Summarizes 860109 Mgt Meeting at Region II Ofc Re Facility Readiness Review Module, NSSS Supply & Foundation Matl & Backfill. Meeting Beneficial & Will Enable NRC to Conduct Evaluations.List of Attendees Encl
ML20137Q192
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/30/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8602060076
Download: ML20137Q192 (4)


Text

6 Oft 2td/,Yi6 kg J AN 3 01986 Georgia Power Company ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box'4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- V0GTLE FACILITY - DOCKET NO. 50-424 This refers to the management meeting conducted at your request in the NRC Region II Office on January 9,1986. This meeting wc , held to brief the NRC on the Vogtle Readiness Review Module entitled " Nuclear Steam Supply System" and '

" Foundation Material and Backfill."

It is our opinion that this meeting was beneficial and has provided a com' pre-hensive overview of the Vogtle Readiness Review Program and, specifically, these modules. This in-depth presentation will better enable the NRC to conduct its evaluations.

With respect to your proposal regarding a program review of the Vogtle Readiness Review Pilot Program, we concur that such a review would be beneficial. We will contact you in the near future to schedule this meeting and to develop a mutually agreeable agenda.

In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title l'),

Code of Federal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning these matters, we will be pleased to discuss them.

Sincerely, Mr"'!J_ P:.JD BY:

?,!ZON GACE J. Nelson Grace Regional Administrator

Enclosure:

List of Attendees cc w/ encl: (See page 2) 8602060076 B60130 .

PDR ADOCK 05000424 A PDR

\

I(\ seyr

JAN 3 01986 Georgia Power Company 2 cc w/ encl:

R. E. Conway, Senior Vice President &

Project Director D. O. Foster, Vice President, Project Support P. D. Rice, Vice President, Project Engineering R. H. Pinson, Vice President, Project Construction J. T. Beckham, Vice President &

General Manager - Operations R. A. Thomas, Vice President, Licensing C. W. Hayes, Vogtle Quality Assurance Manager W. C. Ramsey, Manager -

Readiness Review G. B. Bockhold, General Manager, Nuclear Operations L. T. Gucwa, Chief Nuclear Engineer M. H. Googe, Project Construction Manager

'E. D. Groover, Quality Assurance Site Manager -

Construction J. A. Bailey, Project Licensing Manager G. F. Trowbridge, Esq., Shaw, Pittman, r tts a and Trowbridge B. W. Chure.iill , Esq. , Shaw, Pittman, Potts and Trowbridge E. L. Blake, Jr. , Esq. , Shaw, Pittman, Potts and Trowbridge J. E. Joiner, Troutman, Sanders, Lockerman and Ashmore J. G. Ledbetter, Commissioner, Department of Human Resources C. H. Badger, Office of Planning and Budget D. Kirkland, III, Counsel, Office of the Consumer's Utility Council D. C. Teper, Georgians Against Nuclear Energy L. Fowler, Esq.

cc w/ encl: (Cont'd on paae 3)

JAN301986 Georgia Power Company 3 cc w/ enc 1: (cont'd)

T. Johnson, Executive Director, Educational Campaign for a Prosperous Georgia M. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board Panel Dr. O. H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel G. A. Linenberger, Jr., Administrative Judge, Atomic Safety and Licensing Board Pane.1 B. P. Garde, Citizens Clinic Director, Government Accountability Project bec w/ encl:

E. Reis, ELD W. M. Hill, IE M. Miller, NRR W. Brach, EDO A. Gibson, RII M. Sinkule, RII W. Rankin, RII NRC Resident Inspector Document Control Desk State of Georgia RI , RII

/ RII RI RII

'~

3 WRankin:jk MSinkule VBrownlee AGibson RWalker 1/g/86 1/p/86 1/g/86 1/ 86 1/t3 /86

ENCLOSURE LIST OF ATTENDEES JANUARY 9, 1986 U. S. Nuclear Regulatory Commission M. V. Sinkule, Chief, Reactor Projects Section (RPS) 3C, Division of Reactor Projects (DRP)

J. J. Blake, Chief, Materials and Processes Section, Division of Reactor Safety (DRS)

T. E. Conlon, Chief, Plant Systems Section, DRS W. H. Rankin, Project Engineer, RPS 3C, DRP J. R. Harris, Reactor Engineer, DRS G. A. Hallstrom, Reactor Engineer, DRS H. H. Livermore, Senior Resident Inspector, Construction, DRP W. M. Hill, Senior QA Specialist, IE J. R. Thompson, Project Engineer, NRR L. W. Heller, Senior Task Manager, NRR E. J. Sullivan, Materials Engineering Section Leader, NRR Georgia Power Company W. C. Ramsey, Manager, Readiness Review (RR)

W. M. Wright, Design Discipline Manager, RR R. McManus, Construction Discipline Manager, RR W. Kilker, Stone and Webster Staff Engineer