ML20137P483
| ML20137P483 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 12/02/1985 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| Shared Package | |
| ML20137P486 | List: |
| References | |
| NUDOCS 8512050031 | |
| Download: ML20137P483 (2) | |
See also: IR 05000483/1985022
Text
_ _ _ _ _ _ _
.
.
- ..
r
Dr0 02 tM5
.
Docket No. 50-483
Union Electric Company
ATTN: Mr. Donald F. Schnell
Vice President - Nuclear
a
Post Office Box 149 - Mail Code 400
St. Louis, M0 63166
s. j
.
.m
Gentlemer.:
'
~
-
This refers to the special safety inspection conducted by Mr. R. A. Hasse of
~
this office on October 21 through November 8, 1985, of activities at Callaway
Nuclear Power Plant authorized by NRC Operating License No. NFP-25 and to the
,
a
discussion of our findings with Mr. S. E. Miltenberger and others of your staff
- -
at the conclusion of the inspection.
-
s , ::
The enclosed copy of our inspection report identifies areas examined during
the inspection.. Within these areas, the inspection consisted of a selective
- ,
examinationofproceduresandrepresentativerecords, observations,and
interviews with personnel.
This inspection was prompted by the importance of maintenance activities in
.
'
maintaining plant integrity and the resultant importance of detection and
correcting maintenance problems early in the plant's operating phase. The
. . .
.
relatively large number of maintenance-related LERs issued by Callaway did
2 3
indicate that some problems existed in this area. Therefore, this inspection
1-
was augmented to determine the probable root causes for these LERs, the
-
adequacy of maintenance program management, and the adequacy of .the
-
maintenance program itself in light of early operating experience.
No violations of NRC requirements were identified during the course of this
inspection. However, we do request that you give appropriate consideration
to the recommendations which are included in the attached inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
+
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
'
.
g.
f
._
h.
..,
h
'
O
4
bl
pgbf
?,
___.
_ _ _ _ _ _ __,
.
.
Union Electric Company
2
-
DEC 0 2 1995
We will gladly discuss any' questions you have concerning this inspection.
Sincerely.
-
I
/
Carl J. Pape e
o, Director '
Division of Reactor Safety
Enclosure:
Inspection' Report.
No. 50-483/85022(DRS)
cc,w/ enclosure:
W. .H. Weber, Manager, Nuclear
Construction
S.-E. Miltenberger, Plant Manager
.
R. L. Powers, Assistant Manager
Quality - Assurance
DCS/RSB (RIDS)
'
Licensing Fee Management Branch
Resident Inspector, RIII
Region IV
K. Drey
Chris R. Rogers, P.E.
Utility Division, Missouri
.Public Service Comission
SNUPPS
.
III
. RIII
R
8111,
RI
Am \\\\O
ins
!yes
g
Hehl
a re}lo
sse
b
a
ll )q
_
/ 37/ff
11/27/85
j
.