ML20137M940

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-271/85-34 on 851028-1101.No Violation Noted
ML20137M940
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/29/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20137M944 List:
References
NUDOCS 8512040037
Download: ML20137M940 (2)


See also: IR 05000271/1985034

Text

fii .

. .l .

s

NOV 2 0 '985

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN:

Mr. Warren P. Murphy

Vice President and Manager

of Operations

RD 5, Box 169

- Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject:

Inspection Report No. 50-271/85-34

This refers to the routine safety inspection conducted by Mr. C. Petrone of

.this office.on October 28 to November 1, 1985, at Vermont Yankee Nuclear Power

. Station, Vernon, Vermont of activities authorized by NRC License No. OPR-28

and to the discussions of our findings held by Mr. C. Petrone with Mr. J.

Pelletier and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records,' interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required.

Your cooperation'with us in this matter is appreciated.

Sincerely,

Original sige.es By:

DeeB.Bettenhausen

Stewart D. Ebneter, Director

l>

Division of Reactor Safety

Enclosure: NRC Region I Inspection Report No. 50-271/85-34

8512040037 851129

PDR

ADOCK 05000271

G

PDR

'

-0FFICIAL RECORD COPY

IR VY 85-34 - 0001.0.0

11/21/85

I (

,

-

~-i

-t

..

Vermont YankeeLNuclear

2

Power Corporation

.

cc'w/ encl:

R. W. Capstick, Licensing Engineer

W. F. -Conway, President and Chief Executive Officer

.

J.

P.- Pelletier, Plant Manager

Donald Hunter, Vice. President

-Cort Richardson, Vermont.Public Interest Research Group, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

'Naclear Safety Information Center (NSIC)

NRC Resident. Inspector

State of New Hampshire

1 State of Vermont

-bcc w/ enc 1:

Region.I Docket-Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

M. McBride, RI, Pilgrim

H. Eichenholz, SRI, Yankee

V. Rooney, LPM, NRR

,

$

RI:DRS

RI:DRS

RI:DRS

RI:DRS

Petr ne

Johnson

Bettenhausen

Ebneter

11/ /85

11/26/85

11/24/85

%.

9m

$1

/85

&

OFFICIAL RECORD COPY

IR VY 85-34 - 0002.0.0

.

11/21/85

.

_

.-

. . - -