4 Docket No.: 50-423 i
i Mr. John F. Opeka Senior Vice President Nuclear Engineering and Operations
]
Northeast Nuclear Energy Company j
P. O. Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
)
Subject:
Failure to submit information requested by the staff in a timely j
- manner, i
l Representatives of your staff committed to provide all additional information re-quested by the staff related to Technical Specification by September 25, 1985.
Nine items of requested information required by the staff to continue our review have not been submitted to date and two items submitted did not satisfactorily 1
address our concerns. These are identified in Enclosure 1 to this letter.
Because c ' NNECo's failure to provide the requested information in a timely i
manner we will be unable to issue our Final Draft Technical Specification on September 30 as we had previously intended.
Additional delay in submitting requested information or the submittal of in-i s
adequate information could result in a delay in issuance of the final version of i
j the Technical Specifications needed for issuance of an operating license for Millstone Unit 3.
l Sincerely,
}
i j
B. J. Youngblood, Chief Licensing Branch No. I j
Division of Licensing 1
Enclosure:
As stated l
l cc: See next page 4
DISTRIBUT '0N:
i 4 gocaat me,1 OELD l
NRC PDR '
ACRS(16) i Local PDR JPartlow I
PRC System EJordan j
NSIC BGrimes i
LB#1 R/F
}
EDool ttle l
LB j l
\\
ED (
- le/mac E:JY blbod
{
g/tb/85 f /KV85 i
i f
$"$N $b23 PM A
s.
s STATUS OF MILLSTONE 3 TECHNICAL SPECIFICATION REVIEW Information Requested and not Provided 1.
Revised Boron Dilution Analysis to support revised SDM 2.
Flow Uncertainty Values and Analysis 3.
Table 3.3-1 ACTION 2 (dependent upon setpoint methodology) 4.
Justification for 10% S/G secondary side water level 5.
Air Temperature Monitor locations in containment 6.
Bases for C.R. Envelope Pressurization System 7.
Values and new statement on boron dilution p. B 3/4 1-1 and 1-2 8.
Instrument error value p. B 3/4 7-7 9 Secion 6 (Figure 6.2.2 or revised FSAR)
Inadequate Information Provided 1.
Table 3.3.5 Response times 2.
Seismic Instrument (Table 3.3-7 consistent with FSAR Other Information Requested 1.
SLCRS (95% filter efficiency) 2.
PIVs(MEBrelaxedrequirementsifjustified)
Mr. J. F. Opeka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. 3 cc:
Gerald Garfield, Esq.
Ms. Jane Spector Day, Berry & Howard Federal Energy Regulatory Commission City Place 825 N. Capitol Street, NE Hartford, Connecticut 06103-3499 Room 8608C Washington, D.C.
20426 Mr. Maurice R. Scully, Executive Director Connecticut Municipal Electric Energy Cooperative 268 Thomas Road Groton, Connecticut 06340 Robert W. Bishop Esq.
Corporate Secretary Northeast Utilities Post Office Box 270 Hartford, Connecticut 06141 Mr. T. Rebelowski Senior Resident Inspector Office U. S. Nuclear Regulatory Commission Millstone III P. O. Box 615 Waterford, Connecticut 06385 Mr. Michael L. Jones, Manager Project Management Department Massachusetts Municipal Wholesale Electric Company Post Office Sox 426 Ludlow, Massachusetts 01056 Regional Administrator U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Karl Abraham Public Affairs Office, Region I U. S. Nuclear Regulatory Commission, King of Prussia, Pennsylvania 19406 s
.