Forwards SER Re Integrated Plant Safety Assessment Rept Section 4.1.4(1), Emergency Procedures - Flooding. Procedure Should Be Revised to Initiate Flood Protection Actions at 19 Ft Instead of 21 Ft
Date released: 05/30/2020 Download: ML20137U670


SER Re Integrated Plant Safety Assessment Rept Section 4.1.4(1), Emergency Procedures - Flooding. Procedure Should Be Revised to Indicate Flood Protection Actions at 19 Ft Instead of 21 Ft
ML20137U680
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/24/1985
From:
NRC
To:
References
Download: ML20137U680 (79)
Forwards SER Re Integrated Plant Safety Assessment Rept Section 4.1.4(1), Emergency Procedures - Flooding. Procedure Should Be Revised to Initiate Flood Protection Actions at 19 Ft Instead of 21 Ft
ML20137U663
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/24/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: OPEKA J F
CONNECTICUT YANKEE ATOMIC POWER CO.
References
Download: ML20137U663 (2)