MONTHYEARML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20128G1661996-10-0303 October 1996 Summarizes 960924 Meeting W/Gpu Nuclear Corp in Rockville,Md Re Preliminary Responses to Staff RAI Concerning Request to Change EALs for TMI-1.List of Participants & Copy of Preliminary Response to RAI Encl 1999-09-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20203E0321999-02-11011 February 1999 Staff Requirements Memo Re 990211 Affirmation Session in Rockville,Md (Open to Public Attendance) Re Secys 99-044 & 99-045 ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20248H7001998-05-20020 May 1998 Staff Requirements Memo Re SECY-98-071,exemption to 10CFR72.102(f)(1) Seismic Design Requirement for TMI-2 ISFSI ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months 1999-09-29
[Table view] |
Text
__
December 2, 1985 NRC/THI-85-096 MEMORANDUM FOR: Harold R. Denton, Director Office of Nuclear Reactor Regulation Frank J. Miraglia, Director-Division of PWR Licensing B FROM: William D. Travers, Director TMI-2 Cleanup Project Directorate
SUBJECT:
ilRC TMI-2 CLEANUP PROJECT DIRECTORATE WEEKLY STATUS REPORT FOR NOVB4BER 25, 1935 - DECEMBER 1, 1985
- 1. DEFUELING The changeout of hydraulic fluid in the defueling tools hydraulic system was completed on November 25. The new type of borated hydraulic fluid should alleviate the boron precipitation problem experienced during the previous week. Defueling operations resumed on November 25 and 26th.
The licensee had continued success in cutting substantial quantities of broken and tangled fuel rods with a hydraulic shear tool. The cutting is going to continue next week prior to loading the debris into defueling canisters.
On November 25, the licensee detemined that respirators for this phase of defueling operations would no longer be necessary. This detemination was made after air sample analyses and radiation surveys of nearly one month of defueling entries. In general, airborne particulate composite concentration at the defueling work platfom has been less than one-tenth of the Maximum Pemissible Concentration. The removal of respirator requirements is expected to increase work efficiency and should result in overall occupational exposure reduction.
- 2. PLANT STATUS
- The facility remains in long tem cold shutdown with the Reactor Coolant System (RCS) vented to the reactor building atmosphere and the reactor vessel head and plenum assembly removed from the reactor vessel. a
- The plenum is on its storage stand in the deep end of the fuel transfer canal. A dam has been installed between the deep and shallow ends of the fuel transfer canal. The deep end is filled with water to a depth of about 20 feet (about 5 feet above the top of the plenum).
J)b
/
The modified internals indexing fixture is installed on the
" " " l
0512110098 eS1202 0 . .. . . . . . . . . , , ,
i PDR ADOCK 0S00
_._ n
.....9 u5c ronu ne no-so1Nacu ono OFFICIAL RECORD COPY
' Harold R. Denton 2 December 2,1985 Frank J. iiiraglia flRC/TMI-85-096 vessel flange and is flooded to elevation 327 feet 6 inches (151 feet above the top of the core region). The defueling platform is installed over the Internal Indexing Fixture for defueling.
Calculated reactor decay heat is less than 12 kilowatts.
RCS cooling is by natural heat loss to the reactor building ambient atmosphere. Incore thernocouple readings range from 73 F to 95*F with an average of 83*F.
The average reactor building temperature is 57.5*F. The reactor building airborne activity at the Westinghouse platform is 2.7 E-8 uCi/cc Tritium and 1.2 E-10 uCi/cc particulate, predominantly Cesium 137.
- Spent Fuel Pool "A" is flooded to a depth of 20 feet. About 6 feet of water is over fuel canister storage racks.
- 3. WASTE !!ANAGE!!ENT After approval of the procedure, the filters on the Defueling Water Cleanup System (DUCS) were backwashed. Both trains of the reactor vessel filtration portions of DUCS will be started to determine the success of the backwash in reducing the filter differential pressure.
Submerged Demineralizer System (SDS) processing of batch 126 was completed, Fuel Transfer Canal recycle through both Trains and "B" cation sand filter. A total of 406,435 gallons was processed in batch 126.
The Spent Fuel Pool (SFP) and Fuel Transfer Canal experienced an algae bloom af ter the filling of the Spent Fuel Pool. A swimming pool filter has been used to reduce turbidity. Studies have indicated that the bloom was due to cuglena present in the Spent Fuel Pool before filling. A kill of the euglena is planned by addition of hydrogen peroxide to SFP to a concentration of 300 ppm.
EPICOR II is temporarily shutdown while changing out liners.
Total volume processed through SDS to date is 3.598,397 gallons, and the total volume processed through EPICOR II is 2,700,737 gallons.
- 4. DOSE REDUCTION / DECONTAMINATION ACTIVITIES Decontamination activities are continuing on the 281' level of the auxiliary building. Scabbling of reactor coolant bleed tank cubicles is in progress.
