ML20137T480

From kanterella
Jump to navigation Jump to search
Discusses Insp 50-458/97-06 on 970202-0315 & Forwards Notice of Violation.Violation of Concern Because Programmatic Controls for Ensuring Personnel Did Not Work Exessive Hours Not Established as Required by TS
ML20137T480
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/11/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
Shared Package
ML20137T485 List:
References
NUDOCS 9704160103
Download: ML20137T480 (5)


See also: IR 05000458/1997006

Text

. . . _ - . - . - . . . - - , . . . , _ . - - _- , ~ . . . - .

e

  • ,p*"4g UNITED ST ATES

,"$

t g ;

%q NUCLEAR REGULATORY COMMISSION

  • . .% i REGloN IV

A '

e

$ . ' pW

'( ..... w[

611 RY AN PLAZA DRIVE. SUITE 400 )

AR LINGToN, TEX AS 76011-8064

l

,

APR I i 1997  !

i

John R. McGaha, Vice President - Operations I

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

l

SUBJECT: NRC INSPECTION Report 50-458/97-006 AND NOTICE OF VIOLATION

Dear Mr. McGaha:

An NRC inspection was conducted February 2 through March 15,1997, at your River Bend

Station facility. The enclosed report presents the scope and results of that inspection.  !

During the 6-week period covered by this inspection period, your conduct of activities at

the River Bend Station facility was generally characterized by safety-conscious' operations,

sound engineering and maintenance practices, and good radiation protection support. We

l

are concerned, however, about three violations of NRC requirements that were identified.  !

i

The first violation is of concern because programmatic controls for ensuring personnel did l

not work excessive hours were not established and implemented as required by the l

Technical Specifications. The second violation is of concern because inadequacies and i

ambiguities in your performance-based incal leak rate terting program resulteri in  ;

safety-related systems being taken out of service unnecessarily during power operation to l

accomplish testing that, in actuality, was not needed. Your staff should have recognized

and corrected this program weakness within a reasonable amount of time after the

January 1996 refueling outage, when a first group of potentially missed surveillances was

identified. The third violation is of concern because on two occasions unauthorized

personnel relocated radiological postings despite specific training to the contrary.

These violations are cited in the enclosed Notice of Violation (Notice) and the

circumstances surrounding the violations are described in detail in the enclosed report.

Please note that you are required to respond to this letter and should follow the

instructions specified in the enclosed Notice when preparing your response. The NRC will

use your response, in part, to determine whether funhcr enforcement action is necessary

to ensure compliance with regulatory requirements,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy Of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR). To the extent possible, your response should not include any personal privacy,

proprietary, or safeguards information so that it can be placed in the PDR without

redaction,

j

\

"

9704160103 970411

PDR ADOCK 05000458 $gg*ggggggggggggg

.,..... .-

G PDR

'

a

.

Entergy Operations, Inc. -2-

l

l

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.  ;

1

Sincerely, l

/'

, .-

Tho as P. G , ctor

Division of Reactor Projects

Docket No.: 50-458

License No.: NPF-47

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-458/97-006

i

cc w/ enclosures:

Executive Vice President and

Chief Operating Officer l

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995 l

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

i

l

General Manager

Plant Operations

River Bend Station

Entergy Operations, Inc. ,

P.O. Box 220 l

St. Francisville, Louisiana 70775

Director - Nuclear Safety

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

_, . _. _ . . _ .. . . _ . _ _ _ . - . . - - _ _ . _ . _ _ _ - . . _ . _ . _ _ . _ . - . . _ - . _

', .

s'

i

..

,

Entergy Operations, Inc. -3-

{

i

~ Wise, Carter, Child & Caraway

-

P.O. Box 651

Jackson, Mississippi 39205

i ,

'

Mark J. Wetterhahn, Esq.

j Winston & Strawn

1401 L Street, N.W. ,

l Washington, D.C. 20005-3502 l

,

Manager - Licensing

l River Bend Station  ;

l Entergy Operations, Inc. '

! P.O. Box 220 ,

-

,

. St. Francisville,- Louisiana 70775 i

The Honorable Richard P. leyoub
Attorney General

.P.O. Box 94095

'

1

Baton Rouge, Louisiana 70804-9095

1

4

H. Anne Plettinger

]. 3456 Villa Rose Drive  !

Baton Rouge, Louisiana 70806 '

i I

President of West Feliciana  !

Police Jury  !

P.O. Box 1921

St. Francisville, Louisiana 70775

I

Larry G. Johnson, Director

Systems Engineering

< Cajun Electric Power Coop. Inc.

10719 Airline Highway

P.O. Box 15540

Baton Rouge, Louisiana 70895  !

1

, William H. Spell. Administrator

^

' Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

-

b

4

, APR I i 1997

Entergy Operations, Inc. -5- '

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to D. Taylor (DRT) F

E-Mail report to R. Correia (RPC)  ;

l

bec to DCD (IE01)

bec distrib. by RIV: )

Regional Administrator Senior Resident inspector (Grand Gulf) l

DRP Director DRS-PSB

Branch Chief (DRP/D) MIS System

Project Engineer (DRP/D) RIV File

Branch Chief (DRP/TSS)

Resident inspector

i

DOCUMENT NA E:  :\ RB\RB706RP.WFS

To receive copy of doq y . irdcote Qxi "C"h Copy without enclosyres "E" = Copy with enclosures "N" = No copy

SRI A 6T C:DRP/Q g fD:DRP , d,

WFS/nith,%Yr PHH M J' TPGwynn g

03/$5/97$'y g 04/ p(7 04/ g /97G

( ' OFFICIAL RECORD' COPY l

i

. . .. _ .~ ..- - - - _ _ _ - . . . . . _ - . - . . . - - - - . . _ . - - . - - -.

i

a

.- APR I i 1997

Entergy Operations, Inc. -5-

4

4

i E-Mail report to T. Boyce (THB) )

E Mail report to NRR Event Tracking System (IPAS) )

4 E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to D. Taylor (DRT) 1

i E-Mail report to R. Correia (RPC) ,

!

bec to DCD (IE01) j

bec distrib. by RIV:

. Regional Administrator Senior Resident inspector (Grand Gulf)

j DRP Director DRS-PSB

Branch Chief (DRP/D) MIS System

Project Engineer (DRP/D) RIV File

'

Branch Chief (DRP/TSS)

Resident inspector

E

k

l

i

l

,

l

l

DOCUMENT NA E:  :\ RB\RB706RP.WFS

To receive copy of dog p . in[cete Qu: "C"h Copy without enclosyres "E" = Copy with enclosures "N" = No copy

SRI A M C:DRP/Q & fD:DRP , d,

WFS/nithMYf PHHpq f TPGwynnlg

03/25/97KVA 04/ 'M(7 04/ g /97Q

f (' 'OFFIC:AL RECORD' COPY

_ __