AVERAGE DAILY UNIT POWER LEVEL'-
DOCKET N0.'50-423 UNIT Millstone Unit No. 3 DATE 12/5/85 COMPLETED BY D. McDaniel TELEPHONE (203) 444-4389 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net).
(MWe-Net)-
1 N/A 17 N/A 2
N/A 18 N/A 3
N/A 19 N/A 4
N/A 20 N/A 5
N/A 21 N/A 6
N/A 22 N/A 7
N/A 23 N/A 8
N/A 24 N/A 9
N/A 25 0
10 N/A 26 0
11 N/A 27
'O 12 N/A 28 0
13 N/A 29 0
14 N/A 30 0
15 N/A 31 16 N/A B602190501 851130 r-PDR ADOCK 05000423 R
pop a
,1
7-
'e. e 1 OPERATING DATA REPORT DOCKET N0. 50-423 l
DATE 12/10/85 l
COMPLETED BY D. McDaniel TELEPHONE (203) 447-1791 OPERATING STATUS 1.
Unit Name: Millstone Unit 3 NOTES 2.
Reporting Period: November 1985 3.
LicensedThermalPower(MWt): 170 4.
NameplateRating(GrossMWe): 1208 5.
Design Electrical Rating.(Net MWe): 1153 6.
MaximumDependable. Capacity (GrossMWe): N/A 7.
Maximum Dependable Capacity (Net MWe): _N/A 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe): 0 10.
Reasons For Restrictions, If Any: Initial Startup This Month Yr To Date Cumulative 11.
Hours In Reporting Period
_,N/A N/A N/A 12.
Number of Hours Reactor Was Critical N/A N/A N/A 13.
Reactor Reserve Shutdown Hours N/A' N/A N/A 14.
Hours Generator On Line N/A N/A N/A 15.
Unit Reserve Shutdown Hours N/A N/A N/A-16.
Gross Thermal Energy Generated (MWH)
N/A N/A N/A 17.
GrossElectricalEnergyGenerated(MWH)
N/A N/A N/A 18.
Net Electrical Energy Generated (MWH)
N/A N/A N/A 19.
Unit Service Factor N/A N/A N/A 20.
Unit Availability Factor N/A N/A N/A 21.
UnitCapacityFactor(UsingMDCNet)
N/A N/A N/A 22.
UnitCapacityFactor(UsingDERNet)
N/A N/A
-N/A 23.
Unit Forced Outage Rate N/A N/A N/A 24.
Shutdowns Scheduled Over Next 6' Months (Type, Date, and Duration of Each):
(See Attached) 25.
If Shut Down at End of Report Period, Estimated Date of Startup:
26.
Units in Test Status (Prior to Commercial Operation): Forecast Achieved Initial Criticality 1/4/86 Initial Electricity 1/14/86 Commercial Operation 5/1/86
.a
't Operating Data Report Attachment
- 24. Scheduled Shutdowns During Startup Testing January 7, 1986 Reactor Trip per Technical Specification during Low Power Physics. Tests
- 8. hour duration.
January 22, 1986 Reactor Trip from 30% power during Ascension Testing - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> l
duration..
~
l
. January 30, 1986 Reactor, Trip from 50% power during power Ascension. Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> duration.
i
' February 13, 1986 Reactor Trip from 20% power during power Ascension Testing - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration.
February 23, 1986 Reactor Trip from 100% power during power Ascension Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> l'
duration.
l t
b
...i
v.
C y je i
UNIT SHUT 006MS AND POER REDUCTIONS
. s '*
DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE 12/10/85-COMPLETED BY D. McDaniel TELEPHONE (203) 444-4389 Ext. 4389 l
REPORT MONTH November Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type (1)
(Hours)
Reason (2)
Down Reactor (3) Report #
Code Code Prevent Recurrence-
-N/A N/A S
N/A H
N/A N/A N/A N/A' Initial Plant Startup 1
2 3. F: Forced Reason:
Method:
Exhibit G - Instructions-5: Scheduled A.- Equipment Failure -(Explain) 1 - Manual for Preparation 'of Data.
B3-Msintenance or Test 2 - Manual Scram Entry Sheets for C - 1 fueling 3 - Automatic Scram'
' Licensed Event Report D - degulatory Restriction 4 - Continued from (LER) File _(NUREG-0161)
E - Operator Training & License; previous month Examination 5 - Power Reduction 5-F
. Administrative (Duration = 0)'
Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)
H - Other'(Explain)
. J
mll
,. h NORTHEAST UTIEJTIES 1
,7 C Z % ". L ~ ~"
$?fo%7 CONNECTICUT 06101
';;=0"=lO'S* """
m eesen L
L J ::::05:"a = O"~"
December 12, 1985 MP. 8481 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Reference:
Facility Operating License No. NPF-44 Docket No. 50-423
Dear Sir:
This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 3 Monthly Operating Report 85-1 in accordance with Technical Specifications, Section 6.9.1.5.
One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY hb?/
W. D. Rorp g
Station Superintendent Millstone Nuclear Power Station WDR/DM:se Attachment cc: Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D.C. (10)