3
-
.
,
o
April 2, 1997
EA 97-130
Southern Nuclear. Operating Company, Inc.
ATTN: Mr. D. N..Morey
'
Vice President
Farley Project
P. O. Box 1295
Birmingham, AL 35201-1295
SUBJECT:
NRC INSPECTION REPORT 50-348/97-04 AND 50-364/97-04. AND APPARENT
VIOLATIONS
Dear Mr. Morey:
On March 14. 1997. the NRC completed a special inspection of the Penetration
Room Filtration (PRF) system at your Farley Nuclear Plant (FNP) facility. The-
enclosed report presents the results of that inspection.
During this special inspection, apparent violations were identified and are
being considered for escalated enforcement action in accordance with the
" General Statement of Policy and Procedure for NRC Enforcement Actions"
(Enforcement Policy), NUREG-1600. These apparent violations concern:
1) operating in a condition prohibited by Technical Specifications (TS):
2) inadequate operating, surveillance, and emergency procedures: 3) failure to
meet TS surveillance requirement 4.7.8.b.3 in one instance: 4) failure to
comply with specific sections of ANSI N510-1980, prescribed as TS surveillance
I
requirements for Control Room Emergency Filtration Systems (CREFS), PRF
'
systems, and Containment Purge Exhaust Filtration; and 5) excessive inleakage
into the penetration room boundary that resulted in the PRF system being
unable to function as designed. Accordingly, no Notice of Violation is
presently being issued for these inspection findings.
In addition, please be
advised that the number and characterization of apparent violations described
in the enclosed inspection report may change as a result of further NRC
review.
A predecisional enforcement conference to discuss these apparent violations
has been scheduled for April 18, 1997. The decision to hold a predecisional
enforcement conference does not mean that the NRC has determined that a
violation has occurred or that enforcement action will be taken.
To enable
the NRC to make an enforcement decision, this conference is being held to
obtain information such as a common understanding of the facts, root causes,
missed opportunities to identify the apparent violations sooner, corrective
actions, significance of the issues, and the need for lasting and effective
corrective action.
In addition, this is an opportunity for you to point out
\\
l
9704170040 970402
I
ADOCK 05000348
G
_
h.h
..
.
(Lot
'.
3
.
.
.
.
2
any errors in our inspection report and for you to provide any information
concerning your )erspectives on:
1) the severity of the violations: 2) the
application of tie factors that the NRC considers when it determines the
amount of.a civil penalty that may be_ assessed in accordance with
Section VI.B.2 of the Enforcement Policy: and 3) any other application of the
Enforcement Policy to this case, including the exercise of discretion in
accordance with Section VII.
You will be advised by separate correspondence of the results of our
deliberations on this matter.
No response regarding these apparent violations
1
is required at this time.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure will be placed in the'NRC Public Document Room.
1
Sincerely,
(Original signed by Pierce H. Skinner)
Pierce H. Skinner. Chief
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos.:
50-348 and 50-364
License Nos.:
Enclosure:
Inspection Report 50-348/97-04
and 50-364/97-04
cc w/ encl:
M. J. Ajluni
Licensing Manager -
Southern Nuclear Operating-
Company Inc.
i
P. O. Box 1295-
Birmingham, AL 35201-1295
R. D. Hill, Jr.
i
General Manager, Farley Plant
Southern Nuclear Operating
'
Company. Inc.
P. O. Box 470
Ashford, AL 36312
,
R. Badham, Supervisor
Safety Audit and Engineering Review
i
Farley Nuclear Plant
j
P. O. Box 470
Ashford, AL--36312
H
cc w/ enc 1:
(See page 3)
1
-
3
.
.
.
.
3
cc w/ enc 1:
J. D. Woodard
.
Executive Vice President
Southern Nuclear Operating
Company. Inc.
P. O. Box 1295
Birmingham.- AL 35201
-State Health Officer
Alabama Department of Public Health
434 Monroe Street
Montgomery. AL 36130-1701
M. Stanford Blanton
Balch and Bingham Law Firm
P. O.-Box 306
i
1710 Sixth Aven'ue North
Birmingham. AL 35201
.
Chairman
Houston County Commission
-P. O. Box 6406
Dothan. AL 36302
,
1
Distribution w/ encl:
J. Zimmerman.-NRR
,
J. Lieberman. OE
'
P. Skinner. RII
R.- Carrion. RII
,
PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Conunission
7388 N. State Highway 95
Columbia, AL 36319
!
i
i
,
^
i
0FritE
pff ORP
Di[ka
off ORo
Rff DPP
[C-
SIGNATURE
NApri
RPCarrion:dka
HSkiruler
THRoss
JHBartley
DATE
04 / 0 7-/ 97
04Lh/97
04 /
/ 97
04 /
/ 97
04 /
/ 97
04 /
/ 97
COPY?
/ YEM
NO
[kES) NO
YES
NO
YES
O
YES
NO
YES
NO
j
UFFICIAL RtCURD LOPY
LUULUMLNI HAM:.. G:\\t Aiu.LY \\Fh/04RP i .DF I
l
>
,-
c.
_ . , , - . . , - _ _ , . - - -
_,
.
. _ _ , - - . . _
TO
i 4fvJ ;Tfnrim
rwn
-
04 fii W/P t181PAM
riff 1
4 ht o n.
"
'
p
3
.
.
cc w/ encl:
J. D. Wuud dd
'
hecutive Vlte Prrhiilnni.
,
CButhernHutlearOp0Pating
4
x $$h5
i
l
Mrmingham. N. Ef.01
State llaalth Offieer
Alabau Dopertcent of Public Waitth
434 Monroe Stret
Montgomory.AL 36130>1701
'
M. Stanford Blanton
'
Balth and Dingham Law .iem
r
!
!
P. O. Box 306
1till 51xth svenue North
Bimingham. AL 36201
Chatman
Housten County Cwalblun
P. O. Box 6406
Dothan. AL 36302
tistribution w/ench
.
E. Zinmerman. NRR
,
J. Lieberman. OE
P. Skinnee. RII
R. Carrica. RII
-
'
PUBLIC
IECEiiidiiii.InsM0i
U... Nur. lear Reguintary Ca mis.sion
S
7300N,StateHithway90
Columbia. AL .36319
'
l
m
4 4
. . Ti , .wm +
taw
m e mo.
,,.a . ..
OtT. .J l , / 91, .) I
I97
, $101 191
.u t,31 i n
ut
In
91 1
1n
.
tran
m
o
r:t
e
pKQ n
vg
(O
rf
ug
gg
pg
,
,,.
uA,e Mr a wvm.uvvvwi uii
-
7Flcir nr.uv e
.