Discusses Semiannual Plant Performance Review of Plant Npp. Insp Plan for Next 6 Months Encl
ML20137V947
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/04/1997
From: Shymlock M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Campbell W
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9704170465
Download: ML20137V947 (6)


Text

._.. _ __.____..._...___...m._ _ _ _ . _ . _

l April 4,1997

. Carolina Power & Light Company  ;

ATTN: Mr. W. R. Campbell Vice President L Brunswick Steam Electric Plant i

P. O. Box 10429 Southport NC 28461

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - BRUNSWICK l

Dear Mr. Campbell:

On March 13, 1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of Brunswick Nuclear Plant. The staff conducts these reviews for all operating nuclear zwer plants to develop an integrated understanding of safety performance. T1e results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Brunswick I

involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 to March 1997. PPRs provide NRC management with a current summary of licensee wrformance and serve as inputs to the NRC Systematic Assessment of Licensee I

'erformance (SALP) and Senior Management Meeting (SMM) reviews. l This letter advises you of our planned inspection effort resulting from the 1 Brunswick PPR review. It is provided to m mimize the resource impact on your l staff and to allow for scheduling conflicts and personnel availability to be i resolved in advance of inspector arrival onsite. The enclosure details our I inspection plan for the next 6 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

During each NRC inspection planned during this period, specific attention will be given to the verification of selected UFSAR commitments. Applicable portion (s) of the UFSAR that relate to the inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices, procedures and/or parameters. The goal is-to determine the accuracy of the UFSAR regarding existing plant practices and conditions by providing specific attention to the UFSAR when performing various reactor inspections. Inspectors will not be judging the overall completeness of the UFSAR: rather, the inspections will focus on identifying differences between the UFSAR description and the plant.

9704170465 970404

PDR ADOCK 05000324 j- G .PDR 18195E55PUNN fl[Cl ,

CP&L 2 We will inform you of any changes to the inspection plan. If you have any questions, please contact me at 404-331-5535.

Sincerely.

(Original signed by Milton B. Shymlock) l Milton B. Shymlock, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50 325, 50 324 License Nos. DPR 71 and DPR 62

Enclosure:

Inspection Plan cc w/ encl:

l W. Levis, Director Site Operations Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 R. P. Lopriore Plant Manager Brunswick Steam Electric Plant Carolina Power & Light Company P. O. Box 10429 l Southport, NC 28461 J. Cowan, Vice President Operations & Environmental Support MS OHS 7 Carolina Power & Light Company

P. O. Box 1551 l

Raleigh, NC 27602 Gerald D. Hicks Hanager Regulatory Affairs

! Carolina Power & Light Company l P. O. Box 10429 l Southport, NC 28461  ;

W. D. Johnson, Vice President and Senior Counsel Carolina Power & Light Company

! P. O. Box 1551 l Raleigh, NC 27602 (cc w/ encl cont'd - See page 3) l

CP&L 3 (cc w/ encl cont'd)

Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental Health & Natural Resources

, P. O. Box 27687

Raleigh. NC 27611 7687 1

j Karen E. Long Assistant Attorney General 4

State of North Carolina

P. O. Box 629 Raleigh. NC 27602 Robert P. Gruber 7

Executive Director Public Staff NCUC P. O. Box 29520 Raleigh, NC 27626 0520 s

Public Service Commission i State of South Carolina i P. O. Box 11649

! Columbia, SC 29211 Jerry W. Jones, Chairman Brunswick County Board of ,

Commissioners '

P. O. Box 249 Bolvia, NC 28422 Dan E. Summers Emergency Management Coordinator New Hanover County Department of Emergency Management P. O. Box 1525 Wilmington, NC 28402 William H. Crowe, Mayor 4 City of Southport 201 East Moore Street Southport, NC 28461 Distribution w/ encl: (See page 4)

l.

I l

CP&L 4 l Distribution w/ encl:

M. Shymlock, RII G. Wiseman, RII

! D. Trimble, NRR K. Barr, RII H. Christensen, RII l P. Fredrickson, RII l W. Holland, RII T. Peebles, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission 8470 River Road, SE Southport, NC 28461 f

I l

I

/

OFFICE RII:0PP PIf:0RS s if f PS\. RfI:DRS - Rff:0RS RfI DRS

?" s0.0 )es f Khr - PFr r1 son NAME GWisem WHolland (Mhristensen TP DATE 04 / V / 97 04 / 7 / 97 01 / 3 / 97 04 / $ / R 04/ / 97 04 / 7 / 97 COPY? (YE9 N0 hES) NO [YES} NO YES # /N0/

f (YEM NO YES NO OFFICIAL RECORD COPY DOCUMENT NAM i; W \tirtV\PPR\ tQPPR . ' 9 / yRPPR9/ . LTR T

i

CP&L ,

BRUNSWICK

~

INSPECTION PLAN FOR: 4/97 - 9/97 IP - Inspection Procedure Tl - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

Brunswick SALP Period ends May 24,1997 INSPECTION TITLE / NUMBER OF PLANNED TYPE OF INSPECTION -

PROGRAM AREA INSPECTORS INSPECTION COMMENTS DATES ,

IP 37500 Engineering 1 4/2-4/97 Core Inspection to Review EQ lssues and URI Followup IP 81700 Security Access 2 4/10-11/97 Regional initiative inspection to review access control upgrades with NRR IP 40500 Effectiveness of Licensee 2 4/14-18/97 Core inspection to review Corrective Action Program corrective actions and resolution of power uprate issues Operator Exams 3 4/14-18/97 Initial Operator Exam Preparation Operator Exams 3 4/28-5/2/97 initial Operator Exam Tl 2515/109 MOVs 2 5/12-23/97 Safety issue inspection for Closecut of GL 89-10 file g:\bru\smm\bruinsp. mat 1 ENCIOSURE

- . . - - - _ _ _ ~ _ - . . . - _ _ _ - _ _ _ _ _ - _ . _ - - - _ - - _ _ - - _

L CP&L  !

t IP 64704 Fire Protection Program 1 5/19-23/97 Core inspection and include '

Appendix R Emergency [

Lighting  !

IP 62700 Maintenance 1 6/2-6/97 Regional Initiative inspection

.}

to review increased Online F Maintenance I IP 37550 Engineering 1 6/2-6/97 Core Inspection to review j Corrective Actions /DBD i l lP 86700 Heavy Loads / Spent Fuel 1 TBD Inspection to witness spent Handling fuel cask loading and shipping  ;

TBD - To Be Determined j IP 81700 Physical Security 4 7/28-8/1/97 Core Security Inspection with NRR assist j IP 37550 Engineering 2 7/28-8/1/97 Core inspection /ETS & EQ l Issues i i

IP 84750 Radiation Protection 1 8/11-15/97 Core inspection i

/86750/TI-133 l

lP 83750 Occupational Radiation 1 9/22-26/97 Core Inspection  !

Exposure j IP 37550 Engineering 1 9/29-10/3/97 Core inspection to review implementation of Engineering i Modifications (U2 Outage) i I

i i

l file g:\bru\smm\bruinsp. mat 2

. _ _ _ - _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ . _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - - - _ - - _ _ _ _ _ _ _ _ - = _ _ _ _ _ - - - _ _ _ _ _ . . _ _

.-