ML20137Y613

From kanterella
Jump to navigation Jump to search
Forwards AEOD/T515, RHR Svc Water Booster Pump Air Binding at Brunswick Unit 1, Technical Review Rept.No Further Evaluation Necessary
ML20137Y613
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/05/1985
From: Salah S
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Seyfrit K
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Shared Package
ML20137Y618 List:
References
AEOD-T515, NUDOCS 8603120339
Download: ML20137Y613 (1)


Text

-_. - __ _ - --- --- _ --- -

MEMORANDUM FOR: Karl V. Seyfrit. Chief AE00/T515 Reactor Operations Analysis Branch Office for Analysis and Evaluation of Operational Data THRU: Stuart D. Rubin, Section Chief ,

Reactor Systems Section 1 /0 Reactor Operations Analysis Branch 7 Office for Analysis and Evaluation of Operational Data FROM: Sagid Salah, Reactor Systems Engineer Reactor Systems Section 2 Reactor Operations Analysis Branch Office for Analysis and Evaluation of Operational Data

SUBJECT:

RESIDUAL HEAT REMOVAL SERVICE WATER B0OSTER PUMP AIR BINDING AT BRUNSWICK UNIT 1 Forwarded herewith is the subject Technical Review report for your information.

As a result of this investigation, no further evaluation of this problem is considered necessary. Therefore, this technical review is complete.

5 Sagid Salah, Reactor Systems Engineer Reactor Systems Section 2 Reactor Operations Analysis Branch Office for Analysis and Evaluation of Operational Data

Enclosure:

As Stated D}STRIBUTION:

vfDR AE0D CF ROAB SF ROAB CF SSalah DZukor KSeyfrit Tippolito CHeltemes, Jr.

WLanning KBlack FHebdon OFC  : ROAB  : SL:ROA OD  :  :  :

'): BC:ROAB 9 .:..

._:__...._,g  : DD:

NAME : SSal h s  : SRubin N KVSeyfrit : Tippol to  :  :  :

lDATE : 11/4 7/85  : 11/ @ 85  : 11/eg/85  : 1]l/g/85  :  :

OFFICIAL RECORD COPY B603120339 PDR ADOCM O 35 g 3

, PDR S