Submits TMI Program Ofc Weekly Status Rept for Wk of 850923-30
ML20137V469
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/30/1985
From: Travers W
Office of Nuclear Reactor Regulation
To: Harold Denton, Snyder B
Office of Nuclear Reactor Regulation
References
CON-NRC-TMI-85-074, CON-NRC-TMI-85-74 NUDOCS 8510040041
Download: ML20137V469 (4)


Text

_. -- - _ _ _ . _ _

~

p ,* _

- _ i j

September 30, 1985 NRC/THI-85-074 l

l HEMORANDUM FOR: Harold R. Denton, Director '

Office of Nuclear Reactor Regulation Bernard J. Snyder, Program Director TMI Program Office FRON: William D. Travers, Deputy Program Director  !

THI Program Office

SUBJECT:

NRC THI PROGRAM 0FFICE WEEKLY STATUS REPORT FOR  !

SEPTEMBER 23, 1985 - SEPTEMBER 30, 1985

1. PLANT STATUS ,

The facility remains in long tem cold shutdown with the Reactor Coolant System (RCS) vented to the reactor building atmosphere and i the reactor vessel head and plenum assembly removed from the reactor vessel.

The plenum is on its storage stand in the deep end of the fuel transfer canal. A dam has been installed between the deep and j shallow ends of the fuel transfer canal. The deep end is filled {

with water to a depth of about 20 feet (about 5 feet above the top '

oftheplenum).

The modified internals indexing fixture is installed on the reactor vessel flange and is flooded to elevation 327 feet 6 inches (156 1

feet above the top of the core region). The defueling platform is installed over the Internal Indexing Fixture in preparation for defueling.

i Calculated reactor decay heat is less than 12 kilowatts.

C RCS cooling is by natural heat loss to the reactor building ambient atmosphere. Incore themocouple readings range from 70*F to 91*F with an average of 80*F. Average cold leg temperature is 54*F.

r: -

The average reactor building temperature is 56*F. The reactor

' building airborne activity is 9.8 E-7 uC1/cc Tritium and 1.9 E-10 uC1/cc particulate, predominantly Cesium 137.

2. WASTE MMIAGEMENT The Submerged Demineralizer System (SDS) was shutdown during this period.

pff)

EPICOR 11 completed processing batch 266 from Condensate Tank 1A (C0T-1A). To date 56,000 gallons from this batch have been processed. From September 26 to September 29, 1985 this water was transferred from CC-T-2 back to COT-1A. COT-1A.had been desludged in the interim while it was empty. je[' '

E o,m > I l l b -

8510040041 850930 "'

c => ' ' ' "

PDR ADOCK 05000320 y

.cr >

R PDR -

sac ronu ne no-soi nacu eno OFFICIAL RECORD COPY

. Haroid R. Denton ~

2 Sep'tember 30, 1985 g - terna d T snyder HRC/THI-35-074 Total volune processed through SDS to date is 2,963,375 gallons, ar.d the total volume processed through EPICOR II is 2,662,932 9311ons.

3. DOSEREDUCTION/DECOHTAMINATIONAfTIVITIES Decontamination activities are continuing on the 281' level of the auxiliary building.

Average general area radiation dose rate is 40 area per hour on the 347' level of the reactor building and is 67 mrem per hour on the 305' level of the reactor building.

4. RADI0 CHEMISTRY ANALYSIS ERROR The licensee has identified an error at THI-2 in their radiochenistry analysis procedure for quantifying strontium-90 (Sr-90) in solid samples. The error has resulted in samples being reported at one-half their actual Sr-90 values. The error does not affect gaseous or liquid samples since these are typically analyzed by a different process. The analysis error is believed unique to THI-2 in using a beta spectrometer for rapid assessment of accident-generated Sr-90 levels. The error involved failure to correctly interpret calibration procedure wording with respect to equilibrium of Sr-90 and Yttrium-90 in the standards.

A preliminary evaluation by the licenses indicates the error is not likely to impact compliance with regulations related to occupational exposure or radiological effluent releases. The error does affect at least one past shipment of radioactive waste to U. S. Ecology in Hanford, Washington. The shipment documents indicate at least one barrel had not been accurately classified as required by State of Washington and hRC regulations (10 CFR 61.55).

5. ENVIRONMEllTAL i;0!lITORING US Environnental Protection Agency (EPA) sample analysis results show THI site liquid effluents to be in accordance with regulatory limits, HRC requirements, and the City of Lancaster Agreement.

THI water samples taken by EPA at the plant discharge to the river consisted of seven daily composite samples taken from September 7 through September 14, 1985.

