Approves 860107 Request to Withhold Rev 1 to WCAP-11008, Connecticut Yankee (Haddam Neck) Steam Generator Sleeving (Mechanical Sleeve) from Public Disclosure Per 10CFR2.790
ML20137P521
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/30/1986
From: Frank Akstulewicz
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 8602050196
Download: ML20137P521 (4)


Text

'

/ ,k UNITED STATES

,{ g NUCLEAR REGULATORY COMMISSION

. L W ASHINGTON, D. C. 20655 l

  • %*****/ January 34, 1986 Docket No.: 50-213 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company P. O. Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM'PUBLIC DISCLOSURE Re: Haddam Neck Plant By .W/o WCAP-11009.WCAP-11008 Withheld (Ref 10CFR2.790)|letter dated January 7, 1986]], Connecticut Yankee Atomic Power Company (CYAPCO) submitted three copies of a report entitled:

WCAP-11008 Rev. I " Connecticut Yankee (Haddam Neck) Steam Generator Sleeving (Mechanical Sleeve)"

Further, you requested that these reports be withheld from public disclosure pursuant to 10 CFR 2.790.

The information in the sleeving report contains details of the design of the sleeves that are to be installed in the Haddam Neck Plant steam generators. The report also contains the design analysis, the test verification program and descriptions of the expanded mechanical plug, the rolled plug and the channel head decontamination process.

This information is customarily held in confidence and to the best of CYAPCO's knowledge and belief is not available in public sources. Westinghouse also contends that release of the information would enable a competitor to modify their product to better compete with Westinghouse without similar expenditure of resources, which would result in,the competitor selling at prices reflecting significantly lower costs.

We have reviewed the submittal and supporting affidavit based on the requirements and criteria of 10 CFR 2.790 and, on the basis of Westinghouse's statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.

It is our belief, pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended, that, at this time, the right of the public to be fully apprised of the subject information does not outweigh the need to protect Westinghouse's competitive position.

8602050196 e60130 PDR ADOCK 05000213 P PDR

t f January 30, 1986 '

, 1 Accordingly, we have determined that the information should be withheld

  • from public disclosure. We, therefore, approve your request for withholding pursuant to 10 CFR 2.790 and are withholding the reports described above as proprietary.

l Withholding from public inspection shall not affect the right, if any, of I i persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the ennsultants have ,

i signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available 3 ,. for public inspection, you should promptly notify the NRC. You should alsn understand that the NDC may have cause to review this determination in the future, such as if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NPC needs additional information from you or makes a deternination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely,

, b Francis Akstulewicz Integrated Assessment Project Directorate  ;

Division of PWR Licensing - R i cc: See Next Page I

s_,rm----~ w

~

, Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Operating Nuclear Plant Licensing Post Office Box 127E Northeast Utilities Service Company East Hampton, Connecticut 06424 Post Office Box 270 l Hartford, Connecticut 06141-0270 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Compary Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, Pennsylvania 19406

M/ c% so .2/3 January 30, 1986

-2 Accordingly, we have determined that the infomation should be withheld from public disclosure. We, therefore, approve your request for withholding pursuant to 10 CFR 2.790 and are withholding the reports described above as proprietary.

Withholding from public inspection shall not affect the right, if anv, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary infomation.

If the basis for withholding this information from public inspection should change in the future such that the infomation could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review this determination in the future, such as if the scope of a Freedom of Infomation Act reauest includes your information. In all review situations, if the NPC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, j.b Francis Akstulewicz integrated Assessment Proy-t Directorate Divisu n of PWR Licensino - B DISTRIBilTION Docket File /

ISAP Reading Local PDR NRC PDR NSIC FAkstulewicz OELD FMiraglia EJordan BGrimes JPartlow PAnderson ACRS (10)

CGrimes ISAP:DPL-Rhk IS/ fV 1 ISAP:DPL-

/

OElf.

f( t FAkstulewicz PA . son CGrires ESlomaker 01/jL/86 01//6/86 01/%/86 01/')?/86