l Omaha Public Power District i uh il 1623 Hamey Omaha. Nebraska 68102 2247
^{
402/536 4000 January 11, 1986 E
JAN ! 7 INb LIC-85-572 L
0.NJ Mr. Robert D. Martin, Regional Administrator U.
S.
Nuclear Regulatory Commission Region IV 611 Ryan Drive Suite 1000 Arlington, TX. 76011
References:
- 1) Docket No. 50-285
- 2) IE Inspection Report 85-09 dated July 26, 1985.
- 3) Letter OPPD (Andrews) to NRC (Martin) dated October 11, 1985 (LIC-85-465)
Dear Mr. Martin:
Environmental Qualification of Safety Related Electrical Equipment at the Fort Calhoun Station In late April 1985, a pilot inspection team audited the environmental qualification program for electrical equipment at the Fort Calhoun Station in order to determine compliance with 10 CFR 50.49.
The results of that pilot inspection were documented in Reference 2.
OPPD submitted Reference 3 advising your office of our resolution of the Reference 2 findings.
Subsequent to that letter, a team of two inspectors from the Region IV office returned to close items cited in Reference 2.
The team was successful in closing several of the items; however, other items were not closed.
In a management meeting in the Region IV offices on Thursday, December 13, 1985, OPPD met with several members of your staff to discuss final resolution of the inspection report items.
The agreements made at that meeting were documented by Reference 4.
In that meeting, it was noted that OPPD would submit a letter to the Region documenting that appropriate actions had been taken in each case.
- O 8601280201 G60111 f6 )
9(o PDR ADOCK 05000205 E
G PDR 4s w4 E mpioumen an opponunny
/O
i Mr. Rob 3rt D. Martin LIC-85-572 j
Page 2 i
4 4
i i
This letter serves to provide documentation that those actions described in Reference 4 have been completed.
It is OPPD's understanding that this. letter will allow you to close out the open items from the pilot inspection.
If you have additional questions concerning any of these items, please do not j
hesitate to contact us.
Sin
- rely,
}
8 C
{
R.L. Andrews Division Manager j
Nuclear Production RLA/DJM:me i
1
)
cc:
LeBoeuf, Lamb, Leiby and MacRae j
1333 New Hampshire Ave., N.W.
i Washington, DC 20036 1
)
E. G. Tourigny, NRC Project Manager j
P. H. Harrell,' Senior NRC Resident Inspector I
i i
I i_
i I
l i
e I
i i
l
.