Barriers Reported in 860130 Special Rept 86-02 & Identifies Nonfunctional Fire Barriers Detected or Created Since Last Rept Issued
ML20137Y787
Person / Time
Site: Rancho Seco
Issue date: 03/04/1986
From: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
86-03, 86-3, RJR-86-91, NUDOCS 8603120383
Download: ML20137Y787 (12)


Text

.

$ SMUD SACRAMENTO MUNICIPAL UTIUTY DISTRICT E3 62o1 S street, P.o. Box 15830, Sacramento CA 95852-1830,(916) 452 3211 AN ELECT RIC SYSTEM SERVING THE HEART OF CALITOHNIA RJR 86-91 March 4, 1986 J B MARTIN REGIONAL ADMINISTRATOR REGION V 0FFICE OF INSPECTION AND ENFORCEMENT ATTENTION DOCUMENT CONTROL DESK U S NUCLEAR REGULATORY COMMISSION WASHINGTON DC 20555 D0CKET NO. 50-312 LICENSE N0. DPR-54 SPECIAL REPORT NUMBER 86-03, FIRE BARRIERS The Sacramento Municipal Utility District hereby submits Special Report 86-03 in accordance with Rancho Seco Nuclear Generating Station Technical Specifi-cations, Section 3.14.6.2 and 6.9.5E.

This report provides an updated list (attached) of non-functional fire barriers reported in our January 30, 1986 Special Report 86-02, and identifies any non-functional fire barriers detec-ted or created since that report which were not restored to functional status within seven (7) days.

The District has evaluated each non-functional fire barrier against the re-quirements of Technical Specification 3.14.6 and has verified that the proper fire watch has been established.

The District is currently developing the capability to include in the list of breac. Sed barriers the plan and schedule for restoring each fire barrier penetration to its functional status.

It is intended that the additional in-formation will be used in the establishment of a programmatic plan which will significantly reduce the number of fire barriers being non-functional for a period greater than seven (7) days. Tne upgraded report is expected to be available by April 15, 1986.

An updated status for each penetration program discipline is given in the following paragraphs:

1.

Electrical Penetrations - The fire tests for the conduit penetration seals have been completed and the results are being incorporated into the District's calculations.

The incorporation of the fire test results into the calculations is expected to result in the approval of all of the con-duit seals that are designated by "C" in the comments column of the attached list.

Breaches identified as surveillance ite.is remain scheduled for a March 31, 1986, completion.

2.

Mechanical Penetrations - The expansien joint remains as the only item from the originally identified scope of work.

The other mechanical pene-trations listed in the attachment have resulted from ongoing plant work and surveillance testing recently completed.

b 0603120393 860304 i

t PDR ADOCK 05000312 i

i S

ppg

J B MARTIN 3.

Doors - All door work remains scheduled for completion by March 15, 1986.

4.

All scheduled damper work has been completed; however, 10 fire dampers in the Control Room / Technical Support Center area are being evaluated to d

r ne their disposition and may require repair or installation work.

s l

(VvN R. J.

ODRIGUE ASSISTANT GENER

MANAGER, NUCLEAR Attachment cc:

Director, NRR

I b

LEGEND FOR FIRE BARRIER BREACHES C

CONDUIT (Conduit through cable tray seals requiring additional fire tests.)

BD BUS DUCTS (Inaccessible until next scheduled refuelling outage.)

NB NEW BREACHES S

SURVEILLANCE ITEMS i

t l

l

[

b h

F I

I J

i e

r

Acgo PD.

1 02/25/66 ATTACHMENT TO NRC SPECIAL REPORT ELECTRICAL PENETRATIONS PENETRATION COMMENTS FIRE AREA DETECTION ZONE NUMBER FROM TO FROM TO 01-17 AB S

