ML20137M976
| ML20137M976 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/06/1986 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-34479-EEVB, NUDOCS 8601290114 | |
| Download: ML20137M976 (1) | |
Text
Mcevgo
+
Arizona Nuclear Power Project 683 JM -8 M D 32 P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 January 6,1986 OU @
ANPP-34479-EEVBJr-91.03 Mr. John B. Martin Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission - Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596
Subject:
Certification of the Operability of All Required Systems for Initial Entry Into Mode 5 Docket No. STN-50-529 File:
86-056-026 Re:
PVNGS Unit 2 Operating License NPF-46
Dear Mr. Martin:
As required by the Palo Verde Nuclear Generating Unit 2 Operating License, NPF-46, I am hereby certifying that item 1.a of Attachment I to the license has been completed for the initial entry into Mode 5.
The operability of systems required for Mode 5 has been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifi-cations. This has been accomplished by the completion of the applicable surveillance tests or by pre-operational testing which verifies the meeting requirements of the Technical Specifications and which were performed within the required surveillance interval or by operability as demonstrated for Mode 6.
Very truly yours, k
CLLL.
LL E. E. Van Brunt, Jr.
Executive Vice President Project Director lb cc:
R. Zimmerman A. Gehr 8601290114 860106 PDR ADOCK 05000529 eQ P
PDR if-ol
-