o
.J
'Af 4
a -s 41 Nuclear Construction Division Telecopy 1
'552 5 December 2, 1985 hP United States Nuclear Regulatory Comnission Washington, DC 20555 ATTENTION: Mr. Geor e W. Knighton, Chief Licensin Branch 3 Office of Nuclear Reactor Regulation
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Detailed Control Roan Design Review -- Sunmary Report Gentlemen:
The attached are three signed original letters and three copies of the Sunmary Report which describes the methodology, findings, assessment, and im lenentation schedul e of the Beaver Valley Power Station Unit No. 2 (B PS-2) Control Roan Design Review (CRDR).
The review was conducted to ensure that the control roan and the energency and alternate shutdown panels would support operation during energency conditions, and to meet the requirenents of Iten I.D.1 of Supplenent 1 to NUREG-0737 published Generic Letter 82-33.
The review was conducted using the guidance of NUR Gs 0700, 0737, and 0801.
The Sunmary Report is divided into three volunes:
Volune 1 -- Sunmary Report Volune 2 -- Appendices Volune 3 -- Human Engineering Discrepancies (HEDs)
Two copies of the Sunmary Report have been forwarded directly to the NRC staff reviewer, Mr. R. Eckenrode.
The BVPS Final Safety Analysis Report will be anended to reference the CRDR in Chapter 18.0, "Hunan Factors."
If there are any questions in this regard, please contact Mr. R. E.
Martin, Manager, Regulatory Affairs Department, at (412) 787-5141.
SUBSCRIBED AND SWORN TO BEFORE ME THIS
<h/ DAY OF Decm i a, 1985.
By 7h
- k.. ~. F. 8 No J. J. Carey p
ROBINSON TOWNSHIP, ALLEGHEN t Wgg'[uo lic Vice President
- n... n u..
m.
MY COMMISSION EXPIRES OCTOBER 20,1986 MED/wjs Attachment cc: Mr..B.
K. Singh, Project Manager (w/o a) 3 Mr. G. Walton, NRC Resident Inspector (w/o a) 3 i
8512040121 851202 hDR ADOCK 05000412 pne
United States Nuclear R:gulatory Conunission Mr. George W. Knighton, Chief Detailed Control Room Design Review -- Stanary Report Page-2 COMMONWEALTH'0F PENNSYLVANIA.)
l SS:
COUNTY OF ALLEGHENY The Manager, Regulatory Aff airs, R. E. Martin, being first duly sworn, deposes, and says:
that he is Manager, Regulatory Affairs, of Duquesne Light Company, with legal authority to sign official correspondence on behalf of the Vice President, Nuclear Division, J. J. Carey, in ~ relation to licensing for Beaver Valley Power Station, Unit 2, and is therefore authorized to submit the foregoing on behalf of the applicant, hm.
3 INS D&te Manager, Regulatory Aff airs Swor and subscribed before me this day of [he,m4v, 1985.
$ru$ hurcA uk-Notary Public ANITA ELAIN2 riiTER, t!OT/5/ PUBLIC f
ROBINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXP!RES OCTOBER 20,1986 4
-.- W