ML20137P755

From kanterella
Jump to navigation Jump to search
License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months
Date released: 05/30/2020 Download: ML20137P755


Proposed Tech Specs,Extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months
ML20137P756
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/31/1997
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20137P756 (18)
License Change Request ECR 96-00627,extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months
ML20137P751
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 03/31/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20137P751 (2)