ML20137W785
| ML20137W785 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 11/27/1985 |
| From: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Mazur D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| NUDOCS 8512100343 | |
| Download: ML20137W785 (2) | |
Text
'
DISTRIBUTION:
t-PDR
~
l LPDR LFMS Actual Manpower File RMDiggs CJHolloway Reg Docket File DWeiss LFMS Reactor File NOV 2 71985 LSolander, PRAB MKaltman, PRAB Docket No. 50-460 CHarwood, NRR MDuncan, NRR ensam, NRR Washington Public Power Supply Systen ATTH: Mr. D. W. Mazur Managing Director P.O. Box 968 3000 George Washington Way Richland, Washington 99352 Gentlemen:
As you are aware,10 CFR 170 of the Consnission's regulations for license and inspection fees was revised effective June 20. 1984. Section 170.12(b) of the revised. rule provides that for applications for pemits, licenses, facility reference design approvals, and special projects which have been on file with the Cosmission for review for six months or longer, billings would be made at six-month intervals or when the review is
. completed, whichever is earlier.
Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analysis for the WNP-1 OL application review for the period June 24, 1984 through December 22, 1984. The cost through that period is $4,639. The enclosure shows a breakdown of the review costs by program office. The Office of Resource Management has been notified to bill your company for this amount. When making payment, please make reference to the bill number.
Sincerely, priginal Signed tiy,7 g21 0343 851227 A
DOCK 05000460 William 0. Miller Director PDR License Fee Management Staff Office of Administration
Enclosure:
Cost Breakdown By Program Office
- * * *- 'LFMS
'LFMS:ADM
= = = = >
CJH ay:Jp WOMiller
- 11h85, 11 85
- Nac ronu ns umeoi nacu eno -
OFFICIAL RECORD COPY l
Washington Public Power Supply System Operating License Reviiw Costs from 6/24/84 through 12/22/84 FACILITY: WNP-1 DOCKET NO : 50-460 Costs Per Professional Program Office Professional Staff-hours Staff-hour Contractual Total Review Staff-hour Expended Costs Costs Costs 1.
NRR 562 48.0
$2,976
$1,610
$4,586 2.
'E-HQ 53 1.0 53 53 3
REGIONS 53 4.
ACRS 62 5.
NM55 58 Total Cost:
$4,639 p
-w,
-- -