ML20137T113
| ML20137T113 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/05/1986 |
| From: | Rogers T, Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20137T102 | List: |
| References | |
| 50-400-OL-86-01, 50-400-OL-86-1, NUDOCS 8602180187 | |
| Download: ML20137T113 (4) | |
Text
..
I l
l r
ENCLOSURE 1 EXAMINATION REPORT 400/86-01 Facility Licensee: Carolina Power and Light Company P. O. Box 1551 N
Raleigh, NC 27602 Facility Name: Shearon Harris Nuclear Power Plant Facility Docket No.: 50-400 A simulator examination was administered at the Shearon Harris Energy and Environmental Center near New 11, North Carolina.
Chief Examiner:
2[r[d w
Thomas Rogers Date Signed C
z/5/M Approved by:
u Bruce A. Wilsfm, Spion Chief Date Signed Summary:
An instructor certification simulator retake examination was administered to one candidate on January 22, 1986. The candidate passed.
V
7 r
ENCLOSURE 1 EXAMINATION REPORT 400/86-01 Facility Licensee: Carolina Power and Light Company P. O. Box 1551 Raleigh, NC 27602 Facility Name: Shearon Harris Nuclear Power Plant Facility Docket No.: 50-400 A simulator examination was administered at the Shearon Harris Energy and h
Environmental Center near New Hill, North Carolina.
Chief Examiner:
Thomas Rogers Date Signed Approved by:
Bruce A. Wilson, 5cction Chief Date Signed Summary:
An instructor certification simulator. retake examination was administered to one candidate on January 22, 1986. The candidate passed.
I..g. i i... -. _...
REPORT DETAILS 1.
Facility Employees Contacted:
- Geise, W., Project Specialist
- 0lexic, C., Director of Nuclear and Simulator Training
- Tollison, A., Manager - Nuclear Training
- Atterded Exit Meeting 2.
Examiners:
Nelson, D., USNRC
- Rogers, T., USNRC.
- Chief Examiner 3.
Exit Meeting At-the conclusion of the site visit, the examiners met with representatives of the plant staff to discuss the results of the examination.
The cooperation given to the examiners was also noted and appreciated.
l l
P
' REPORT DETAILS 1.
Facility Employees Contacted:
- Geise, W., Project Specialist
- 0lexic, C.,- Director of Nuclear and Simulator Training
- Tollison, A., Manager - Nuclear Training
- Attended Exit Meeting 2.
Examiners:
Nelson, D.,
- Rogers, T., USNRC
- Chief Examiner 3.
Exit Meeting
- At the conclusion of the site visit, the examiners met with representatives of the plant staff to discuss the results of the examination.
The cooperation given to the examiners was also noted and appreciated.
,