Monthly Operating Rept for Nov 1985
ML20137V471
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/30/1985
From: Mcdaniel D, Romberg W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
MP-8481, NUDOCS 8602190581
Download: ML20137V471 (5)


Text

.

q

~

, : -- /.

?

AVERAGE DAILY UNIT POWER LEVEL'-

DOCKET N0.'50-423 UNIT Millstone Unit No. 3 DATE 12/5/85 COMPLETED BY D. McDaniel TELEPHONE (203) 444-4389 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net).

(MWe-Net)-

1 N/A 17 N/A 2

N/A 18 N/A 3

N/A 19 N/A 4

N/A 20 N/A 5

N/A 21 N/A 6

N/A 22 N/A 7

N/A 23 N/A 8

N/A 24 N/A 9

N/A 25 0

10 N/A 26 0

11 N/A 27

'O 12 N/A 28 0

13 N/A 29 0

14 N/A 30 0

15 N/A 31 16 N/A B602190501 851130 r-PDR ADOCK 05000423 R

pop a

,1

7-

'e. e 1 OPERATING DATA REPORT DOCKET N0. 50-423 l

DATE 12/10/85 l

COMPLETED BY D. McDaniel TELEPHONE (203) 447-1791 OPERATING STATUS 1.

Unit Name: Millstone Unit 3 NOTES 2.

Reporting Period: November 1985 3.

LicensedThermalPower(MWt): 170 4.

NameplateRating(GrossMWe): 1208 5.

Design Electrical Rating.(Net MWe): 1153 6.

MaximumDependable. Capacity (GrossMWe): N/A 7.

Maximum Dependable Capacity (Net MWe): _N/A 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe): 0 10.

Reasons For Restrictions, If Any: Initial Startup This Month Yr To Date Cumulative 11.

Hours In Reporting Period

_,N/A N/A N/A 12.

Number of Hours Reactor Was Critical N/A N/A N/A 13.

Reactor Reserve Shutdown Hours N/A' N/A N/A 14.

Hours Generator On Line N/A N/A N/A 15.

Unit Reserve Shutdown Hours N/A N/A N/A-16.

Gross Thermal Energy Generated (MWH)

N/A N/A N/A 17.

GrossElectricalEnergyGenerated(MWH)

N/A N/A N/A 18.

Net Electrical Energy Generated (MWH)

N/A N/A N/A 19.

Unit Service Factor N/A N/A N/A 20.

Unit Availability Factor N/A N/A N/A 21.

UnitCapacityFactor(UsingMDCNet)

N/A N/A N/A 22.

UnitCapacityFactor(UsingDERNet)

N/A N/A

-N/A 23.

Unit Forced Outage Rate N/A N/A N/A 24.

Shutdowns Scheduled Over Next 6' Months (Type, Date, and Duration of Each):

(See Attached) 25.

If Shut Down at End of Report Period, Estimated Date of Startup:

26.

Units in Test Status (Prior to Commercial Operation): Forecast Achieved Initial Criticality 1/4/86 Initial Electricity 1/14/86 Commercial Operation 5/1/86

.a

't Operating Data Report Attachment

24. Scheduled Shutdowns During Startup Testing January 7, 1986 Reactor Trip per Technical Specification during Low Power Physics. Tests

- 8. hour duration.

January 22, 1986 Reactor Trip from 30% power during Ascension Testing - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> l

duration..

~

l

. January 30, 1986 Reactor, Trip from 50% power during power Ascension. Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> duration.

i

' February 13, 1986 Reactor Trip from 20% power during power Ascension Testing - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> duration.

February 23, 1986 Reactor Trip from 100% power during power Ascension Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> l'

duration.

l t

b

...i

v.

C y je i

UNIT SHUT 006MS AND POER REDUCTIONS

. s '*

DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE 12/10/85-COMPLETED BY D. McDaniel TELEPHONE (203) 444-4389 Ext. 4389 l

REPORT MONTH November Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Type (1)

(Hours)

Reason (2)

Down Reactor (3) Report #

Code Code Prevent Recurrence-

-N/A N/A S

N/A H

N/A N/A N/A N/A' Initial Plant Startup 1

2 3. F: Forced Reason:

Method:

Exhibit G - Instructions-5: Scheduled A.- Equipment Failure -(Explain) 1 - Manual for Preparation 'of Data.

B3-Msintenance or Test 2 - Manual Scram Entry Sheets for C - 1 fueling 3 - Automatic Scram'

' Licensed Event Report D - degulatory Restriction 4 - Continued from (LER) File _(NUREG-0161)

E - Operator Training & License; previous month Examination 5 - Power Reduction 5-F

. Administrative (Duration = 0)'

Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)

H - Other'(Explain)

. J

mll

,. h NORTHEAST UTIEJTIES 1

,7 C Z % ". L ~ ~"

$?fo%7 CONNECTICUT 06101

';;=0"=lO'S* """

m eesen L

L J ::::05:"a = O"~"

December 12, 1985 MP. 8481 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Facility Operating License No. NPF-44 Docket No. 50-423

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 3 Monthly Operating Report 85-1 in accordance with Technical Specifications, Section 6.9.1.5.

One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY hb?/

W. D. Rorp g

Station Superintendent Millstone Nuclear Power Station WDR/DM:se Attachment cc: Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D.C. (10)

U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D. C. 20555 c

i i