ML20137Q963

From kanterella
Jump to navigation Jump to search
Advises of Completion of Review of 831104 Responses to Generic Ltr 83-28,Items 3.1.1 & 3.1.2 Re post-maint Testing (Reactor Trip Sys Components).Responses Acceptable
ML20137Q963
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/19/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
References
GL-83-28, NUDOCS 8512050397
Download: ML20137Q963 (2)


Text

-

f

'b November 19, 1985 [(

Docket No. 50-285 { .

Mr. R. L. Andrews Division Manager - Nuclear Production '

Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102 e

Dear Mr. Andrews:

The Comission has completed the review of your November 4,1983 responses to Generic Letter 83-28 Items 3.1.1 and 3.1.2, Post-Maintenance Testing (Reactor Trip System Components). Item 3.1.1 deals with review of test and.

maintenance procedures and Technical Specifications. Item 3.1.2 deals with a review of vendor and engineering recommendations. In regard to Item 3.1.1, you stated that plant raintenance procedures contain provisions to test that portion of the reactor trip system on which the maintenance was performed prior to returning it to service, and the testing demonstrates that the component can perform its required function. This is acceptable. In regard to Item 3.1.2, you stated that due to vendor and engineering recomendations, ,

two new procedures and a surveillance test have been implemented. In addition, maintenance procedures have been developed to include the manufacturer's recommendations for preventative maintenance on components in the reactor protection system. This is also acceptable. ,

Based on the above, we ccnclude that your responses to the GL 83-28 Items'

! 3.1.1 and 3.1.2 are acceptable, and we consider our review for these two items l complete.

Sincerely, l

\

Edward J. Butcher, Acting Chief -

Operating Reactors Branch No. 3 Division of Licensing l

cc: See next page Distribution:

Docket File JHopkins l

NRC & L PDRs ETourigny Branch Files EButcher l OELD AThadani

[ HThompson i

ACRS 10 EJordan i PKreutzer JBess l ORB #j3:DL ORB

! PMrqutzer ;ef E ut her 85 f / l85 pg $ h l'3 185 8512050397 851119 s fDR ADOCK 05000285 PDR

y-w

'"Mr. R. L. Andrews Fort Calhoun Station 30huha' Public Power District Unit No. 1 de ,

- cc:

P Harry.H. Voigt, Esq.

. LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C. 20036 Mr.' Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68023 Metropolitan Planning Agency ATTN: Dagnia Prieditis 7000 West Center Road Omaha, Nebraska 68107

, 3

. Mr. Phillip Harrell, Resident Inspector

! .0 U.S. Nuclear Regulatory Commission P . v. Box 309' Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operatins C-E. Power Systems 7910.Woodmont Avenue Bethesda, Maryland 20814 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington,' Texas 76011 9

s

.e s

,.