ML20137W559

From kanterella
Jump to navigation Jump to search
Amend 81 to License DPR-72,permitting Triaxial Peak Accelograph on Top of Reactor Head to Be Inoperable During Modes 5 & 6
ML20137W559
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/18/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Florida Power Corp, City of Alachua, FL, City of Bushnell, FL, City of Gainesville, FL, City of Kissimmee, FL, City of Leesburg, FL, City of New Smyrna Beach, FL, Utilities Commission, City of New Smyrna Beach, FL, City of Ocala, FL, City of Orlando, FL, Orlando Utilities Commission, Sebring Utilities Commission, Seminole Electric Cooperative, City of Tallahassee, FL
Shared Package
ML20137W566 List:
References
DPR-72-A-081 NUDOCS 8510040339
Download: ML20137W559 (7)


Text

I pe nem A

UNITED STATES

[

g NUCLEAR REGULATORY COMMISSION n

a WASMNGTON, D. C. 20655 i

j#

FLORIDA POWER CORPORATION CITY OF ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEE 5 BURG CITY OF NEW SMYRNA BEACH AND UTILITIES ComISSION, CITY OF NEW SMYRNA BEACH ~ ~ ~ ~

CITY OF OCALA ORLANDO UTILITIES EUMIY5TNi IRD CITY OF ORLANDO

- - ~

SEBRING UTILITIE3 COMISSION SEMINOLE ELEc1MIC COOPERATIVE INC.

CITY OF TALLAHASSEE DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 81 License No. DPR-72

}

I 1.

The Nuclear Regulatory Comission (the Comission) has found that:

i A.

The application for amendment by Florida Power Corporation, et al.

l (the licensees) dated August 30, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission;

[

C.

There is reasonable assurence (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted l'

in compliance with the Comission's regulations; i

D.

The issuance of this amendment will not be inimical to the common l

defense and security or to the health and safety of the public; and 1

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 t

of the Comission's regulations and all applicable requirements have been satisfied.

8510040339 850910 l

DR ADOCK O 2

L

' 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-72 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 81, are hereby incorporated in the license.

Florida Power Corporation shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

F0P. THE NUCL R REGULATORY COMMISSION A

\\

/j0.w 4

John F tolz, Chief Operat ng Reactors Branch #4 Division of Licensing',

Attachment:

Changes to the Technical i

Specifications Date of Issuance: September 18, 1985 1

i f

f.

ATTACHMENT TO LICENSE AMENDMENT NO. 81 FACILITY OPERATING LICENSE NO. DPR-72 r

DOCKET NO. 50-302 i

Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change. The corresponding overleaf pages are also provided to maintain document completeness.

I Pages 3/4 3-28 3/4 3-29

)

l l

f I

1

\\

l l

b i

5 k

u

r i

4 i

}

INSTRUMENTATION

)

i SURVEILLANCE REQUIREMENTS i

l I

4.3.3.2 The incore detector system shall be demonstrated OPERABLE:

4 a.

By perfonnance of a CHANNEL CHECK within 7 days prior to its l

l use for measurement of the AXIAL POWER IMBALANCE or the QUADRANT POWER TILT.

+

1 I

b.

At least once per 18 months by performance of a CHANNEL CALIBRATION which does not include the neutron detectors.

1, 1

I I

j s

4 j

4

)

4 i

i i

i 4

4 I

}

CRYSTAL RIVER - UNIT 3 3/4 3-27 e

d..

__ _,. _. - _,....., _ -. _,.... _..,. _. _ _ _. _ _ _. _.. _ _.. _ _., _ _ _.. _.. _.,. _ _ _ _ _,,., _. ~,.. _... _.. _, _,. _., _.,

{

INSTRUMENTATION SIUSMIC INSTRUMENTATION LIMITING CONDITION FOR OPERATION I

3.3.3.3 The seismic monitoring instrumentation channels shown in Table 3.3-7 shall be OPERABLE.

APPLICABILITY:

As shown in Table 3.3-7.

ACTION:

With one or more seismic monitoring instruments inoperable for more than 30 2

a.

days, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 10 days outlining the cau'se of the 1

malfunction and the plans for restoring the inst'rument(s) to OPERABLE 4

status.

I The provisions of Specification 3.0.3 and 3.0.4 are not applicable.

b.

I SURVEILLANCE REQUIREMENTS Each of the above seismic monitoring instruments shall be demonstrated 4.3.3.3.1 OPERAtSLE oy the performance of the CI!ANNEL CHECY., CHANNEL CALIBRATION l

i and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 4.3-4.

)

4.3.3.3.2 Each of the above seismic monitoring instruments actuated during a seismic event shall be restored to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and a CHANNEL CALIBRATION performed within 5 days following the ssismic event. Data shall be retrieved from actuated instruments and analyzed to determine the magnitude of the vibratory ground motion.

A Special Report shall be prepared and submitted to the com.ntsuon pursuant to Specification 6.9.2 witntn 10 days describing the magnitece, frequency spectrum and resultant effect upon facility features important to safety.

I i

i l

CRYSTAL RIVER - UNIT 3 3/43-28 Amendre.ent No. 81 i

n

---r

TABLE 3.3-7 SEISMIC MONITORING INSTRUMENTATION MINIMUM MEASUREMENT INSTRUMENT APPLICABLE INSTRUMENTS AND SENSOR LOCATIONS RANGE OPERABLE MODES l.

Triaxial Time-History Accelographs a.

95'0" Containment vessel foundation 1.0 G 1

ALL b.

267'6" Outside containment on top of g 1.0 G 1

ALL ring girder c.

145'0" Control room floor g 1.0 G 1

ALL 2.

Triaxial Peak Accelographs a.

140'0" At top of reactor 10G 1

1, 2, 3, and 4 2

b.

175'6" Piping at top of one s.c.

2 0G 1

ALL 2

.,c.

166'8" Top of Borated Water Storage Tank

+ 2.0 G 1

ALL I

3.

Triaxial Seismic Switches t

i a.

95'0" Containment vessel foundation

.005 to.05 G l'

ALL I

l NOTE: Starts all three magnetic time history accelographs whenever the acceleration exceeds.01 G.

l i

1

  • Attn reactor control room indication i

r i

1 i

i j

i CRYSTAL RIVER - UNIT 3 3/43-29 Amendment No. 81 t

4 4

- -.,,. _ ~

._-..n-

_.--n, n.,

r TABLE 4.3-4 SEISMIC MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL CHANNEL CHANNEL FUNCTIONAL INSTRUMENTS AND SENSOR LOCATIONS CHECK CALIBRATION TEST 1.

Triaxial Time-History Accelographs

a. 95'0" Containment vessel foundation M*

R SA

b. 267'6" Outside Containment on top of ring girder M*

R SA c.145'0" Control room floor M*

R SA 2.

Triaxial Peak Accelographs

a. 140'0" At top of reactor R

NA NA b.175'6" Piping at top of one S.G.

R NA NA c.166'8" Top of Borated Water Storage Tank R

NA NA l

3.

Triaxial Seismic Switches

a. 95'0" Containment vessel foundation M**

R SA L

" Except seismic trigger

    • With reactor control room indication 4

i l

a CRYSTAL RIVER - UNIT 3 3/4 3-30 l

. ~

,