01 17 003 013 01-17 AC NB 01 17 004 013 01-17 AH NB 01 17 003 013 01-17 AH C

01 17 004 013 7

01-17 AJ S

01 17 004 013 01-17 AQ S

01 17 004~

013 01-17 BC S

01 17 003 013 01-17.BJ S

01 17 004 013 01-17 BD NB 01 17 004 013 01-17 BE S

01 17 003 013 01-17 BF S

01 17 003 013 01-17 BL 5

01 17 004 013 01-17 BM S

01 17 004 013 01-17 BY S

01 17 004 013 01-20 AA NB 01 20 004 016 01-20 AA C

01 20 004 016 i

01-20 AB C

01 20 004 016 01-20 AB NB 01 20 004 016 4

02-20 AA S

02 20 016 104 15-16 AC S

15 16 011 012 i

15-71/2 AA S

15 71/2 010 011 15-71/3 AA BD 15 71/3 010 011 15-71/3 AB S

15 71/3 010 011 15-71/3 AC BD 15 71/3 010 011 15-71/3 AD S

15 71/3 011 010 16-17 AA C

16 17 012 013 i

16-17 AB S

16 17 012 013 16-17 AE NB 16 17 012 013 16-29 AA C

16 29 012 019 16-29 AA NB 16 29 012 019 16-31 AA C

16 31 012 037 17-10 AA NB 17 18 013 014 i

17-18 AA S

17 18 013 014 17-18 AB C

17 18 013 014 l

1 17-18 AC ND 17 18 013 014 17-18 AE S

17 18 014 013 17-18 AE NB 17 18 013 014 i

17-18 AF G

17 18 013 014 I

i 17-20 AC C

17 20 0t3 016 17-20 AC NB 17 20 013 016 17-29 AA C

RM1 17 013 020 4

17-29 AE C

RM1 17 013 020 17-31 AA DD 17 31 013 0'17 17-31 AB ED 17 31 013 037 L

t

Pcgo No.

2 C2/25/86 ATTACHMENT TO NRC SPECIAL REPORT ELECTRICAL PENETRATIONS PENETRATION COMMENTS FIRE AREA DETECTION ZONE.

NUMBER FROM TO FROM TO 17-31 AF S

17 31 013 037 17-31 AJ S

17 31 013 037 18-19 AB S

18 19 014 015 18-19 AC C

18 19 014 015 18-19 AC NB 18 19 014 015 18-47 AA C

18 47 014 046 18-82 AA NB 18 82 014 082 18-82 AB NB 18 82 014 082 19-20 AB S

19 20 015 016 19-20 AC S

19 20 015 016 19-20 AC NB 19 20 015 016 19-20 AD S

19 20 015 016 19-32 AC NB 19 32 015 038 19-32 AD NB 19 32 015 038 19-46 AA C

19 RB2 015 046 19-81 AA NB 19 81 015 081 19-81 AB S

19 81 015 OH1 20-29 AA NB 20 29 016 020 20-29 AC C

RM1 20 016 020 20-29 AF C

RM1 20 016 020 20-32 AA C

20 32 016 038 20-32 AB BD 20 32 016 038 20-32 AC BD 20 32 016 038 20-32 AD NB 20 32 016 038 27-29 AB S

RM1 27 020 l

27-29 AC C,

NB RM1 27 020 020 20-29 AA S

28 RM1 020 29-71 AA C

RM1 71 010 019 29-71/2 AA C

RM1 71 010 019 30-31 AA C

30 31 036 037 30-31 AC BD 30 31 036 037 30-31 AE BD 30 31 036 037 30-71/1 AF DD 30 71 036 034 30-71/1 AG C

JO 71 034 036 31-32 AA DD 31 32 036 037 31-32 AC PER ECN 31 32 036 037 31-32 AC NB 31 32 038 037 31-36 AA C

31 36 037 042 31-36 AE ND 31 36 037 042 32-33 AA S

32 33 038 039 32-36 AA C

32 36 038 042 32-36 AD ND 32 3G 038 042 32-36 AG NB 32 36 038 042 32-36 AH NB 32 36 036 042 33-36 AB S

33 36 039 042 33-36 AD ND 33 36 039 042

Pogo No.

3 C2/25/86 ATTACHMENT TO NRC SPECIAL REPORT ELECTRICAL PENETRATIONS PENETRATION COMMENTS FIRE AREA DETECTION ZONE NUMBER FROM TO FPCM TO 34-36 AB NB 36 RG1 038 042 34-36 AF NB 36 RG1 042 34-36 AJ NB RG1 36 042 34-64 AB NB RG1 36 042 34-OUTSIDE AA C

