ML20137X485

From kanterella
Jump to navigation Jump to search
Informs That Region IV Will Host Workshop on 970529-30 in Arlington,Tx on Test Item & Exam Development to Meet Agency Expectations of Facility licensee-developed Initial Licensing Exams
ML20137X485
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/16/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
References
GL-95-06, GL-95-6, NUDOCS 9704220052
Download: ML20137X485 (6)


Text

'l h" %%

UNITEo SVATES t!

t NUCLEAR REGULATORY COMMISSION REGloN IV

  • 4 :._

'g 3b d

611 RYAN PLAZA DRIVE. SUITE 400 k..*# 8 AR LING ton, T E X AS 76011-8064 I

APR I 61997 Harold B. Ray, Executive Vice President Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128

SUBJECT:

OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP

Dear Mr. Ray:

1 in recent weeks, after an internal audit, Region IV has recognized the need for enhanced expectations for the quality of initial licensing examinations developed under the pilot process of Generic Letter 95-06 or the " Operator Licensing Examination Standards for i

Power Reactors," Interim Revision 8. These new expectations represent a significant increase in NRC expectations regarding initiallicensing examination quality than has been i

previously communicated by the Region to facility !icensees. In several recent meetings with Region IV facility licensee representatives from operations and training organizations, regional management has presented these clarified expectations with regard to facility i

licensee-developed initial licensing examinations.

Additionally, chief examiners have been communicating these expectations at the staff level to individual facility licensee personnel for facility licensees that have initial examinations scheduled to be administered over the next few months. The thrust of these expectations is that facility licensees will be held to a higher level of quality at the individual test item level than has been previously required. In response to these communications, facility licensee representatives have requested that the NRC provide a forum in which f acility licensee personnel involved in examination development can better understand how these expectations translate into actual test items.

On May 29 and 30,1997, Region IV will host a workshop in its Arlington, Texas, office on test item and examination development to meet agency expectations of facility licensee-developed initial licensing examinations. The workshop will start at 8:30 a.m. on May 29 and conclude by 1 p.m. on May 30. A tentative workshop agenda is attached. Comments are welcome. This workshop will be open to the public.

q~ 0 0 9 i

)l i

9704220052 970416 gjNj gg[]

PDR ADOCK 05000361 V

PDR

Southern California Edison Company You are invited and encouraged to send representatives from your organization Who are likely to be directly involved in initial licensing examination development. Our facility can accommodate a large number of attendees. However, if you expect to send more than four attendees, please inform us so that we may ensure the room arrangement is appropriate.

Please direct comments or questions to John Pellet, Chief, Operations Branch, Division of Reactor Safety at (817)860-8159 or Stephen McCrory, Workshop Coordinator, Operations Branch at (817)860-8265, or via electronic mail to j!p@nrc. gov and sim@nrc. gov, respectively.

Sincerely, AA 0 W

p Arthur T. Howell Ill, Director 1

Division of Reactor Safety Docket Nos.: 50-361; 50-362 L! cense Nos.: NPF-10; NPF-15

Enclosure:

Tentative Workshop Agenda cc w/

Enclosure:

Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Alan R. Watts, Esq.

Woodruff, Spradlin & Senart 701 S. Parker St. Suite 7000 Orange, California 92868-4720 Sherwin Harris, Resource Project Manager Public Utilities Department City of Riverside 3900 Main Street Riverside, California 92522 R. W. Krieger, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128

e I

Southern California Edison Company i Dr. Harvey Collins, Chief I

Division of Drinking Water and

' Environmental Management.

. California Department of Health Services P.O. Box 942732 Sacramento, California 94234-7320-t Terry Winter, Manager

, Power Operations.

l San Diego Gas & Electric Company j

' P.O. Box 1831

. San Diego, California 92112

. Mr. Steve Hsu Radiological Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 i

Mayor City of San Clemente 100 Avenida Presidio l

San Clemente, California 92672 I

i Mr. Truman Burns \\Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 1

...j i

i l

4

6,,

1 e

g y

n Southern California Edison Company - !

. bec to DCD (IE42) -

' bec distrib. by RiV:

Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/F, WCFO)

MIS System Senior Project inspector (DRP/F, WCFO)

RIV File l

Branch Chief (DRP/TSS)

M. Hammond (PAO, WCFO)

WCFO File -

S. Richards (MS 10D22) 1 l

1 i

.I 1

i i

2 DOCUMENT. NAME: R:\\_SO23\\SOLT416. lmb To receive copy of document, Indicate in box: "C" = Copy weout enclosures "E" = Copy wth enclosures "N" = No copy i

"RIV:RE:OB C:OB :

D:DRS SLMcCrory/imb),j' JLPellet My ATHowell liiff 04/ t/97 7

04/lb/97

'p"

{

04&/97 fr.

/

OFFIC.AL RECORD COPY f

i h

k

G Southern California Edison Company bec to DCD (IE42) bec distrib. by RIV:

Regional Administrator.

Resident inspector -

DRP Director DRS-PSB Branch Chief (DRP/F, WCFO)

Mis System Senior Project inspector (DRP/F, WCFO).

RIV File Branch Chief (DRP/TSS)-

M. Hammond (PAO, WCFO)

WCFO File

- S. Richards (MS 10D22)

L P

1 i

DOCUMENT NAME: R:\\_SO23\\SOLT416.imb To recolve copy of document. Indicato in box: "C" = Copy without enclosures "E" = Copy wth enclosures "N" = No copy RIV:RE:OB 3 C.08 D:DRS SLMcCrory/imb${'

JLPellet dj' ATHowell liiff 3

04p/97

,[f 04//f/97 7

0446/97 3"

OFFIClAL RECORD COPY

)

?,

~-

7, e

ENCLOSURE OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP AGENDA DAY 1 - MAY 29,1997 introduction (8:30-9 a.m.)

Session 1 (910 a.m.)

Generic Attributes of Good Test items Session 2 (10:15-11:30 a.m.)

Written Examination Questions Session 3 (12:30 2 p.m.)

Open Reference Oral Questions (Job Performance Measure and Administrative)

Session 4 (2-3 p.m.)

Administrative Job Performance Measures Session 5 (3:15-4:30)

System Job Performance Measures and Job Performance Measure Sets Session 6 (4:30 5 p.m.)

Questions and Answers i

DAY 2 - MAY 30,1997 Session 7 (8:30-9:30 a.m.)

Scenarios and Scenario Sets Session 8 (9:3010:15 a.m.)

Breadth, Depth, Overlap, and Examination Outlines Session 9 (10:30-12 noon)

Questions and Answers Closing Romerks (12-12:30 p.m.)

l

.