ML20137X683

From kanterella
Jump to navigation Jump to search
Informs That Region IV Will Host Operator Licensing Exam Development Workshop in Arlington,Tx on 970529-30
ML20137X683
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/16/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
GL-95-06, GL-95-6, NUDOCS 9704220132
Download: ML20137X683 (6)


Text

. - - .

UNITED ST ATES

  • . * ,p""8 Gut,k NUCLEAR REGULATORY COMMISSION y3 ..

3 REolONiv 3 f*

[ 611 RYAN PLAZA DRIVE, SUITE 400 l 9....8 ARLINGTON. TEXAS 760118064 APR I 61997 l

C. Randy Hutchinson, Vice President Operations Arkansas Nuclear One '

Entergy Operations, Inc.

.1 4 4 8 S .R . 3 3 3 Russellville, Arkansas 72801-0967

SUBJECT:

OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP

Dear Mr. Hutchinson:

In recent weeks, after an internal audit, Region IV has recognized the need for enhanced expectations for the quality of initial licensing examinations developed under the pilot process of Generic Letter 95-06 or the " Operator Licensing Examination Standards for Power Reactors," Interim Revision 8. These new expectations represent a significant increase in NRC expectations regarding initiallicensing examination quality than has been previously communicated by the Region to facility licensees. In several recent meetings with Region IV facility licensee representatives from operations and training organizations, regional management has presented these clarified expecutior.s with rogard to facility licensee-developed initiallicensing examinations.

Additionally, chief examiners have been communicating these expectations at the staff level to individual facility licensee personnel for facility licensees that have initial examinations scheduled to be administered over the next few months. The thrust of these expectations is that facility licensees will be held to a higher level of quality at the individual test item level than has been previously required. In response to these communications, facility licensee representatives have requested that the NRC provide a forum in which facility licensee personnel involved in examination development can better understand how these expectations translate into actual test items.

On May 29 and 30,1997, Region IV will host a workshop in its Arlington, Texas, office on test item and examination development to meet agency expectations of facility licensee-developed initial licensing examinations. The workshop will start at 8:30 a.m. on May 29 and conclude by 1 p.m. on May 30. A tentative workshop agenda is attached. Comments ,

are welcome. Th wgr shop will be open to the public.

wo

. ., . s

\

9704220132 970416 PDR ADOCK 05000313 V PDR INhh'h l

v i:

Entergy Operations,: Inc. l i

i You are invited and encouraged to send representatives from your organizat. ion who are ~  ;

~

'likely to be directly involved in initial licensing examination development._ Our facility can )

accommodate a large number of attendees. However, if you expect to send more than

,four attendees, please inform us so that we may ensure the room arrangement is appropriate.

Please direct comments or questions to John Pellet, Chief, Operations Branch, Division of Reactor Safety at (8171860-8159 or Stephen McCrory, Workshop Coordinator, Operations Branch at (817)860-8265, or via electronic mail to jlp@nrc. gov and sim@nrc. gov,

. respectively.

Sincerely, -l k

Arthur T. Howell 111, Director 1 Division of Reactor Safety i Docket Nos.: 50 313;50-368 ,

License Nos.: DPR-51; NPF-6  ;

Enclosure:

Tentative Workshop Agenda {

\

cc w/ Enclosure .

Executive Vice President

& Chief Operating Officer '

Entergy Operations, Inc.

P.O. Box 31995  ;

)

Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

. P.O. Box 31995 Jackson, Mississippi 39286 Manager, Wash:ngton Nuclear Operations .,

- ABB Combustion Engineering Nuclear

' Power 12300 Twinbrook Parkway, Suite 330:  :

Rockville, Maryland 20852 County Judge of Pope County.

Pope County Courthouse ,

Russellville, Arkansas 72801 l

d a

Entergy Operations, Inc. ,

Winston & Strawn

' 1400 L Street, N.W.

Washington, D.C. 20005-3502 Bernard Bevill, Acting Director.

Division of Radiation Control and Emergency Management

. Arkansas Department of Health 14815 West Markham Street, Slot 30 Little Rock,' Arkansas 72205-3867 Manager - ,

Rockville Nuclear Licensing Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 i

Sherry Cotton,-Training Manager Entergy Operations, Inc.

l Arkansas Nuclear One.

1448 S. R 333 Russellville, AR 72801 t

I r

s

. .. - ~ - . - . . . . . . - . . .. - . . , . . . .. . . - . - . . . - . ~ . - . . . .

n.7

-- o;'

< Entergy Operations, Inc. - ,

i

' bec to DCD (IE42)_.

bec dis't rib. by RIV:

Regional Administrator. Resident' Inspector

' DRP Director : MIS System -

. Branch ~ Chief (DRP/C) . RIV File .; '

Project Engineer-(DRP/C) DRS-PSB

Branch Chief (DRP\TSS)'

- S. Richards (MS.10D22) - <.

1 1

^

y ,

I I

I i

I i

l l

l

'l

'i 1

j

' DOCUMENT NAME: ob\ workshop \ano-r1. lmb ~

. To receive sepy of desument, inecate la box:"C" - Copy without enclosure: "E" Copy witti encicsures T - No copy RIV:RE:OB E C:OB . _E - D:D R S f,ig SLMcCrory/imb"- JLPellet M ATHowef']gl 04/ /97 04/fl/97 T ' 04/ 97 7 04/ /97 04/. /97 - ]

' previously concurreci . OFFICIAL F.ECORD COPY. j

~ . -

~ _ . . . ._

[

j.  ;

r: t j

Entergy Operations,' inc; .

I r

bcpito'DCD (IE42) ..

. !w .utrib, by RIV:-  ;

Regional Administrator. Resident inspector l DRP Director . . MIS System Branch Chief (DRP/C) .RIV File Project Engineer (DRP/C)- DRS-PSB - -!

Branch Chief (DRP\TSS) .i S.-R;0 hards (MS 10D22)  :

9 i

p ,

[

l i

1-4 0

~.
- j

't i

i 1

L 0

DOCUMENT NAME: o'b\workshup\ano-r1.imb It f0000WG 8891 SI 80CWRGAT. IndiC4W IA be ; T

  • C0p1 without enclosurts T . Copy with enclosures *N" = No copy RIV:RE:OB: E C:OB . _E D:DRS f,34 SLMcCrory/imb' JLPellet g ATHowe{p 04/ /97 04/(/977' 04/ t /p7 7 04/ /97 04/ /97 i

' previously concurrecl . OFFIClAL F.ECORD COPY

.}'

w -, , ,

Y-ENCLOSURE OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP AGENDA DAY 1 - MAY 29,1997 Introduction (8:30-9 a.m.)

Session 1 (9-10 a.m.) Generic Attributes of Good Test items Session 2 (10:15-11:30 a.m.) Written Examination Questions Session 3 (12:30-2 p.m.) Open Reference Oral Questions (Job Performance Measure and Administrative)

Session 4 (2-3 p.m.) Administrative Job Performance Measures Session 5 (3:15-4:30) System Job Performance Measures and Job Performance Measure Sets Session 6 (4:30-5 p.m.) Questions and Answers DAY 2 - MAY 30,1997 Session 7 (8:30-9:30 a.m.) Scenarios and Scenario Sets Session 8 (9:30-10:15 a.m.) Breadth, Depth, Overlap, and Examination Outlines Session 9 (10:30-12 noon) Questions and Answers i i

Closing Remarks (12-12:30 p.m.) l l

l 1

l l

l