Forwards Insp Repts 50-277/85-37 & 50-278/85-38 on 851015-18.No Violation Noted.Steps Taken to Correct Violations Noted in Verified
ML20137L884
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/27/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20137L888 List:
References
NUDOCS 8512030555
Download: ML20137L884 (2)


See also: IR 05000277/1985037

Text

-

.

,

.

NOV 2 71985

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Combined Inspection Report Nos. 50-277/85-37 and 50-278/85-38

This refers to the routine inspection conducted _by Mr. A. Della Ratta of this

office on October 15-18, 1985, at the Peach Bottom Atomic Power Station, Delta,

Pennsylvania and at the Philadelphia Electric Company corporate offices, of

activities authorized by NRC License Nos. DPR-44 and DPR-56 and to the dis-

cussions of our findings held by Mr. Della Ratta with Mr. L. R. Rubino of your

staff at the conclusion of the inspection at your corporate offices. The plant

staff was advised of the inspection findings by the NRC's Senior Resident

Inspector on October 21, 1985.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the violations

brought to your attention in the enclosure to our letter dated January 11, 1982.

We have no further questions regarding your action at this time.

t

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Original Signed By

James H. Joy:2ec

eM20 g g h o [

Thomas T. Martin, Director

-

pga

Division of Radiation Safety

o

and Safeguards

0FFICIAL RECORD COPY

CIR PB 85-37/38 - 0001.0.0

11/25/85

,

{'.h

i \\

.

_

-

...

.

Philadelphia Electric tempany

2

NOV 2 71985

Enclosure:

Combined NRC Region I Inspection Report Nos. 50-277/85-37 and 50-278/85-56

cc w/ encl:

R. 'S. Fleischmann, Station Superintendent

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr. , Esquire

J. D. McGoldrick, Manager, Claims Division, legal Department

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic 51ectric

Eugene J. Bradley, Esquire, Assistant General Counsel

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

~

-

s

'

RI:D

R

RSS

SS

R: PASS

Del

atta/mmb/fi

K

g

Joyner

M ftin

11

/85

11XI/85

11/7I/85

11/

85

0FFICIAL RECORD COPY

CIR PB 85-37/38 - 0002.0.0

11/25/85