Average general area radiation dose rate is 40 mrem per hour on the 347' level of the reactor building and is 67 mrom per hour on the 305' level of the reactor building.
Decontamination of the pressurizer and "A" D-ring is in progress.
- 5. ENVIRON'1 ENTAL liONITORING US Environmental Protection Agency (EPA) sample analysis results show Till site 11guld effluents to be in accordance with regulatory limits, NRC requirements, and the City of Lancaster Agreement.
"'C'> ............ ............. ............. ............. ............. ............. .............
neu o2' nne ronu aisposo OFFICIAL RECORD COPY
~
Harold R. Dent:n 3 December 2, 1935 Frank J. Miraglia llRC/TMI-85-096 THI water samples taken by EPA at the plant discharge to the river consisted of seven daily composite samples taken from flovember 9 through November 16, 1985. A gama scan detected no reactor related activity.
- The Lancaster water sample taken at the water works intake and analyzed by EPA consisted of a seven day composited sample taken from November 10 through November 15, 1985. A gamma scan detected no reactor related radioactivity.
The NRC outdoor airborne particulate sampler at the THI Site collected a sample between November 20 and November 27, 1985. Ito reactor related radioactivity was detected. Analysis showed Iodine-131 and Cesium-137 concentrations to be less than the louar limits of detectability.
- 6. REACTOR BUILDING ACTIVITIES Concrete Core samples were obtained from interior basement walls at two feet and eight feet from the basement floor (281 foot elevation) by a Robot-like vehicle. These samples will be used to characterize the contamination of basement walls. The infomation will be used to plan decontamination activities of the basement walls.
The initial phase of defueling the reactor core is in progress.
Installation of the vacuum defueling system is in progress.
- 7. AUXILIARY AND FUEL HANDLING BUILDIllG ACTIVITIES Installation of the balance DWCS continued.
Spent Fuel Pool has been flooded to a depth of about 20 feet (about 6 feet above the top of the fuel canister storage racks).
- 8. flRC EVALUATIONS Ill PROGRESS Technical Specification Change Request number 49.
- Recovery Operations Plan Change number 31.
SDS Technical Evaluation and System Description Update.
Core Stratification Sample Safety Evaluation.
Defueling Water Cleanup System Technical ivaluation Report, Revision 7.
Containment Air Control Envelope Technical Evaluation Report, Revision 5.
Solid Waste Facility Technical Evaluation Report.
- 9. PUBLIC ftEETIllG The next meeting of the Advisory Panel is scheduled for December 12, 1985, at the Holiday Inn, 23 South Second Street, Harrisburg, PA, from 7:00 Pit to 10:00 P!1.
At that meeting GPUN will provide a status of defueling activities and Mr. and 11rs. Aamodt will provide information regarding their health effects evaluations.
- '"C'> ........... ............. ............. .............. ............. ............. .............
c:nc ronu m oo sm uncu om OFFICIAL RECORD COPY
.- ~ Harold R. Denton 4 December 2, 1985 Frank J. Miraglia NRC/Tt11-85-096 Persons desiring the opportunity to speak before the Panel are asked to contact Mr. Thomas Smithgall at 717-291-1042 or write to him at 2122 harietta Avenue, Lancaster, Pennsylvania 17603.
ORIGINAL SIGNED BY:
yfilliom D. Travers William D. Travers Director THI-2 Cleanup Project Directorate
..T( D.... ...INICd... ,
... . .Im Pp r . .. ............. ............. .............
- > WyFT #. . . ..CCPW9D)... . Pd .. .,f@i r... ............. ............. .............
"^"> 17/../05.... 17/.Y/05.... .1E/3/0s... ..12/4/0s.... .............
NRW MM 318]10 am NMW O2"__ OFFICIAL RECORD COPY ______________ _ __ _ _ _ _ _
0 H:rold R. Denton 5 December 2,1985 Frank J. Miraglia NRC/THI-85-096 INTERNAL DISTRIBilTION EDO OGC Office Directors Commissioner's Technical Aisistants NRR Division Directors NRR A/D's Regional Administrators IE Division Directors TAS EIS THI Program Office Staff (10)
PHS EPA DOE RI Division Directors Public Affairs, RI State Liaison, RI TilIP0 HQ r/f Tl!! SITE r/f CENTRAL FILE 11RC POR LOCAL POR THI-2 Project Section File
'"c'> ............ ............. ............. .............. ............. ............. .............
sunv * > ,,,,,,,,,,,, ,,,,,,,,,,,,, ,,,,,,,,,,,,, ,,,,,,,,,,,,,, ,,,,,,,,,,,,, ,,,,,,,,,,,,, ,,,,,,,,,,,,,
^"> ............ ............. ............. .............. ............. ............. . ..........
5:nc ronu ais oonoi nac" " OFFICIAL RECORD COPY