ML20137R149
| ML20137R149 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/15/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20137R153 | List: |
| References | |
| NUDOCS 8512050438 | |
| Download: ML20137R149 (2) | |
See also: IR 05000348/1985040
Text
'
E
',
-
j.
,
.:
~
November 15, 1985'
.
/ Alabama Power Company
' ATTN: Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
. Birmingham, AL 35291
Gentlemen:
SUBJECT:
REPORT NOS. 50-348/85-40 AND 50-364/85-40
On September 30 - October 4,
1985, NRC inspected activities authorized by NRC
Operating License Nos. NPF-2 and NPF-8 for your Farley facility. At the conclu-
sion of the inspection, the findings were discussed with those members of your
staff identified in the enclosed inspection report.
-Areas' examined during the inspection are identified in.the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments. The violation, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by' DMVerrelli/ for)
Roger 0. Walker, Director
Division of Reactor Projects-
Enclosures:
1.
2.
Inspection Report Nos. 50-348/85-40
and 50-364/85-40
cc w/e'ncis:
(See page 2)
851205043s 851115j
ADOCK050g38
DR
,
-
-
.
\\ b M*/
._.
-
'
_ . -
.m
. . . .
'.
,-
.,
Alabama Power Company
2-
November 15 1985
-. pc w/encis:
"W.-O. Whitt, Executive Vice President
v/ . D. Woodard, General Manager -
J
' Nuclear Plant.
. A . G. Hairston, III, General Manager -
/. Nuclear Support
.
6J. W. McGowan,~ Manage'r-Safety Audit
Y and Engineering Review'
W
G. Ware, Supervisor-Safety Audit
and Engineering Review.
1 )cc w/encis:
VNRC' Resident Inspector
vE. Reeves, Project Manager, NRR
Document Control Desk:
State of Alabama
t
.
4
-
'
=
.
al
11/65br:bhg
u
n
1
b E4erct.:
11/G/85
11/(/85
11//j 5
11//f/85
//f(/ SS
- -
-