Exam Rept 50-400/OL-86-01 on 860122.Exam Results:One Candidate Passed Instructor Certification Simulator Retake Exam
ML20137T113
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/05/1986
From: Rogers T, Wilson B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20137T102 List:
References
50-400-OL-86-01, 50-400-OL-86-1, NUDOCS 8602180187
Download: ML20137T113 (4)


Text

..

I l

l r

ENCLOSURE 1 EXAMINATION REPORT 400/86-01 Facility Licensee: Carolina Power and Light Company P. O. Box 1551 N

Raleigh, NC 27602 Facility Name: Shearon Harris Nuclear Power Plant Facility Docket No.: 50-400 A simulator examination was administered at the Shearon Harris Energy and Environmental Center near New 11, North Carolina.

Chief Examiner:

2[r[d w

Thomas Rogers Date Signed C

z/5/M Approved by:

u Bruce A. Wilsfm, Spion Chief Date Signed Summary:

An instructor certification simulator retake examination was administered to one candidate on January 22, 1986. The candidate passed.

V

7 r

ENCLOSURE 1 EXAMINATION REPORT 400/86-01 Facility Licensee: Carolina Power and Light Company P. O. Box 1551 Raleigh, NC 27602 Facility Name: Shearon Harris Nuclear Power Plant Facility Docket No.: 50-400 A simulator examination was administered at the Shearon Harris Energy and h

Environmental Center near New Hill, North Carolina.

Chief Examiner:

Thomas Rogers Date Signed Approved by:

Bruce A. Wilson, 5cction Chief Date Signed Summary:

An instructor certification simulator. retake examination was administered to one candidate on January 22, 1986. The candidate passed.

I..g. i i... -. _...

REPORT DETAILS 1.

Facility Employees Contacted:

  • Geise, W., Project Specialist
  • 0lexic, C., Director of Nuclear and Simulator Training
  • Tollison, A., Manager - Nuclear Training
  • Atterded Exit Meeting 2.

Examiners:

Nelson, D., USNRC

  • Chief Examiner 3.

Exit Meeting At-the conclusion of the site visit, the examiners met with representatives of the plant staff to discuss the results of the examination.

The cooperation given to the examiners was also noted and appreciated.

l l

P

' REPORT DETAILS 1.

Facility Employees Contacted:

  • Geise, W., Project Specialist
  • 0lexic, C.,- Director of Nuclear and Simulator Training
  • Tollison, A., Manager - Nuclear Training
  • Attended Exit Meeting 2.

Examiners:

Nelson, D.,

USNRC

  • Chief Examiner 3.

Exit Meeting

- At the conclusion of the site visit, the examiners met with representatives of the plant staff to discuss the results of the examination.

The cooperation given to the examiners was also noted and appreciated.

,