ML20137U403

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1985
ML20137U403
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/30/1985
From: Richardson M, Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-34256-EEVB, NUDOCS 8602190168
Download: ML20137U403 (6)


Text

.,

NRC MONTHLY OPERATING REPORT DOCKET NO.

50:52Q UNIT NAME PyNGS1 DATE 12/0Z/85 COMPLETED BY M P Richardgon t t TELEPHONE 602:932:5300 Exit 6523 OPER911NQ SIBIUS 1.

Unit Name: Palg ygtdg Nucigar Ggggrating @tatign Unit 1 t

2.

Raporting Period :Ngvgrnbgt 19Q5 3.

Licensed Thermal Power (MWt): 3@00 4.

Nameplate Rating (Gross MWe): 1304 5.

Design Electrical Rating (Net MWe): 12ZO 6.

Maximum Dependable Capacity (Gross MWe):Tg bg dgtgemingd 7.

Maximum Dependable Capacity (Net MWe):

Tg bg dgtgrmingd 8.

If Changes Occar In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:__________________

______________________Nf8________________________________

9.

Power Level To Which Restricted, If Any (Net MWe): _NONE____

10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period

_ _ _7 2 0_ _ _ _

___4154___

__8016____

12. Number Of Hours Reactor Was Critical

_____3.5__

___1843.2_

__1843.2__

13. Reactor Reserve Shutdown Hours 0

0 0

14.

Hours Generator On-Line

_____0____

__1554.5__

_1554.5__

15. Unit Reserve Shutdown Hours

_____0____

_____0____

____0____

16. Gross Thermal Energy Generated

___194____

2,933,460_

2,933,460_

(MWH)

17. Gross Electrical Energy Generated

_____0____

_858,100__

_858,100_

(MWH)

18. Net Electrical Energy Generated 0

_696,869__

_696,869_

(MWH)

19. Unit Service Factor

___N/A____

___N/A____

__N/A____

20. Unit Availability Factor

___A/A____

___N/A____

__N/A____

21. Unit Capacity Factor (Using MDC

___N/A____

___N/A____

__N/A____

Net)

22. Unit Capacity Factor (Using DER

___N/A____

___N/A____

__N/A____

i Net)

23. Unit Forced Outage Rate

___N/A____

___N/A____

__N/A____

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): __Eutvg111ance Tent Outage : 3/86 49 dayn______

t 25.

If Shutdown At End Of Report Period. Est: mated Date of Startup ______

26. Unitb~In~ Tent ~

~

Status (Prior To Commercial Ooeration):

Forecast Achieved INITIAL CRITICALITY

___5/85_____

___5/25/85___

INITIAL ELECTRICITY

___6/85_____

___6/10/85___

COMMERCIAL OPERATION

__11/85_____

_____N/A 8602190168 851130 jC65)N PDR ADOCK 05000528 fljj R

PDR

4

. AVERAGE DAILY. UNIT POWER LEVEL DOCKET NO.

5_ 0_ _- 5 2 8----------

UNIT--_---_PVNGS_ _1_-_---__

DATE---

12/07/85 COMPLETED BY_d._P

-_ichardson R -_------

t TELEPHONE ------ 4-5300 602-93~

_E 1t @g93_____

3


MONTH:

November 1985 DAY AVERAGE DAILY P WER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1

.------____0__------_------

17 _-------_- 0 2

0 18 0

3 0

19 0

4 20 0

0 5

0 21 0

6 0

22 0

7 0

2'3 0

8


__0 24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 ---_-_-_--_0 --------------

14 0

30 0

15 __-----_-_0 ----_--_----_--

16 _------_- 0 ---_--------_--

SUMM98Y 9E DEEBBIIN@ Ef2EBIENCE EQB IHg MQNIS DOCKET NO.___50-5g@___________

UNIT _________EyNQS-1___

DATE_________1gf0Zfg5____

COMPLETED BY_MsEt Bigbardsgo__

TELEPHONE __60g-932-5300_______

__ gut.

6523__________

11/01/85 - 0000 - Plant in Mode 5 oue tv Reactor trip on 10/24/85.'

11/25/85 - 2026 - Entered Mode 4.

11/29/85 - 1705 - Entered Mode 3.

11/30/85 - 2035 - Reactor is critical, entered Mode 2.

t l

i

' UNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET No.

9na9 A i

UNIT NAME RVRIN

,L_

t DATE 2 'I ' 3 / o)

/*

COMPLETED BY N.V.

R i c h a rd <:nn TELEPHONE - Q U-5100 rye A503 i

Method or Shutting Down System Component Cause & Corrective 1

Duration 2

3 1.ER 4

5 Action to j

No.

Date Type

( flou rs )

Reason Reactor No.

Code Code Prevent Recurrence None - Plant shutdown from Reactor trip on 10/24/85.

I

'i a

4 i

a

{

1 2

3 la F-Fo rced Reason:

Method:

Exhibit r - Instructions S-Scheduled A-[Quipment re f luro (Explain) 1-Hanual for Prnparation of Data D-Maintenance or Test 2-Manua l Scram.

Entry Shcots for Licensee C-Rcrueling 3-Automa tic Scram.

Event Report (LER) File i

D-Regula tory Rest riction 4-Continuation from-(NUREC 0161)

  • y E-onnrator Training & License Examination Prnvious Month F-Administrativn 5-neduct son or 20%

5 C-Ope ra t iona l Error (Explain) or Creator in the Exhibit H-Samo Source H-Other (Expiqin)

Pas t 2's flours 6 0 thor (Explain) pohnee

T s

-REFUELING INFORMATION DOCKET NO._50:548__________

UNIT _______PMNGS1_____

DATE_______12LOZL85_____

COMPLETED BY_M.p._ Righardsgn TELEPHONE __602:232:5300____

__Egt._ 6523_______

1.

Scheduled date for next refueling shutdown.

03/01/87 2.

Scheduled date for restart following refueling.

04/19/87 i

3.

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not-Yet Determined What will these be?

Not Yet Determined 4.

Scheduled date for submitting proposed licensing action and supporting information.

Not Yet Determined 5.

Important Licensing considerations associated with refueling,

e. g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in i-fuel design, new operating procedures.

Not Yet Determined l

6.

The number of fuel assemblies.

a) In the core._@&1 b) In the spent fuel storage pool._____0_______

1 7.

Licensed spent fuel storage capacity.____1322______

Intended change in spent fuel storage capacity.__bgDg______

i 8.

Projected date of last refueling that can be discharged to 4

spent fuel storage pool assuming present capacity.

2002 (w/ annual reloads and full core discharge capability).

T Arizona Nuclear Power Project P O BOX 52034

  • PHOENIX, art 20NA 85072 2034 December 16, 1985 ANPP -34256 EEVB/GEC/98.06 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528, License No. NPF-41 November Monthly Operating Report File: 85-024-404

Dear Mr. Scroggins:

Attached please find the November,1985, Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifica-tions) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License.

By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me.

Very truly yo

{

ht n LLL E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/GEC/ds Attachments cc:

J. B. Martin (all w/a)

R. P. 7.immerman E. A. Licitra A. C. Gehr INPO Records Center

' 1 L