_ - - . - . _ _ . - . _ _ _ . . _._ . _ _ ____---_ _ ___._ _ _ _

. t t

?

April 4,1997 i i

Duke Power' Company >

ATTN: Mr. H. B. Barron i Vice President McGuire Site 12700 Hagers Ferry Road

  • Huntersville. NC 28078-8985 i

SUBJECT:

PLANT PERFORMANCE REVIEW - MCGUIRE i Gentlemen:

On March 7.1997, the NRC staff completed the semiannual Plant Performance i Review (PPR) of the McGuire Nuclear Station. The staff conducts these reviews i for all operating nuclear power plants to develop an integrated understanding  !

of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for i McGuire involved the participation of all regional technical divisions and NRR in evaluating. inspection results and safety performance information for the period from October 1996 through February 1997. PPRs provide regional )

management with a current summary of licensee performance and serve as inputs .

, to the NRC Systematic Assessment of Licensee Performance and senior management t l meeting reviews.  ;

This letter advises you of our planned inspection effort resulting from the  !

l McGuire PPR review. It is provided in an attempt to minimize the resource ,

impact on your staff and to allow for scheduling conflicts to be resolved in advance of inspection dates. The enclosure presents our inspection plan for the next six months. Specific dates are included for near-term inspections.

! Long term inspection dates will be announced prior to the inspections and any  :

- scheduling conflicts will be resolved with your staff. The rational or basis l for each inspection outside the core inspection program is provided so that  :

i you are aware of the reasons for em)hasis in these program areas. Resident I i inspections are not listed due to t1eir ongoing and continuous nature, nor are  !

l Region based inspections which accomplish Resident Core Modules to compensate ,

for Resident-Inspector absences due to training. l 1

l During each NRC inspection planned during this period, specific attention will l l.

continue to be given to the verification of selected Updated Final Safety Analysis Re) ort (UFSAR) commitments. Applicable portion (s) of the UFSAR that relate to tie inspection activities will be reviewed and verification made that the UFSAR commitments have been properly implemented into plant practices. procedures and/or parameters.

\

i 9704170123 970404 PDR ADOcK 05000369 G PDR c M.h @ . .

l dO/

1 l

l l

DPC 2 We will inform you of any changes to the inspection plan. If you have any questions, please contact C. Casto at (404) 331-5506.

Sincerely.

Original signed by:

Charles A. Casto. Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-369. 50-370 License Nos. NPF-9, NPF-17

Enclosure:

NRC Inspection Plan cc w/ encl:

James Snyder Regulatory Compliance  !

Duke Power Company  !

12700 Hagers Ferry Road Huntersville, NC 28078-8985 G. A. Copp Licensing - EC050 Duke Power Company P. O. Box 1006 Charlotte. NC 28201-1006 Paul R. Newton Legal Department (PB05E)  !

Duke Power Company .

422 South Church Street l Charlotte. NC 28242-0001 Mr. Robert P. Gruber Executive Director Public Staff - NCUC P. O. Box 29520 Raleigh, NC 27626-0520 J. Michael McGarry. III. Esq.

Winston and Strawn 1400 L Street, NW Washington, D. C. 20005 l cc w/ enc 1 cont'd: (See page 3) l l

w.

E DPC 3 <

1 cc w/ encl cont'd: Distribution w/ encl cont'd: .

Dayne H. Brown. Director NRC Resident Inspector Division of P.adiation Protection U.S. Nuclear Regulatory Comm.

N. C. Department of Environment, 78128 Rochester Highway

Health & Natural Resources Seneca. SC 29672 P. O. Box 27687 Raleigh, NC 27611-7687 County Manager of Mecklenburg County 720 East Fourth Street Charlotte. NC 28202 Peter R. Harden IV Account Sales Manager Power Systems Field Sales Westinghouse Electric Corporation P. O. Box 7288 Charlotte, NC 28241 Dr. John M. Barry. Director '

Mecklenburg County Department of Environmental Protection  ;

700 North Tryon Street Charlotte, NC 28203 Karen E. Long Assistant Attorney General N. C. Department of Justice P. O. Box 629 ,

