ML20137U579

From kanterella
Jump to navigation Jump to search
Advises That Operator & Senior Operator Licensing Exams Scheduled for Wk of 860602.Matl Listed in Encl Ref Matl Requirements for Operator/Senior Operator Licensing Exams Requested by 860411
ML20137U579
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/13/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8602190257
Download: ML20137U579 (5)


Text

, '.

P 13 EE Docket No. 50-373 Docket No. 50-374 Conr.onwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690

Dear Mr. Reed:

SUBJECT:

OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. S. Harmon, Training Instructor, and Mr. J. I. McMillen, Section Chief, arrangenents were made for the administration of examinations at the LaSalle Nuclear Power Station.

The written and oral examinations are scheduled for the week of June 2,1986.

In order for us to meet this schedule, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1 " Reference Material Requirements for Operator / Senior Operator Licensing Examinations" by April. 11, 1986. Any delay in receiving this material will result in a delay in administering the examinations. Our examinations are scheduled far in advance e'th considerable planning to best utilize our limited examiner manpower and to meet the examination dates requested by the various facilities.

Therefore, missing the April 11, 1986, deadline, even by a few days, will likely result in a long delay since it may not be possible to reschedule examinations at other facilities. Mr. Harmon has been advised of our reference material requirements, the number of reference material sets that are required,

'and the examiners' names and addresses where each set is to be mailed.

The facility managenent is responsible for providing adequate space and facilities in order to properly conduct the written examinations. Enclosure 2,

" Administration of Operator / Senior Operator Licensing Written Examinations,"

describes our requirements 'for conducting these examinations. Mr. Harmon has also been informed of these requirements.

All operator and senior license applications.should normally be submitted at least 60 days prior to the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after candidate eligibility has-been determined. If the applications are not received at least 30-days prior to the examination dates it is likely that a postponement will be necessary.

8602190257 860213 -

hDR ADOCM 05000373 PDR fY l

~

Constonwealth Edison Company 2 FEB la pg3 This request for information was approved by the Office of Management and Budget .under Clearance Number.3150-0101, which expires June 30, 1986.

Concents on burden and duplication may be directed to the Office of Management and Budget, Reports Managenent Room 3208, New Executive Office Building, Washington, D.C. 20503.

Thank~you for your consideration in this matter.. If you have any questions regarding the examination procedures and requirennnts. please contact J. I. McMillen at 312-790-5559.

Sincerely, ORIGINAL SIGNED BY LUIS A. REYES Luis A. Reyes, Chief Operations Branch

Enclosures:

1. Reference Material Requirements for' 0perator/ Senior Operator

-Licensing Examination

2. Administration of .0perator Licensing Written Examinations cc w/enclosu'res:

D. L. Farrar, Director

.of Nuclear Licensing G. J. Diederich, Plant Manager R. Crawford, Plant Training Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Control Division cc w/o enclosures:

A. Bournia Project Manager, NRR

' B. Boger, Branch Chief, OLB RIII i 1 Ab i

MM le /mab Reyes 0 /13/86

ENCLOSURE 1 Reference Material Requirements for Operator / Senior Operator Licensing Examinations Note: Reguj, red Material is indicated _by_an "X" opposite the item.

_X_ 1. Procedure Index (alphabetical by subject)

X 2. All administrative Procedures (as applicable to reactor operation orsafety)

X 3. All Integrated Plant Procedures (Normal or General Operating Procedures)

_X_ 4. Emergency Procedures (Emergency Instructions, Abnormal or Special Procedures)

X 5. Stand!r.g Orders (Important orders which are safety related and may supersede the regular procedures)

X 6. Fuel Handling and Core Loading Procedures, (Initial Core Loading Procedure, when appropriate)

X 7. Annunciator Procedures (alarm proceaures, including set points)

_X_ 8. Radiation Protection Manual (Radiation Control Manual or Procedures)

X 9. Emergency Plan Implementing Procedures

_X _ 10. Technical Specifications X 11. Lesson Plans (Training Manuals, Plant Orientation Manual, System Descriptions, Reactor Theory, Thermodynamics, etc.)

_X _ 12. System Operating Procedures X 13. Piping and Inst unentation Diagrams, electrical single line diagrams, or flow diagrams

_X_ 14. Technical Data Book, and/or plant curve infonnation as used by operators X 15. Questions and Answers that Licensee has prepared (Voluntary by Licensee)

~X- 16. Malfunction and Initial Condition Material for Simulator (if applicable)

et O 2

- All of the above reference material should be approved, final issues, and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable except for cold license examinations.. All procedures and reference material should be bound or in the form as used by the control toom operators, with appropriate indexes or tables oj[ contents so that they can be used efficiently.

If a cold-license plant has not finalized some of .the material, the chief examiner is responsible for ensuring that the most complete, up-to-date material is available and that agreement has been reached with the licensee for-limiting changes before the administration of the examination.

f t

l l

4 O

'-'*r- * * ~ - - r t- , - ~ , - - - , , _

.. .o ENCLOSURE 2 Administration of Reactor / Senior Reactor Operator Licensing Written Examinations Operator Licensing Branch requirements are:

1. A single room shall be provided for completing the written examination.

The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor personnel during the duration of.the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.

2. Minimum spacing is required to ensure exam integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with 3 foot spacing between tables. No wall charts, models, and/or other training materials shall be present in the examination room.
3. Suitable arrangements are to be made by the facility if the cadidates are to have lunch, coffee, etc. These arrangements shall comply eith Item 1 above. These arrangements will be reviewed by the examiner and/or proctor.
4. A copy of the written examination and answer key shall be given to the utility training department after the last candidate has turned in his completed examination. The utility will then have until the end of the exam week to provide comments and supporting documentation to suggest changes or corrections to the examination and answer key. The utility may provide these comments in writing to the Chief Examiner before he leaves the site or forward them to the Operator Licensing Section Chief in the appropriate regional office.
5. The licensee will provide pads of 8-1/2 x 11" lined paper in unopened packages for each candidate's use in completing the examination. The examiner will distribute these pads to the candidates. All reference material needed to complete the examination will be furnished by the examiner. Candidates can bring pens, pencils, calculators or slide rules into the examination room and no other equipment or reference material is allowed.
6. Only black ink or dark pencils should be used for writing answers to questions.