RG1 69 042 36-64 AA NB 36 64 042 36-71/1 AA S

36 71 042 034 36-71/1 AB NB 36 71/1 034 042 39-50 AA NB RB1 RG1 043 047 39-50 AA C

RG1 RB1 043 047 47-56 AA C

47 56 048 49-57 AA NB RB1 57 047 048 49-50 AA NB RB1 57 047 048 74-36 AF S

RG1 36 043 744495 NB 71 RM1 010 019 i

746073 NB 73 69 75/1-81 AA S

75/1 81 075 081 75/1-81 AB 5

75/1 81 075 081 l

76/1-82 AA S

76/1 82 076 082 76/1-82 AB S

76/1 82 076 082 77/2-81 AA NB 77/2 81 077 081 77/2-81 AB NB 77/2 81 077 081 78/2-82 AA NB 78/2 82 078 082 78/2-82 AB NB 78/2 83 078 082 I

85/1-85/2 AA S

85/1 85/2 085 85/1-85/3 AA S

95/1 85/3 085 85/1-85/4 AA S

85/1 85/4 085 85/1-85/4 AB S

85/1 85/4 085 85/1-87 AA 5

85/1 87 085 087 85/1-87 AB S

85/1 87 085 087 85/1-89 AA S

85/1 89 085 089 85/1-89 AB S

85/1 89 085 089 85/3-88 AA G

8b/3 88 085 088 85/3-88 AB S

85/3 88 005 088 FB 69-1 NB 69 69 j '

NOID 86-161 NB 20 Rmi 016 020 j

OUTSIDs-34 AA ND RG1 OUTSIDE 042 OUTSIDE-34 AA NB OUTSIDE RG1 042 A41005 NB 17 20 013 016 XO3267 NB OUTSIDE 18 014 X40111 NB 32 36 038 042

^

X41105 NB 02 PO 016 104 X41105 NB 19 20 015 OtG X42250 NB 02 85/4 OA5 104 1

1

.-.-c

Pego No.

4 02/25/86 ATTACHMENT TO NRC SPECIAL REPORT ELECTRICAL PENETRATIONS PENETRATION COMMENTS FIRE AREA DETECTION ZONE NUMBER FROM TO FROM TO X42286 NB 02 20 104 016 X81499 NB 91/1 91/2 091 091 X81500 NB 83/2 91/1 083 091 X81500 NB 83/1 83/2 083 X81506 NB 83/2 91/1 083 091 X81509 NB 91/1 91/2 091 X81514 NB 84/1 84/2 084 X81514 NB 85/1 87 085 087 r

Page No.

1 02/25/86 ATTACHMENT TO NRC SPECIAL REPORT MECHANICAL PENETRATIONS

[

a i

PENETRATION COMMENTS FIRE AHEA DETECTION ZONE NUMBER FROM TO FROM TO 2083 S

RM1 71 010 019 214 S

83/2 84/1 003 084 3082 S

30 36 036 042 1

3089 S

30 36 036 042 3090 S

33 36 039 042 3091 S

33 36 039 042 3130 S

32 36 038 042 4478 9

RB1 48 047 4500 S

RB1 RB2 047 4527 S

47 RB2 046 4546 9

57 RB1 047 048 EXP. JOINT 27 28 020 JNT SEAL RM-209 6 RT1 28 007 020 f~

NOID 85-111 S

01 17 004 013 NOID 85-68 6

RG3 RM1 019 NOID 86-128 9

19 32 015 038

)

N0!D 86-129 9

19 32 015 038 NOID 86-130 9

32 33 038 039 NOID 86-131 S

32 33 038 039

)

NOID 86-162 S

RM1 RG1 042 020 i

NOID 86-163 NB 02 20 104 016 i

NOID 86-164 NB 21 33 017 039 i

NOID 86-207 9

27 RG1 020 042 j

NOID 86-38 8

27 28 020 i

NOID 86-85 9

83/1 83/2 083 NOID 86-96 9

48 57 047 048 1

I

i Page No.

1 82/25/86 ATTACHMENT TO NRC SPECIAL REPORT FIRE DOORS PENETRATION FIRE AREA DETECTION ZONE NUMBER FROM TO FROM TO ACCESS HATCH RM1 38 019 AU-182 RG1 36 843 AU-109 RG1 72 042 AU-129 RO3 69 942 AU-132 38 71 934 041 AU-136 47 69 942 AU-137 RB2 RG1 043 046 AU-139 RG1 36 042 AU-215 RM1 17 013 919 AU-218 RM1 71 919 010 AU-221 RM1 71 010 919 AU-225 RM1 27 020 AU-319 RT1 72 007 AU-338 et 71 002 003 AUR-481 74 RT1 006 AUX ROOF NS-158 75/1 83/1 075 083 NS-240 78/2 84/1 978 078

I page No.