The Lancaster water sample taken at the water works intake and analyzed by EPA consisted of a seven day composited sample taken from September 8 through September 14, 1985. A ganna scan detected no reactor related radioactivity.

The NRC outdoor airborne particulate sampler at the Till Site collected a sample between September 18 and September 25, 1985. No reactor related radioactivity was dett.cted. Analysis shewed Iodine-131 and Cesium-137 concentrations to be less than the lower limits of detectability.

FFICE) ,,, ,,,,,,,,,,,, ,, ,,,,,,,,,, ,,,,,,,,,,,,, ,,,,,,,,,,,,, ,,,, ,,,,,,,, ,,,.., ....

sum > ........... ............. ...... ...... ............. ............. ............. .... ........

^"> ............ ............. ............. ............. ............. ............ . ....... ..

NRC FORM 318 (10 80) NRCM O2' OFFICIR RECORD COPY

t

. .- K

.--Harold-Rr-TTe6 3 ._ September 30, 1985 Bernard J. Snyder NREATl!I-85-074 w

6. REACTOR BUILDIl4G ACTIVITIES Defueling Water Cleanup System (DWCS) preoperational testing and modification continued.

Installation of cable tray shielding is complete.

Preoperational testing of the reactor building sump recirculation systen components is complete. The system is now operable.

Work is in progress on the canister positioning system and canister handling bridg2.

Installation of the vacuum defueling systen began.

7. AUXILIARY AND FUEL HAliDLING BUILDING ACTIVITIES Installation of the DWCS continued. Partial DUCS turnover for processing RCS during early defueling is expected to be completed in October.

All four of the fuel canister storage racks 'have been delivered to the THI site and inspected. The third rack delivered is being installed and its position adjusted in spent fuel pool "A". The second rack delivered has been repaired and re-inspected and is being prepared for installation. The first rack delivered has been repaired and is being re-inspected. The fourth rack is being rapaired.

8. NRC EVALUATIONS IN PROGRESS Technical Specification Change Requests numbers 48, 49, and 50.

Recovery Operations Plan Change nux.bers 29, 31, and 32.

Fuel Canister Technical Evaluation, Revision 1.

Defueling Safety Evaluation.

App'.ication for seismic exenption.

SDS Technical Evaluation and Systea Description Update.

Core . Stratification Sanple Safety Evaluation.

Heavy Load Handling Safety Evaluation Report.

9. PU3LIC NEETING The next meeting of the Advisory Panel is scheduled for October 16, 1985 in Lancaster, Pennsylvania at 7:00 PM. The meeting will be held in the Lancaster Council Chanbers at 201 Hnrth Duke Street. Dr. H. Arnold
  • Muller, Secretary, Department of Health will review the results of the Health Department's recently coupleted epidemiology studies.

Persons desiring the opportunity to speak before the Panel are asked to contact Mr. Thomas Staithgall at 717-291-1042 or write to him at 2122 Marietta Avenue, Lancaster, Pennsylvania 17603.

M SIONW W, WiUlam D. Travers Williaa D. Travers Deputy Program Director T!H P rna ci m O f f i co

"'C'> ...... .... ........... ... ......... . ....... . ... ........ . ..... . .. ...........

Sum ^M$ ........... ..... . ... . .. ......... ............ ... ..... ... ............. ..... ......

ne ronu aia no soi nncu o24 OFFICIAL RECORD COPY

.,,,, l

.' Harold R. Denton 4 September 30, 1985 Bernard J. Snyder liRC/TMI-85-074 IliTERNAL DISTRIBUTI0ft

, EDO OGC Office Directors Commissioner's Technical Assistants flRR Division Directors liRR A/D's Regional Adrainistrators IE Division Directors TAS EIS THI Prograra Office Staff (10)

PHS EPA DOE RI Division Directors 3

Public Affairs, RI State Liaison, RI

, THIPO HQ r/f i

Till SITE r/f i CEriTRAL FILE NRC PDR LOCAL PDR 3

Ti1I-2 Prcject Section File

' o"'c' > IM.IP9....... .IM.I.2,PSffh, JM,1fp,,,,,, . JM,I ,0, [, , , ,,,,,,,,,,,,, ,,,,,,,,,,,,, ,,,,,,,,,,,,,

esa~~ > . .ccpg,1,1,1, , , , ,P,G/gt, , , , , , , , WJ, , 7,s, , , , ,

!Th9J s.:).e.s. ,,,,,,,,,,,,, ,,,,,,,,,,,,, ,,,,,,,,,,,,,

~"P 9/$85..... .9/A?85..... 9/.81.5. . . .. 9/. . . /85~ >

l wac e nu in <io sai nacu o2' OFFICIAL RECORD COPY