Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls
ML20137S318
Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle, 05000000
Issue date: 02/11/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8602180026
Download: ML20137S318 (3)


Text

_ _ _ _

FEB 11 ISSS Docket Nos. 50-10; 50-237; 50-249 Docket Nos. 50-254; 50-265 Docket Nos. 50-295; 50-304 Docket Nos. 50-373; 50.374 Docket Hos. 50-454; 50 455 Docket Nos. 50-456;50-457 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL.60690 Gentlemen:

Enclosed is a copy of the revised NRC Form 398. This revised form requires that all information be completed in total with each new, renewal, upgrade, multi-unit, and reapplication license submittal. Applicants requesting a renewal and reapplication will also need to indicate the additional training received since the last application under Item 15.

Please note that the training section will no longer be cumulative. Other changes are detailed in Enclesure 2. is a set of instructions for the completion of all items on the NRC Form 398.

Please ensure that all applications for licenses received after April 1,1986, are submitted on this revised form. On that date, the NRC Operator Licensing Tracking System will be modified to reflect these changes, and submittals using the previous form will not be accepted.

Additional copies of the form can be obtained from Vivian Miller, U. S. Nuclear Regulatory Commission, Document Management Branch, Mail Stop W-548, Washington, DC 20555.

A meeting will be hald with all Region III licensees in late March or early April to discuss this and other operator licensing matters. You will be notified of the details of this meeting at a later date.

8602180026 860211

~

(DR ADOCR 05000010 PDR l

o.

Commonwealth Edison Company 2

If you have any questions regarding these changes, please call our office.

ORIGINAL SIGNED BY LUIS A. REYES Luis A. Reyes, Chief Operations Branch

Enclosures:

As stated cc w/ enclosures:

W.' McGee, Training Department, Braidwood T. Higgins, Training Department, Byron B. Zank, Training Department, Dresden R. Crawford, Training

-Department, LaSalle

' J. Neal, Training Department,

-Quad Cities M. Carnahan, Training Department, Zion cc w/o enclosures:

D. L. Farrar, Director of Nuclear Licensing M. Wallace, Project Manager

.D. Shamblin, Construction Superintendent E. E. Fitzpatrick, Station Superintendent C. W. Schroeder, Licensing and Compliance Superintendent V. I. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager D. J. Scott, Plant Manager G. J. Dicderich, Plant Manager N. Kalivianakis, Plant Manager G. J. Pliml, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch RIII' RIII.

RII bp rt y/mab 141:llen e es g

g 02/11/86 g

o... s FED 11 LTG Connonwealth Edison Company 3

Distribution (Continued) cc w/o enclosures (Continued):

Resident Inspector, RIII Braidwood Resident Ins'pector, RIII Byron Resident Inspector, RIII Dresden Resident Inspector, RIII LaSalle Resident Inspector, RIII Quad Cities-Resident Inspector, RIII Zion Phyllis Dunton, Attorney General's Office, Enviconnental

' Control Division D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public Utilities Division Diane Chevez, DAARE/ SAFE H. S. Taylor, Quality Assurance Division E. Chan, ELD Steve Lewis, ELD J. Moore, ELD G. Berry, ELD G. T. Ankrum, QAB, IE'

--Jan Norris, LPM, NRR

~L. Olshan, LPM, NRR J. Stevens, NRR The Honorable Herbert Grossman,"ASLB The Honorable A. Dixon Callihan, ASLB The Honorable Richard F. Cole, ASLB Mayor, City of Zion i

L