ML20137S505

From kanterella
Jump to navigation Jump to search
Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls
ML20137S505
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/11/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hintz D
WISCONSIN PUBLIC SERVICE CORP.
References
NUDOCS 8602180066
Download: ML20137S505 (2)


Text

_

e w-FEB 1 1 1996 Docket No. 50-305 Wisconsin Public Service Corporation ATTN: Mr. D. C. Hintz Manager Nuclear Power Post Office Box 19002 Green Bay, WI 54307-9002 Gentlemen:

Enclosed is a copy of the revised NRC Form 398. This revised form requires that all information be completed in total with each new, renewal, upgrade, multi-unit, and reapplication license submittal. Applicants requesting a renewal and reapplication will also need to indicate the additional training received since the last application under Item 15. Please note that the training section will no longer be cumulative. Other changes are detailed in Enclosure 2. Enclosure 3 is a set of instructions for the completion of all items on the NRC Form 398.

Please ensure that all applications for licenses received after April 1,1986, are. submitted on this revised form. On that date, the NRC Operator Licensing Tracking System will be modified to reflect these changes, and submittals using the previous form will not be accepted.

Additional copies of the form can be obtained from Vivian Miller, U. S. Nuclear Regulatory Commission, Document kanagement Branch, Mail Stop W-548, Washington, DC 20555.

A meeting will be held with all Reg!on III licensees in late March or early April to discuss this and other operator licensing matters. You will be notified of the details of this meeting at a later date.

If you have any questions regarding these changes, please call our office.

ORIGINAL SIGNED BY LUIS A. REYES B602180066 e60211 (DR ADOCK O g5 Luis A. Reyes, Chief Operations Branch

Enclosures:

As stated See Attached Distribution RIII RIII RIII l

) orthy/mab cMlHen e es/

02/11/86 Ol #

h 5 $6 Y$ 40

a l

(L .

Wisconsin Public Service 2 Corporation - FEB 11.1996

. Distribution -

cc w/ enclosures:

F. Stanaszak, Training Department cc w/o enclosures:

C. R. Steinhardt, Plant Manager-DCS/RSB(RIDS)

Licensing Fee Management Branch Resident Inspector, RIII.

John J. Duffy, Chief Boiler Section l'

Ness Flores, Chairperson Wisconsin Public Service Commission

. - _ .