Responds to NRC Re Violations Noted in Insp Rept 50-255/85-16.Corrective Actions:Addl Space Designated as Part of Emergency Operations Facility to Meet Guidance Specified in NUREG-0696
ML20137L941
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/07/1985
From: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20137L917 List:
References
RTR-NUREG-0696, RTR-NUREG-696 NUDOCS 8512030564
Download: ML20137L941 (2)


Text

-

)

Consumers Power x,,,,,,,,,

Company

~~

Nuclear Ucensing General Offices: 1945 West Pernali Road Jackson, MI 49201 e (517) 788-1636 November 7, 1985 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

RESPONSE TO INSPECf70N REPORT 85-016 Inspection Report 50-255/85-016 dated October 8, 1985 identified a weakness during the Palisades Nuclear Plant Emergency Preparedness Exercise that was not discussed during the management meeting held September 20, 1985 and, therefore, required a submittal by Consumers Power Company within 30 days of the date of the letter, which described our planned action for correcting this identified weakness.

Rakness No 5 (50-255/75-016)

"The present EOF does not contain minimum space and communications to meet NUREC-0696 guidelines.

Space must be provided for at least fifteen federal personnel (office space for five NRC, working space for nine NRC and one FEMA) in an emergency. At least three outside lines should be made available for NRC use.

Also, the HPN and ENS telephones should be relocated to the EOF main room, so that communicators will have ready access to posted plant status and health physics data."

Corrective Action To Be Taken to Correct the Identified Weakness 1.

Additional space will be designated as part of the EOF for use by both CPCo and NRC/FDIA personnel.

Revised floor plan will be cc. ipleted by December 1, 1985 and implemented by January 15, 1986.

8512030564 851127 PDR ADOCK 05000255 G

PDH HOV 1 2N OC1185-0006-NLO2

)

m 0

4 James G Koppler, Administrator, Region III 2

US Nuclear Regulatory Commission Response to Inspection Report 85-016 November 7, 1985 2.

A submittal requesting relocation of ENS and HPN lines will be submitted to NRC Region III by mid-November 1985.

3.

At least three additional outside lines will be designated for use by NRC personnel.

j Kenneth W Berry Director, Nuclear Licensing CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades l

OC1185-0006-NLO2

-