NRC MONTHLY OPERATING REPORT DOCKET NO.
50:52Q UNIT NAME PyNGS1 DATE 12/0Z/85 COMPLETED BY M P Richardgon t t TELEPHONE 602:932:5300 Exit 6523 OPER911NQ SIBIUS 1.
Unit Name: Palg ygtdg Nucigar Ggggrating @tatign Unit 1 t
2.
Raporting Period :Ngvgrnbgt 19Q5 3.
Licensed Thermal Power (MWt): 3@00 4.
Nameplate Rating (Gross MWe): 1304 5.
Design Electrical Rating (Net MWe): 12ZO 6.
Maximum Dependable Capacity (Gross MWe):Tg bg dgtgemingd 7.
Maximum Dependable Capacity (Net MWe):
Tg bg dgtgrmingd 8.
If Changes Occar In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:__________________
______________________Nf8________________________________
9.
Power Level To Which Restricted, If Any (Net MWe): _NONE____
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
_ _ _7 2 0_ _ _ _
___4154___
__8016____
- 12. Number Of Hours Reactor Was Critical
_____3.5__
___1843.2_
__1843.2__
- 13. Reactor Reserve Shutdown Hours 0
0 0
14.
Hours Generator On-Line
_____0____
__1554.5__
_1554.5__
- 15. Unit Reserve Shutdown Hours
_____0____
_____0____
____0____
- 16. Gross Thermal Energy Generated
___194____
2,933,460_
2,933,460_
(MWH)
- 17. Gross Electrical Energy Generated
_____0____
_858,100__
_858,100_
(MWH)
- 18. Net Electrical Energy Generated 0
_696,869__
_696,869_
(MWH)
- 19. Unit Service Factor
___N/A____
___N/A____
__N/A____
- 20. Unit Availability Factor
___A/A____
___N/A____
__N/A____
- 21. Unit Capacity Factor (Using MDC
___N/A____
___N/A____
__N/A____
Net)
- 22. Unit Capacity Factor (Using DER
___N/A____
___N/A____
__N/A____
i Net)
- 23. Unit Forced Outage Rate
___N/A____
___N/A____
__N/A____
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): __Eutvg111ance Tent Outage : 3/86 49 dayn______
t 25.
If Shutdown At End Of Report Period. Est: mated Date of Startup ______
- 26. Unitb~In~ Tent ~
~
Status (Prior To Commercial Ooeration):
Forecast Achieved INITIAL CRITICALITY
___5/85_____
___5/25/85___
INITIAL ELECTRICITY
___6/85_____
___6/10/85___
COMMERCIAL OPERATION
__11/85_____
_____N/A 8602190168 851130 jC65)N PDR ADOCK 05000528 fljj R
4
. AVERAGE DAILY. UNIT POWER LEVEL DOCKET NO.
5_ 0_ _- 5 2 8----------
UNIT--_---_PVNGS_ _1_-_---__
DATE---
12/07/85 COMPLETED BY_d._P
-_ichardson R -_------
t TELEPHONE ------ 4-5300 602-93~
_E 1t @g93_____
3
MONTH:
November 1985 DAY AVERAGE DAILY P WER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
.------____0__------_------
17 _-------_- 0 2
0 18 0
3 0
19 0
4 20 0
0 5
0 21 0
6 0
22 0
7 0
2'3 0
8
__0 24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 ---_-_-_--_0 --------------
14 0
30 0
15 __-----_-_0 ----_--_----_--
16 _------_- 0 ---_--------_--
SUMM98Y 9E DEEBBIIN@ Ef2EBIENCE EQB IHg MQNIS DOCKET NO.___50-5g@___________
UNIT _________EyNQS-1___
DATE_________1gf0Zfg5____
COMPLETED BY_MsEt Bigbardsgo__
TELEPHONE __60g-932-5300_______
__ gut.
6523__________
11/01/85 - 0000 - Plant in Mode 5 oue tv Reactor trip on 10/24/85.'
11/25/85 - 2026 - Entered Mode 4.
11/29/85 - 1705 - Entered Mode 3.
11/30/85 - 2035 - Reactor is critical, entered Mode 2.
t l
i
' UNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET No.
9na9 A i
UNIT NAME RVRIN
,L_
t DATE 2 'I ' 3 / o)
/*
COMPLETED BY N.V.
R i c h a rd <:nn TELEPHONE - Q U-5100 rye A503 i
Method or Shutting Down System Component Cause & Corrective 1
Duration 2
3 1.ER 4
5 Action to j
No.
Date Type
( flou rs )
Reason Reactor No.
Code Code Prevent Recurrence None - Plant shutdown from Reactor trip on 10/24/85.
I
'i a
4 i
a
{
1 2
3 la F-Fo rced Reason:
Method:
Exhibit r - Instructions S-Scheduled A-[Quipment re f luro (Explain) 1-Hanual for Prnparation of Data D-Maintenance or Test 2-Manua l Scram.
Entry Shcots for Licensee C-Rcrueling 3-Automa tic Scram.
Event Report (LER) File i
D-Regula tory Rest riction 4-Continuation from-(NUREC 0161)
- y E-onnrator Training & License Examination Prnvious Month F-Administrativn 5-neduct son or 20%
5 C-Ope ra t iona l Error (Explain) or Creator in the Exhibit H-Samo Source H-Other (Expiqin)
Pas t 2's flours 6 0 thor (Explain) pohnee
T s
-REFUELING INFORMATION DOCKET NO._50:548__________
UNIT _______PMNGS1_____
DATE_______12LOZL85_____
COMPLETED BY_M.p._ Righardsgn TELEPHONE __602:232:5300____
__Egt._ 6523_______
1.
Scheduled date for next refueling shutdown.
03/01/87 2.
Scheduled date for restart following refueling.
04/19/87 i
3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not-Yet Determined What will these be?
Not Yet Determined 4.
Scheduled date for submitting proposed licensing action and supporting information.
Not Yet Determined 5.
Important Licensing considerations associated with refueling,
- e. g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in i-fuel design, new operating procedures.
Not Yet Determined l
6.
The number of fuel assemblies.
a) In the core._@&1 b) In the spent fuel storage pool._____0_______
1 7.
Licensed spent fuel storage capacity.____1322______
Intended change in spent fuel storage capacity.__bgDg______
i 8.
Projected date of last refueling that can be discharged to 4
spent fuel storage pool assuming present capacity.
2002 (w/ annual reloads and full core discharge capability).
T Arizona Nuclear Power Project P O BOX 52034
- PHOENIX, art 20NA 85072 2034 December 16, 1985 ANPP -34256 EEVB/GEC/98.06 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN 50-528, License No. NPF-41 November Monthly Operating Report File: 85-024-404
Dear Mr. Scroggins:
Attached please find the November,1985, Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifica-tions) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License.
By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.
If you have any questions, please contact me.
Very truly yo
{
ht n LLL E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/GEC/ds Attachments cc:
J. B. Martin (all w/a)
R. P. 7.immerman E. A. Licitra A. C. Gehr INPO Records Center