1 02/25/86 ATTACHMENT TO NRC SPECIAL REPORT FIRE DAMPERS l

PENETRATION FIRE AREA DETECTION ZONE NUMBER FROM TO FROM TO l

FD-901 91 02 994 194 FD-902 91 02 904 104 FD-903 91 02 904 194 FD-904 91 92 904 104 FD-905 91 02 994 194 FD-906 91 92 904 104 FD-907 91 02 904 104 FD-908 91 92 904 104 MISSING DAMPER 1 02 74 194 AJX ROOF MISSING DAMPER 2 92 74 104 AUX ROOF l

I 1

l l

1 l

l l

l l

l l

L

Page No.

1 92/25/86 ATTACHMENT TO NRC SPECIAL REPORT SEALED PENETRATIONS OPEN GREATER THAN 7 DAYS REPORTED PER TECHNICAL SPECIFICATION 3.14.6.2 i

s PENETRATION LOG COMMENTS OPEN

CLOSE, DATK_

NUMBER NUMBER DATE 31-36 AC 85-00018 11/14/85 02/13/86 3131 NB

//

02/12/86 3131 85-00081, 12/26/85 02/12/86 34-64 AB 85-00010 11/14/85 02/07/86 36-64 AA 85-90611 11/14/85 C2/13/86 781699 85-00014 11/14/85 02/13/86 781699 85-60015 11/14/85 02/13/86 85/1-85/2 AA 85-00016 11/14/85 02/13/86 85/1-85/2 AA 85-00057 12/18/85 02/12/86 85/1-85/3 AA 85-09017 11/14/85 02/13/86 85/1-85/4 AB 85-99958 12/18/85 02/12/86 85/2-89 AA 85-00959 12/18/85 02/12/86 85/2-89 AB 85-90012 11/14/85 02/13/86 85/3-87 AA 85-20013 11/14/85 02/13/86 AU-102 86-00231 02/11/86 02/13/86 AU-201

/

/

O2/11/86 AU-381 86-00234 02/11/86 02/13/06-AU-334

/

/

02/11/86 FB69-1 85-40008 11/14/85 91/22/86 FB69-2 85-00007 11/14/85 02/12/06 FD-818

/

/

02/12/86 FD-925

/

/

02/12/86 FD-826A

/

/

02/12/86 FD-027A

/

/

O2/12/86 FD-928

/

/

82/12/86 FD-828A

/

/

02/12/86 FD-042

/

/

02/12/86-FD-847

/

/

O2/12/86 FD-948

/

/

02/12/86 FD-101

/

/

02/12/86 FD-102

/

/

Od/12/86 NS-963 85-00036 01/15/86 02/12/86 NS-153 85-90937 01/15/86 02/12/86 NS-154 85-00039 81/15/86 02/12/86 NS-155 85-00038 01/15/86 02/12/86 NS-156 85-80048 Of/15/86 02/12/86 NS-157 85-99941 01/15/86 02/12/86 NS-159 86-99983 01/16/86 02/13/86 NS-160 85-00042 01/15/86 02/12/86

,+

Page No.

2 02/25/86 ATTACHMENT TO NRC SPECIAL REPORT SEALED PENETRATIONS OPEN GREATER THAN 7 DAYS REPORTED PER TECHNICAL SPECIFICATION 3.14.6.2 i

PENETRATION LOG COMMENTS OPEN CLOSE i

~ NUMBER NUMBER DATE DATE.

.NS-161 85-00043 01/15/86 02/12/86 NS-232 85-00044 01/15/86 02/12/86 NS-233 85-00045 01/15/86 02/12/86 NS-234 86-00082 01/21/86 02/12/86 NS-235 86-00081 02/03/86 02/12/86 NS-238 86-00080 02/03/86 02/13/86 NS-242 85-00046 01/15/86 02/12/86 NS-355 85-00050 01/15/86 02/12/86 NS-356 85-00049 01/15/86 02/12/86 NS-358 85-00048 01/15/86 02/12/86 NS-359 85-00047 01/15/06 02/12/86 OUTSIDE-34 AA 85-00006 11/14/85 01/22/86 X40111 85-00009 NB 11/14/85 02/13/86 E

f I

.,-w