ML20137U733

From kanterella
Jump to navigation Jump to search
Forwards Reactive Safeguards Insp Rept 50-341/85-47 on 851112-1227.Enforcement Conference Held on 860117 in Region III to Discuss Potential Violations Noted During Insp
ML20137U733
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/11/1986
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Agosti F
DETROIT EDISON CO.
Shared Package
ML20137U738 List:
References
NUDOCS 8602190305
Download: ML20137U733 (2)


See also: IR 05000341/1985047

Text

_

g

O *

Di8

fACEDIIAnno p air o rir p e 7,n g t

" " U n i k U V is u Vain utiavj)

FEB 11 1986

Docket No. 50-341

The Detroit Edison Company

ATTN: Frank Agosti

Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the reactive safeguards inspection conducted by Messrs.

J. R. Creed, T. J. Madeda, G. L. Pirtle, and J. R. Kniceley of this office

on November 12 through December 27, 1985, of activities at the Enrico Fermi

Atomic Power Plant, Unit 2, authorized by NRC Operating License No. NPF-33

and to the discussion of our findings with Mr. F. Agosti anu other members

of your staff on November 21, December 13, and December 19, 1985, at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination'of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be potential

violations of NRC requirements. You will be notified by separate corres-

pondence of our decision regarding enforcement actions based on the findings

of this inspection. No written response is required until you are notified

of the proposed enforcement action.

The number and scope of potential violations represent a significant concern

on our behalf about the Jenior management direction and support provided to

the security program. These concerns were discussed during the onsite exit

meeting conducted on December 13, 1985 and at an Enforcement Conference held

in NRC Region III on January 17, 1986. Your senior plcnt staff's support,

oversight, and involvement is necessary to resolve these concerns as early as

practical.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10,-Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, our report of

this inspection will not be placed in the NRC Public Document Room.

8602190305 860211 Enclosure contain

PDR ADOCK 05000341 USEGUARD3 IIG

""

a

ggCn Mj ({

l

~

OA ~A 'I A 1 No nirnnn n n- ing t

V'l'UJAiJV v i v e u v i, i , M

_ _ _ _

o -

6 A P "r ' I A N S n y

VM1 C JN3 JG

f

= A ry g g - p r

s usuun, v,,

The Detroit Edison Company 2 FEB 1 i 1986

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

add

ck A. Hind, Director

Division of Radiation Safety

and Safeguards

Enclosure: Inspection Report

No. 50-341/85047(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosure:

L. P. Bregni, Licensing

Engineer

P. A. Marquardt, Corporate

Legal Department

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosure, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq.

Nuclear Facilities and

Environmental Monitoring

Section

Monroe County Office of

Civil Preparedness Enclosure contains

SAFEGUARDS INFORMATIOR

Upon separation this

page is Occontrolled

o n :- n

-

Vn l U N, smenrsnb<

lllitkin i id

III RIII RIII JI RIII III RIII II

%

.

-i f ~ g(s

}

1 tie /jp Madeda Kngceley <_ Wrig l$ St leton nd

'l1/n N* l /}\\% ll 2.lh/rf