Raleigh. NC 27602 ,

Distribution w/ encl:

V. Nerses NRR S. Rudisail. RII C. Casto, RII W. Holland, RII H. Christensen. RII T. Peebles. RII K. Barr, RII P. Fredrickson PUBLIC orrier pit. cop pit ops , pit:cos / pit:nos off. ops / pit. ops SIGNATURE p p  ! ,

NAME SRudisail 11and HChristensen TP es [yBarr Pfr sco DATE Q3 / M / 97 k/8! / 97 03 M l / 97 / / / 97 / M / 97 h/ / / 97 COPY? (YES) NO [YES') NO [fES) NO YES M ~

6ES) NO YES NO i 0Fi1CIAL KtLund CDPf UOLUMthl NAMt: G:\MCbPFn3.isl

~. . _ . . _ _ _ . _ . _.. . . _ . . _ _ _ _.. ._ ._ . . .__ _.-

MCGUIRE INSPECTION PLAN INSPECTION PROCEDURE / NUMBER OF PLANNED INSPECTION TEMPORARY INSTRUCTION TITLE / PROGRAM AREA INSPECTORS DATES TYPE OF INSPECTION - COMMENTS IP 40500 EFFECTIVENESS OF PROBLEM 2 TBD Regional initiative -

IDENTIFICATION. RESOLUTION Mispositionings/ configuration AND PREVENTION control issues at all 3 sites

[0PERATIONS - DRP 2210]  !

IP 71001 LICENSED OPERATOR 1 9/29/97 Core REQUALIFICATION PROGRAM EVALUATIONS

[0PERATIONS - OLHP 2330]

INITIAL OPERATOR LICENSE 3 7/14-18/97 Operator license  ;

EXAMINATIONS 7/28-8/1/97 examinations.

[0PERATIONS - OLHP 2330]

IP 62700 MAINTENANCE INSPECTION 1 5/19-23/97 Regional Initiative - Post

[ MAINTENANCE - MNT 2310] maintenance testing program review.

IP 62700 MAINTENANCE INSPECTION 1 6/16-20/97 Regional Initiative -

[ MAINTENANCE - MNT 2310] Planning and scheduling maintenance and Reactor Trip Breaker maintenance. .

IP 50001 STEAM GENERATOR 1 3/17-21/97 Regional Initiative - '

REPLACEMENT INSPECTIONS 4/7-11/97 continued inspection of SGRP

[ MAINTENANCE - MNT 2310] 4/28-5/2/97 activities.

IP 62706 MAINTENANCE RULE 5 8/18-22/97 Regional Initiative - Team

[ MAINTENANCE - MNT 2310] Inspection 1 of 2 w_ ___-_. - - . _ _ _ _ _ _ .-. _ _ _ _ _ - _ - _ _ - - - - . _ _ _ _ _ _ _ _ _ - _ . _ . - - _ _ _ _ _ _ - - - - - _ _ _ _ _ _ _ _ _ _ - _ _ - - - - - - _ _ _ - - _ _ - - _ _ - _ _ _ _ _ _ _ _ -- _ . - -

IP 37550 ENGINEERING 1 5/5-9/97 Core - Focus of outage

[ ENGINEERING - ENG 2320] 5/19-23/97 modifications. 50.59 10/6-10/97 evaluations. and inspection on design bases of Refueling Water Storage Tcnk and its' function associated with ECCS.

OPERATIONAL EXPOSURE 1 10/27-31/97 Core - Focus on radiological IP 83750 [ PLANT SUPPORT - PS 2340] work practices and exposure controls.

IP 82301 EMERGENCY PREPAREDNESS 1 8/4/97 Core - Focus on scheduled IP 82302 [ PLANT SUPPORT - PS 2340] Emergency Preparedness exercise.

PHYSICAL SECURITY PROGRAM 1 7/21/97 Core - Review of audits and IP 81700 [ PLANT SUPPORT - PS 2350] corrective actions security  !

program plans. protected area detection equipment. and alarm stations and communications.

l 4

2 of 2 '