ML20137M927
| ML20137M927 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/22/1986 |
| From: | Olshinski J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20137M932 | List: |
| References | |
| RTR-REGGD-01.033, RTR-REGGD-1.033 NUDOCS 8601290103 | |
| Download: ML20137M927 (2) | |
See also: IR 05000327/1985046
Text
OWelM
'
s
-
,o
.
.
4
JAN 2 21986
fennesseeValleyAuthority
ATTN: Mr. Steven A. White
Manager of Power and
Engineering (Nuclear)
6N38 A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
REPORT NOS. 50-327/85-46 AND 50-328/85-46
This refers to a special NRC team inspection conducted during the period of
December 9-13, 1985, of activities authorized by NRC Operating License
Nos. DPR-77 and DPR-79 for your Sequoyah facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff iden-
tified in the enclosed inspection report.
The inspection focused on selected areas of Sequoyah operational readiness
addressed in Mr. C. Dean's November 1,
1985 submittal in response to
Mr. W. Dircks' September 17, 1985 10 CFR 50.54(f) letter.
Specific areas
examined during the inspection are identified in the report. Within these areas,
the inspection consisted of selective examinations of procedures and representa-
tive records, interviews with personnel, and observation of activities in
progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
DRIGINAI $ lop # ay
e6otagg e@
DAVID M. yeugg p
7
g
John A. 01shinski
g
Deputy Regional Administrator for TVA
Enclosures:
1.
2.
Inspection Report Nos. 50-327/85-46
and 50-328/85-46
1
1
SE O l
,
,
.
.
.
'
2
JAN 2 21986
gc w/encls:
\\M. L. Abercrombie, Sequoyah Nuclear
Plant Site Director
. R. Wallace, Plant Manager
. W. Whitt, Chief, Nuclear
J Safety Review Staff
VD. L. Williams, Jr., Supervisor
/ Licensing Section
VG. B. Kirk, Compliance Staff
Supervisor
YJ.E. Wills,ProjectEngineer
bec w/encls:
. A. 01shinski, RII
i. R. Denton, NRR
.
s]. M. Taylor, IE
-}.B. Hayes,01
. L. Thompson, NRR
V1RC Resident Inspector
Document Control Desk
State of Tennessee
?
RII
RII
RII
.
&c{
T
Algna()onis:cdg
SWeise
DVerrelli
01/#/86
01/ W/86
01/ 8/86