Certifies Operability of All Required Sys for Initial Entry Into Mode 5 Per License NPF-46.Acceptance Criteria Met by Completion of Applicable Surveillance Tests or Preoperational Testing
ML20137M976
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/06/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-34479-EEVB, NUDOCS 8601290114
Download: ML20137M976 (1)


Text

Mcevgo

+

Arizona Nuclear Power Project 683 JM -8 M D 32 P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 January 6,1986 OU @

ANPP-34479-EEVBJr-91.03 Mr. John B. Martin Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission - Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Subject:

Certification of the Operability of All Required Systems for Initial Entry Into Mode 5 Docket No. STN-50-529 File:

86-056-026 Re:

PVNGS Unit 2 Operating License NPF-46

Dear Mr. Martin:

As required by the Palo Verde Nuclear Generating Unit 2 Operating License, NPF-46, I am hereby certifying that item 1.a of Attachment I to the license has been completed for the initial entry into Mode 5.

The operability of systems required for Mode 5 has been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifi-cations. This has been accomplished by the completion of the applicable surveillance tests or by pre-operational testing which verifies the meeting requirements of the Technical Specifications and which were performed within the required surveillance interval or by operability as demonstrated for Mode 6.

Very truly yours, k

CLLL.

LL E. E. Van Brunt, Jr.

Executive Vice President Project Director lb cc:

R. Zimmerman A. Gehr 8601290114 860106 PDR ADOCK 05000529 eQ P