ML20137Y406

From kanterella
Jump to navigation Jump to search
Special Rept (2-SR-86-005):on 860125,Tech Spec Action Statement for Operability of Vent high-range Radiation Monitor RU-144 Exceeded.Caused by Energizing Reactor Coolant Pump W/Grounding Straps Still Attached.Procedure Revised
ML20137Y406
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/24/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
(2-SR-86-005), (2-SR-86-5), ANPP-35285-EEVB, NUDOCS 8603120265
Download: ML20137Y406 (2)


Text

3 Arizona Nuclear Power Project P O. box $2034 e PHOENIX. ARIZONA 85072 2034 February 24, 1986 ANPP-35285-EEVB/KLM/98.05 Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region V 5

3 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5638 3

4

Subject:

Palo Verde Nuclear Generating Station (PVNGS) g p Q t,,

82 2 '

Unit 2 9

-4 Docket No. STN 50-529 (License NPF-46) 2 E

Special Report - Radiation Monitoring Unit

~

m#

Not Restored Within 72 Hours File: 86-020-404 G.1.01.10 l> ear Mr. hartin:

Attached please find a Special Report (2-SR-86-005) prepared and submitted pursuant to Technical Specification 3.3.3.9 and 6.9.2.

This report discusses inoperability of a Plant Vent High Range Radiation Monitor.

11 you have any questions, please contact me.

Very truly yours, c-CQt n LLL i m E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/KLH/dlm Attachment cc:

R. P. Zimmerman (all w/a)

A. L. Hon E. A. Licitra A. C. Gehr INPO Records Ccenter 9603120265 960224 ADOCK 0 % 5 9 DR DR C

24,

  • AtilcbmsnttoANPP-35285 PALO VERDE NUCLEAR GENERATING STATION UNIT 2 Special Report No. 2-SR-86-005 RADIATION MONITORING UNIT NOT RESMRED WITHIN 72 HOURS Docket No. STN-50-529 License No. NPF-46 At 0645 on January 25, 1986, the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Technical Specification ACTION Statement for operability of the Plant Vent High Range Radiation Monitor (RU-144) was exceeded.

We monitor was declared inoperable on January 22, 1986, as a result of the Plant Vent Low Range Radiation Monitor (RU-143) bring declared inoperable due to a failure of the counting functions.

We cause of the counting functions inoperability was the result of energizing a reactor coolant pump with the grounding straps still attached.

We resultant surge on the ground system caused a

detector and amplifier /descriminator board failure in RU-143.

We corrective action taken was the repair and calibration of RU-143, he monitoring unit was returned to service on February 10, 1986.

In addition, procedural changes are being made to prevent energizing a reactor coolant pump with the grounding straps attached.

A special report is required and made pursuant to Palo Verde Unit 2 Technical Specification Table 3.3-13 ACTION 42-b and Technical Specification 6.9.2.

i l

l l

l l

i l

- - _ _ _ _ _