ML20137W198
| ML20137W198 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 12/04/1985 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20137W136 | List: |
| References | |
| 50-369-85-39, 50-370-85-40, NUDOCS 8512100197 | |
| Download: ML20137W198 (1) | |
Text
_ _ _ _ _ - -
4 i
l' a
ENCLOSURE 1 NOTICE OF DEVIATION i
i i
Duke Power Company Docket Nos. 50-369 and 50-370 l
McGuire Units 1 and 2 License Nos. NPF-9 and NPF-17 1
The following deviations were identified during an inspection conducted on October 15 - November 8, 1985.
McGuire FSAR Section 6.4.3 and Table 6.2.3-4 stipulate that inplace testing
{
of the Control Room Area Ventilation Systems (CV) were in compliance with.
l Regulatory Guide 1.52 (Revision 2, March 1978) which in turn obligates the licensee to ANSI N510-1975.
Contrary to those commitments, a review of completed preoperational tests performed on McGuire Control Room Area Ventflation Trains A and B revealed that Regulatory. Guide 1.52 and/or ANSI N510-1975 were not adhered to in that the air-aerosol uniformity tests were not performed as specified.
This deviation is applicable to Units 1 and 2.
Please provide, in writing within 30 days of the date of this Notice, a description of corrective actions regarding these deviations, actions taken to avoid further deviations, and the dates when these actions were or will be completed.
l j.
Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.
Date:
DEC 0 41985 8512100197 851204 PDR ADOCK 05000369 G