Forwards Insp Repts 50-348/85-40 & 50-364/85-40 on 850930-1004 & Notice of Violation
ML20137R149
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/15/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20137R153 List:
References
NUDOCS 8512050438
Download: ML20137R149 (2)


See also: IR 05000348/1985040

Text

'

E

',

-

j.

,

.:

~

November 15, 1985'

.

/ Alabama Power Company

' ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

. Birmingham, AL 35291

Gentlemen:

SUBJECT:

REPORT NOS. 50-348/85-40 AND 50-364/85-40

On September 30 - October 4,

1985, NRC inspected activities authorized by NRC

Operating License Nos. NPF-2 and NPF-8 for your Farley facility. At the conclu-

sion of the inspection, the findings were discussed with those members of your

staff identified in the enclosed inspection report.

-Areas' examined during the inspection are identified in.the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violation, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by' DMVerrelli/ for)

Roger 0. Walker, Director

Division of Reactor Projects-

Enclosures:

1.

Notice of Violation

2.

Inspection Report Nos. 50-348/85-40

and 50-364/85-40

cc w/e'ncis:

(See page 2)

851205043s 851115j

ADOCK050g38

DR

,

-

-

.

\\ b M*/

._.

-

'

_ . -

.m

. . . .

'.

,-

.,

Alabama Power Company

2-

November 15 1985

-. pc w/encis:

"W.-O. Whitt, Executive Vice President

v/ . D. Woodard, General Manager -

J

' Nuclear Plant.

. A . G. Hairston, III, General Manager -

/. Nuclear Support

.

6J. W. McGowan,~ Manage'r-Safety Audit

Y and Engineering Review'

W

G. Ware, Supervisor-Safety Audit

and Engineering Review.

1 )cc w/encis:

VNRC' Resident Inspector

vE. Reeves, Project Manager, NRR

Document Control Desk:

State of Alabama

t

.

4

-

'

=

.

al

11/65br:bhg

u

n

1

b E4erct.:

11/G/85

11/(/85

11//j 5

11//f/85

//f(/ SS

- -

-