ML20137U343
| ML20137U343 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/13/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Leddick R LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20137U347 | List: |
| References | |
| NUDOCS 8602190139 | |
| Download: ML20137U343 (2) | |
See also: IR 05000382/1985029
Text
.
.
.
.
.
~
.
~~
FEB I 3 G85
In Reply Refer To:
Docket: 50-382/85-29
Louisiana Power & Light Company
ATTN:
R. S. Leddick, Sr. Vice President
Nuclear Operations
142 Delr.ronde Street
.
New Or!ieans, Louisiana 70174
Gentlemen:
f
This refers to the physical security inspection conducted by Mr. J. A. F Kelly
.and Mr. A. B. Earnest of this office during the period October 15-18, 1985, of
activities authorized by NRC Operating License NPF-38 for Waterford-3 Steam
Electric Station and to the discussion of our findings with Mr. R. S. Leddick
and other members of your staff at the conclusion of the inspection.
.
Areas inspected during the inspection included personnel training and
qualifications, safeguards contingency activities, testing and maintenance,
<
security system power supply, management effectiveness, allegation followup,
access control, security organization, lock and key control, physical
,
barriers protected and vital areas, detection aids protected and vital areas,
'
assessment aids,-and alarm stations.
The material enclosed herewith contains Safeguard Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
,
'
-by Section 147 of the Atomic Energy Act of 1954, as amended. .Therefore, the
material, with the exception of the report. cover page which is an inspection
summary, will not be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
"
discuss them with you.
Sincerely,
pW S@d T
.
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
Appendix - NRC Inspection Report
50-382/85-29
cc w/ summary page only:
(see next page)
b
C
R
EP&SPS
E $PS
C:EPS
C:
- RP *
RPB
,
JAKelly/lw
ABEarnest
LYandell
R
'"h
JGa 11<
o
p g /85
/6/ td85
g /n /86 dg /35
i,/11/85
p/ /
'
C r>aNo
L-
resosum:cTinIm
b
h'
B602190139 860213
g . g 3 1 77; g y ,7 c:r,
UPCR 5%1TITI DIIS
\\\\
Pl.OZ IS LOUJfELLC).
,
w
--
- - - - - -
-
- - -
. - -
. -
. - - -
.
- .
- -
.
. . .
.
- . .
- - - - -
,
.
Louisiana Power & Light Company
-2-
cc w/ summary page only:
Louisiana Power & Light Company
ATTN:
G. E. Wuller, Onsite
Licensing Coordinator
P. O. Box B
Killona, Louisiana
70066
Louisiana Power & Light Company
ATTN:
R. P. Barkhurst, Plant Manager
P. O. Box B
Killona, Louisiana
70066
Middle South Services
ATTN:
Mr. R. T. Lally
P. 0. Box 61000
.
New Orleans, Louisiana
70161
Louisiana Power & Light Company
ATTN:
K. W. Cook, Nuclear Support
and Licensing Manager
142 Delaronde Street
New Orleans, Louisiana
70174'
Louisiana Radiation Control Program Director
bec:
Copy of entire report maintained in RIV Security File and sent to:
G. McCorkle, NMSS
SSPB/NRC:NRR
IE File
Resident Inspector (Ops Only) (w/766)
R. Martin
Security Inspectors
Chief, EPSPS
bec: RIV - Letter and Inspection Summary only w/766:
RPB
D. Weiss, LFMB (AR-2015)
MIS
.
RIV File
Section Chief, RPS/C
RSTS Operator
R&SPB
pcc: RIV - Letter and Inspection Summary only w/out 766:
vDMB - IE04
". Bangart
E. H. Johnson, DRS&P
D. Crutchfield, NRR
'
L-
,