ML20137S477

From kanterella
Jump to navigation Jump to search
Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls
ML20137S477
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/11/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 8602180057
Download: ML20137S477 (2)


Text

(

h r

F2911 pg Docket No. 50-331 Iowa Electric Light and Power Company ATTN: Mr. Lee Liu President and Chief.

Executive Officer IE Towers P. O. Box 351

. Cedar Rapids, IA 52406 Gentlemen:

Enclosed is.a copy of the revised NRC Form 398. This revised form requires that all information be completed in total with each new, renewal, upgrade, multi-unit, and reapplication license submittal. Applicants requesting a renewal and reapplication will also need to indicate the additional training received since the last application under Item 15. Please note that the training section will no longer be cumulative. Other changes are detailed in. is a set of instructions for the completion of all items on the NRC Form 398.

Please ensure that all applications _for licenses received after April 1,1986, are submitted on this revised form.

On that date, the NRC' Operator Licensing Tracking System will be modified to reflect these changes, and submittals using the previous form will not be accepted.

Additional copies of the form can be obtained from Vivian Miller, U. S. Nuclear Regulatory Commission, Document Management Branch, H il Stop W-548, Washington, DC 20555.

A meeting will be held with all Region III licensees in late March or early April to c'iscuss this and other operator licensing natters. You will be notified of the details of this meeting at a later date.

If you have any questions regarding these changes, please call our office.

ORIGINAL SIGNED BY LUIS A. REYES 8602180057 B60211 ADOCK O5000331 PDR Luis A. Reyes, Chief PDR V

Operations Branch

Enclosures:

As stated See Attached Distribution RIII RIII RII

\\

Rox thy /mab 0 illen ye 02/11/86

)p f

f

&GW4

.~.

f,.

s s

[

Iowa Electric Light'and Power 2

f55311 I300 ~

~

Company-Distribution i

cc w/ enclosures:.

G. VanMiddlesworth,-Training Department

~

cc w/o enclosures:

D. Mineck, Plant Superintendent Nuclear DCS/RSB(RIDS)

. Licensing Fee Management Branch-Resident Inspector, RIII Thomae %uvenagle, Iowa State.

- Comerce Cuniaission 4

u h