ML20137S491

From kanterella
Jump to navigation Jump to search
Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls
ML20137S491
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/11/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Agosti F
DETROIT EDISON CO.
References
NUDOCS 8602180062
Download: ML20137S491 (2)


Text

_

g-

..e

?EB11 y Docket No. 50-341 The-Detroit Edison Company ATTN: Frank E. Agosti Vice President Nuclear Operations 6400 North Dixie Highway

= Newport, MI 48166 Gentlemen:

Enclosed is a copy of the revised NRC Form 398. This revised fc,rm requires that all infonnation be completed in total with each new, renewal, upgrade, multi-unit, and reapplication license submittal. Applicants requesting a renewal and reapplication will also need to indicate the additional training received since the last application under Item 15. Please note that the

-training section will no longer be cumulative. Other changes are detailed in. is a set of instructions for the c<mpletion of all items on the NRC Form 398.

Please ensure that all applications for licenses received after April 1,1986,-

are submitted on this revised form. On that date, the NRC Operator Licensing

' Tracking System will be modified to reflect these changes, and submittals using the previous form will not be accepted.

Additional copies of the form can be obtained from Vivian Miller, U. S. Nuclear Regulatory Commission, Document Management Branch, Mail Stop W-U.S Washington, DC 20555.

A meeting will be held with all Region III licensees in late March or early April to discuss this and other operator licensing 4tters. You will be notified of the details of this meeting at a later date.

If you have any questions regarding these changes, please call our office.

8602100062 e 11 ORIGINAL SIGNED BY LUIS A. REYES PDR ADOCM O 341 Y

PDR Luis A. Reyes, Chief Operations Branch

Enclosures:

As stated See Attached Distribution RIII RIII RI D

Roxworthy/mab qPillen

/Reye 02/10/86 J B 0

56VA

a o

u.,

NEI l g,g The. Detroit Edison Company 2

Distribution cc w/ enclosures:-

J. Coleman, Training Department-cc w/o~ enclosures:

L. P. Bregni, Licensing Engineer

~P. A. Marquardt, Corporate Legal Department

.DCS/RSB(RIDS)

Licensing Fee Management Branch Resident Inspector, RIII-Ronald Callen, Michigan Public Service Commission Harry H. Voigt, Esq.

Nuclear Facilities and Environmental Monitoring Section Monroe County Office of Civil Preparedness

..