ML20137W206
| ML20137W206 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/30/1985 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Williams J TOLEDO EDISON CO. |
| References | |
| NUDOCS 8510040250 | |
| Download: ML20137W206 (1) | |
Text
SEP 3 01985 Docket No. 50-346 Toledo Edison. Company ATTN:.Mr. Joe. Williams, Jr.
Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:
Thank you for your July 16' 1985,.10 CFR 50.71(e) submittal. The Revision 3 changes to Chapter 17.0 (Quality Assurance Program for Station Operation) have been reviewed as required by 10 CFR 50.54(a).
The review assessed the adequacy of all Revision 3 changes including the reduction in comitment relative to records storage which was accepted in our letter dated November 9,1984, and other minor changes outlined in our letter dated December 3, 1984. Based on the results of our review, we consider Revision 3 acceptable.
We appreciate your timely submittal of the information required by 10 CFR 50.54 (a).
Please contact Mr. Frank Hawkins of my staff (312-790-5555) with any questions you have regarding this matter.
Sincerely, Carl J. Paperiello, Director Division of Reactor Safety cc w/ enclosure:
L. Storz, Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Harold. W. Kohn, Ohio EPA James W. Harris, State of Ohio Robert H._Quillin, Ohio Department of Health G. T. Ankrum, IE III RIII RI R DI Vandel/lc Hawkins cl.iw eyes Pa riello 9/26/85 7
y 7, /
8510040250 850930 g6 -
/ 3/
PDR ADOCK O
._.