Interim Deficiency Rept DER 85-41 Re Burned Wire Insulation. Due to Extensive Investigation & Evaluation,Final Rept Delayed Until 860303
ML20137X928
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/19/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-35228-EEVB, DER-85-41, NUDOCS 8603120042
Download: ML20137X928 (3)


Text

._.

RECEIVED

.Tc Arizona Nuclear Power Project

' ge, h bf P O Box 52034

  • PHOENIX, ARl20NA 85072-2034 I

ANPP-35228/EEVB /LAS /DRL-92. I1 February 19, 1986 EGmlg y gp I

U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Cencrating Station (pVNGS)

Units 2, 3 Docket Nos. 50/529, 530

Subject:

Time Extension for Report - DER 85-41 A 50.55(e) Potentially Reportable Deficiency Relating to Burned Wire Insulation File: 86-006-216; 86-056-026; D.4.33.2 References (A) ANPP-34498, Dated January 9, 1986 (DER 85-41 Interim Report)

(B) ANPP-34665. Dated January 16, 1986 (DJR PS-41 Time Extension)

Dear Sir:

An Interim Report was transmitted to the NRC by Reference (A) and a Time Extension by Reference (B). At that time, it was estimated that a Final Report would be available by February 19, 1986.

Due to the extensive investigation and evaluation required, it is noy expected that this information will be finalized by March 3, 1986, at shich time a complete report will be submitted.

There is no new information or change to the Interina Report at this time, l

Very truly ur,

g ch.

rsLLA PN i

E. E. Van Bemit, Jr, Executive Vice President Project Director EEVB/DRL/1df Attachment (s) cc: See Page Two 0

- -.EE-A ?.

e ANPP-35228-EEVB/LAS/DRL-92.11 February 19, 1986 Mr. D. F. Kirsch DER 85-41 Page Two i

cc:

Richard DeYoung. Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr (4141)

R. P. Zimmerman (6241)

Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339

l o

a ANPP-35228-EEVB/LAS/DRL-92.11 February 19, 1986' Mr. D. F. Kirsch-DER 85-41 Page Three bec:

J. G. Haynes (h060)

W. E. Ide (4074)

D. B. Fasnacht (6330)

A. C. Rogers (4056)

L. A. Souza (6085)

T. D. Shriver (6195)

'g D. E. Fowler (6260)

C. N. Russo (6330)

, s.

J. R. Bynum (6125)

J. M. Allen (6130)

D. Canady (6345)

G. A. Hierzer.

(6330)

W. G. Bingham'l (6330)

R. W. Welcher (Bechtel/Norwalk) 1 H. D. Foster (6330)

D. R. Hawkinson (6330)

M. L. Clyde (6079)

B. T. Parker (6345)

J. Provasoli (4057)

D. N. Stover (4082)

J. D. Houchen (6330)

J. E. Kirby (6501)

I s

+

6 L

t