ML20137M015

From kanterella
Jump to navigation Jump to search
Forwards Results of Testing/Insp of 11 Tendon Anchor Heads, Based on Commitment in 850812 LER 85-005-01 to Conduct Addl Tests & Insps on Tendon Anchor Heads Which Failed Due to Hydrogen Stress Cracking.Anchor Heads Acceptable
Date released: 05/30/2020 Download: ML20137M015


Inryco Post-Tensioning Div Jm Farley Nuclear Plant Anchor Head Investigation.
ML20137M042
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/19/1985
From: Henger G, Keating D, Noe P
INLAND STEEL CO.
To:
References
Download: ML20137M042 (18)
Inryco Post-Tensioning Div Jm Farley Nuclear Plant Anchor Head Investigation Operating Metallurgical Div Investigation 20617.
ML20137M033
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/19/1985
From: Henger G
INLAND STEEL CO.
To:
References
Download: ML20137M033 (34)
Forwards Results of Testing/Insp of 11 Tendon Anchor Heads, Based on Commitment in 850812 LER 85-005-01 to Conduct Addl Tests & Insps on Tendon Anchor Heads Which Failed Due to Hydrogen Stress Cracking.Anchor Heads Acceptable
ML20137M010
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/17/1986
From: Mcdonald R
ALABAMA POWER CO.
To: RUBENSTEIN L S
Office of Nuclear Reactor Regulation
References
Download: ML20137M010 (4)