ML20137V656
| ML20137V656 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/21/1985 |
| From: | Tucker H DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20137V661 | List: |
| References | |
| NUDOCS 8512100051 | |
| Download: ML20137V656 (1) | |
Text
e DUKE POWER Gonnen-P.O.150X 33180 CliAltLOTTE, N.C. 28242
' HAL II. TUCKER retspigo3e d[2."[21",o,,
('*"*~'"'
5MKlf November 21, 1985 Mr. Harold R. Denton, Director Office of Nuclear Regulatory Commission U.
S.
Nuclear Regulatory Commission Washington, D.
C.
20555 Attention:
Ms.
E.
G. Adensam, Chief Licensing Branch No. 4
Dear Mr. Denton:
In accordance with the requirements of 10 CFR 50, Ap]pendix J.V.B, please find enclosed ten copies of the Reactor Containment Building Integrated Leak Rate Test.
The test was conducted from June 29 through July 11, 1985.
All acceptance criteria were met.
Very truly yours,
/
x WL Hal B. Tucker t
WLH:slb Attachments cc:
(w/2 copies of attachmeht) ur.
o.
Nelson urace, xegional Administrator U.
S. Nuclear Regulatory Commission-Region II 101 Marietta-Street NW Suite 2900 i
Atlanta, Georgia
- 36323, (w/1 copy of attachment)
NRCResidentInsgectortation gc0g Catawba Nuclear
,p w/g+e o,
gobk 00 414 6 0 '"#* *)
21 PDR ggg gy A
(6mmitL) psSo on-)
c8 eg A Rotf4)
Fo B m.
a w,ae ut o~m