.g
-
Docket No. 50-277/DPR-44
FEB 111985
Philadelphia Electric Company
ATTN: Mr. S. L. Daltroff
Vice President
Electric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection 50-277/85-40
This transmits.the findings of the routine safety inspection by Messrs.
J. H. Williams and T. P. Johnson on October 26 - December 31, 1985, at the Peach
Bottom Atomic Power Station, Unit 2, Delta, Pennsylvania. These findings were
based on observation of activities, interviews, measurements and document reviews,
and have been discussed with Mr. R. S. Fleischmann and Mr. D. C. Smith of your
staff.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Based on the results of
this inspection, it appears that one of your activities was not conducted in
full compliance with NRC requirements, as set forth in the Notice of Violation,
enclosed herewith as Appendix A.
This violation has been categorized by
severity level in accordance with the revised NRC Enforcement Policy (10 CFR 2,
Appendix C) published in the Federal Register Notice (49 FR 8583) dated
March 8, 1984. You are required to respond to this letter and in preparing
your response, you should follow the instructions in Appendix A.
We are concerned about the ability of Unit 2 to meet Technical Specification
shutdown margin requirements with a control rod blocked (tagged out) in the
fully withdrawn position as was identified during this inspection.
In addition
to your response to Appendix A, you are requested to address this concern and
describe any correction action taken or planned.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
A copy of this letter and the enclosures are being placed in the NRC public
Document Room.
8602190286 360211
ADOCM 05000277
'
G
l
OFFICIAL RECORD COPY
IR PB2 85-40 - 0001.0.0
\\
01/30/86
g
,
O
l
\\
--
---
-
- - -
.-
.
'
Philadelphia Electric Company
2
FEB 111L
Your cooperation with us is appreciated.
Sincerely,
gagiaalSissed By:
Samuel J. Collins, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report No. 50-277/85-40
cc w/encls:
i
R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station
' John S. Kemper, Vice President, Engineering and Research
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric
Troy B. Conner, Jr., Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
.
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
Region I Docket Room.(with concurrences)
Senior Operations Officer (w/o encis)
R. Gallo, Section Chief, DRP
C. Anderson, Section Chief, DRS
J. Wiggins, Section Chief, DRS
Rf\\I
DRP R
P
D
Williams /gcb/mjd
Johnson
Ga lo
Co ins
1/3//86
1/a//86
S/b(/86
3/\\ /86
0
0FFICIAL RECORD COPY
IR PB2 85-40 - 0002.0.0
01/31/86
i
.
--
,.- - .--- ,
---. .---
. ,.-- .,-,.-- .
,.
. , ,
- - . -
,
.~
,
- , , ~ - , ,
.