ML20137N991

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-9 & NPF-17,changing Tech Specs to Increase Time Allowed to Restore Inoperable Auxiliary Bldg Filtered Ventilation Exhaust Sys Train to Operable Status to 7 Days.Fee Paid
ML20137N991
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/16/1985
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20137N998 List:
References
NUDOCS 8509190467
Download: ML20137N991 (4)


Text

..

DmCE POWER COMPANY

'T

  • P.O. NOx 33189
  • HAL5. TUCKER CHARLOTTE. N.C. 28242 u Trtressorrue September 16, 1985 (704) o73-4s3:

Mr. liarold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. C. Adensam, Chief Licensing Branch No. 4

Subject:

McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Extension of Allowed Outage Time for VA System

Dear Sir:

Attached are proposed license amendments to facility operating licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively. The pro-posed amendments would increase the time allowed to restore an- inoperable auxiliary status to 7building days. filtered ventilation exhaust (VA) system train to operable Attachment 1 contains the proposed Technical Specification changes., Attachment 2 discusses the Justification and Safety Analysis to support the proposed changes (included in attachment 2 as attachment 2A is a detailed description of the VA system, along with 9 "as built" drawings (enclosed) with appropriate sectier.sof the VA system highlighted) . . Pursuant .to 10 CFR 50.91, Attachment 3 provides an analysis performed in accordance with the standards contained in 10 CFR 50.92 hazards which concludes that the proposed amendments do not involve a significant consideration.

determined to have no adverse safety or environmental impact.The proposed Pursuant to 10 CFR 170.3(y),170.12(c), and 170.21. Duke' Power proposes that this application contains license amendments for McGuire Units 1 and 2 subject to fees based on the full cost of the review (to be calculated using the applicable professional staff rates shown in 10 CFR 170.20) and must be e accompanied by an application fee of $150, with the NRC to bill Duke Power at six-month intervals for all accumulated costs for the application or when review is completed, whichever is earlier. Accordingly, please find enclosed a check in the amount of $150.00.

Should there be any questions or if additional information is required, please advise.

Very truly yours, f

<a M ,

L Hal B. Tucker j. c0I g' l PBN/VMK/hrp Attachments / Enclosures 0509190467 B50916 pc! g jdW J ro.

p

- o.o==9 PDR m 4 l58

' i Mr. Marcld R. Denten, Dirscter September 16, 1985 Page 2-t cc: w/ attachments only Mr. J. Nelson Grace, Regional Administrator  ?

U. S. Nuclear Regulatory Commission '

Region II I 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 fi Mr. Dayne Brown, Chief '

Radiation Protection Branch i Division of Facility Services .

Department of Human Resources l

P. O. Box 12200 j Raleigh, North Carolina 27605 '

\

r

.l Mr'. W. T. Orders '

1 NRC Resident Inspector McGuire Nuclear Station f

i i

i h

1  !

t

[

E T

I e

i  !

J  !

3 4

I e

(

i  !

. t a

f 1

i.

I

. _~ - _ - - - . . - . _ -

4 . +

Mr. Harold R. Denton, Director Septmeber 16, 1985 i Page 4 HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station License Nos. NPF-9 and NPF-17 and that all statements and matters set forth therein are true and correct to the best of his knowledge.  ;

j ' g.4 ' /s  !

Hal B. Tucker, Vice President Subscribed and sworn to before me this 16th day of September,1985.

I  ;

N>n Notary Public

f. -ew Y i
My Commission Expires
,

.- '0's!.

~

on 1999

, . . e,-f' .

'- y '<

n i ,

r h ;l t

i

., t i  !

. ATTACHMENT 1 Proposed McGuire Unit 1 and 2 Technical 5pectiication Chang c

i e

9 a e 9

. - . - . _ _ . _ - . - ,. . ~ .__ - ._ ., _- ,

. . .